{"id":{"repo_id":"ubc","oai_identifier":"oai:circle.library.ubc.ca:2429/60317"},"canonical_url":"https://search.ndltd.org/etd/ubc/oai:circle.library.ubc.ca:2429/60317","repository":{"repo_id":"ubc","name":"University of British Columbia","base_url":"http://circle.library.ubc.ca/oai/request"},"display":{"title":"Analysis of the management of uncertainty in long-term planning for electric utilities","abstract":"Electric utilities engaging in integrated resource planning face a variety of uncertainties which complicate the development of robust plans. These uncertainties occur in variables such as demand growth, energy price, green house gas regulations, and water inflows for hydroelectric-dominated utilities, just to name a few. This study examines the current planning methods in use among (largely North American) utilities with a particular focus on the features of each method that manage or mitigate uncertainty. The two most common planning methods (portfolio-based and scenario-based planning) are analysed and their advantages, disadvantages, potential alterations, and circumstances of best application are evaluated. These findings are then applied to the case of BC Hydro, one of the largest electric utilities in Canada, with recommendations for changes to their current planning process.","abstract_html":"Electric utilities engaging in integrated resource planning face a variety of uncertainties which complicate the development of robust plans. These uncertainties occur in variables such as demand growth, energy price, green house gas regulations, and water inflows for hydroelectric-dominated utilities, just to name a few. This study examines the current planning methods in use among (largely North American) utilities with a particular focus on the features of each method that manage or mitigate uncertainty. The two most common planning methods (portfolio-based and scenario-based planning) are analysed and their advantages, disadvantages, potential alterations, and circumstances of best application are evaluated. These findings are then applied to the case of BC Hydro, one of the largest electric utilities in Canada, with recommendations for changes to their current planning process.","abstract_has_math":false,"creators":["Irvine, Laura Jean"],"institution":"University of British Columbia","degree_name":"Master of Applied Science - MASc","degree_level":"master's","degree_discipline":"Civil Engineering","degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2017,"date_issued":"2017","date_published":"2017","updated_at":"2026-11-19T15:00:54Z","subjects":[],"languages":["eng"],"rights":["Attribution-NonCommercial-NoDerivatives 4.0 International"],"rights_urls":["http://creativecommons.org/licenses/by-nc-nd/4.0/"],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/2429/60317","outbound_label":"Handle","outbound_source":"dc:identifier","record_url":"http://hdl.handle.net/2429/60317","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier","download_url":"http://circle.library.ubc.ca/bitstream/2429/60317/4/ubc_2017_february_irvine_laura.pdf","download_label":"Download PDF","download_source":"dc:identifier","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"http://circle.library.ubc.ca/oai/request?verb=GetRecord&metadataPrefix=etdms&identifier=oai%3Acircle.library.ubc.ca%3A2429%2F60317","prefix":"etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:creator","label":"Author","values":["Irvine, Laura Jean"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2017"]},{"key":"dc:publisher","label":"Institution","values":["University of British Columbia"]},{"key":"dc:type","label":"Dc Type","values":["Text"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Civil Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["master's"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Applied Science - MASc"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of British Columbia"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["eng"]},{"key":"dc:rights","label":"Dc Rights","values":["http://creativecommons.org/licenses/by-nc-nd/4.0/","Attribution-NonCommercial-NoDerivatives 4.0 International"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["http://hdl.handle.net/2429/60317","http://circle.library.ubc.ca/bitstream/2429/60317/4/ubc_2017_february_irvine_laura.pdf"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["Electric utilities engaging in integrated resource planning face a variety of uncertainties which complicate the development of robust plans. These uncertainties occur in variables such as demand growth, energy price, green house gas regulations, and water inflows for hydroelectric-dominated utilities, just to name a few. This study examines the current planning methods in use among (largely North American) utilities with a particular focus on the features of each method that manage or mitigate uncertainty. The two most common planning methods (portfolio-based and scenario-based planning) are analysed and their advantages, disadvantages, potential alterations, and circumstances of best application are evaluated. These findings are then applied to the case of BC Hydro, one of the largest electric utilities in Canada, with recommendations for changes to their current planning process."]},{"key":"dc:format","label":"Dc Format","values":["1084001","application/pdf"]},{"key":"dc:title","label":"Title","values":["Analysis of the management of uncertainty in long-term planning for electric utilities"]}]}],"canonical_facts":{"dc:creator":["Irvine, Laura Jean"],"dc:date":["2017"],"dc:description":["Electric utilities engaging in integrated resource planning face a variety of uncertainties which complicate the development of robust plans. These uncertainties occur in variables such as demand growth, energy price, green house gas regulations, and water inflows for hydroelectric-dominated utilities, just to name a few. This study examines the current planning methods in use among (largely North American) utilities with a particular focus on the features of each method that manage or mitigate uncertainty. The two most common planning methods (portfolio-based and scenario-based planning) are analysed and their advantages, disadvantages, potential alterations, and circumstances of best application are evaluated. These findings are then applied to the case of BC Hydro, one of the largest electric utilities in Canada, with recommendations for changes to their current planning process."],"dc:format":["1084001","application/pdf"],"dc:identifier":["http://hdl.handle.net/2429/60317","http://circle.library.ubc.ca/bitstream/2429/60317/4/ubc_2017_february_irvine_laura.pdf"],"dc:language":["eng"],"dc:publisher":["University of British Columbia"],"dc:rights":["http://creativecommons.org/licenses/by-nc-nd/4.0/","Attribution-NonCommercial-NoDerivatives 4.0 International"],"dc:title":["Analysis of the management of uncertainty in long-term planning for electric utilities"],"dc:type":["Text"],"thesis:degree_discipline":["Civil Engineering"],"thesis:degree_level":["master's"],"thesis:degree_name":["Master of Applied Science - MASc"],"thesis:institution_name":["University of British Columbia"]},"updated_at":"2026-11-19T15:00:54Z"}