{"id":{"repo_id":"ubc","oai_identifier":"oai:circle.library.ubc.ca:2429/62853"},"canonical_url":"https://search.ndltd.org/etd/ubc/oai:circle.library.ubc.ca:2429/62853","repository":{"repo_id":"ubc","name":"University of British Columbia","base_url":"http://circle.library.ubc.ca/oai/request"},"display":{"title":"Cut-off grade optimization of open pit mines with multiple processing streams","abstract":"In this study, dynamic cut-off grades and multiple processing streams are used to maximize the value of a mining project based on a finite resource. Optimal cut-off policies are generated using Lane’s method for determining cut-off grade. By maximizing the present value of future profits as a function of cut-off grade, mine project value is increased over the traditional break-even approach. A method for determining multiple cut-off grades at a single deposit was applied to analyze the impact that changes in processing capacity have on NPV. It was found that additional capacity related to a separate mill facility resulted in an economic reclassification of ore and waste. Grade tonnage data used in the case study was simulated to represent the geologic uncertainty associated to low-grade mineral deposits. Results from the hypothetical case study examined in this thesis reveal that a low-grade open pit gold mine will benefit from the use of multiple processing streams when a dynamic cut-off policy is applied. Particularly, when incorporating a “high grade” modular processing stream to maximize the potential revenue of the mineralized material. This means that for a given set of design, production and geological parameters, the classification of ore and waste is what ultimately determines the NPV of a mining project.","abstract_html":"In this study, dynamic cut-off grades and multiple processing streams are used to maximize the value of a mining project based on a finite resource. Optimal cut-off policies are generated using Lane’s method for determining cut-off grade. By maximizing the present value of future profits as a function of cut-off grade, mine project value is increased over the traditional break-even approach. A method for determining multiple cut-off grades at a single deposit was applied to analyze the impact that changes in processing capacity have on NPV. It was found that additional capacity related to a separate mill facility resulted in an economic reclassification of ore and waste. Grade tonnage data used in the case study was simulated to represent the geologic uncertainty associated to low-grade mineral deposits. Results from the hypothetical case study examined in this thesis reveal that a low-grade open pit gold mine will benefit from the use of multiple processing streams when a dynamic cut-off policy is applied. Particularly, when incorporating a “high grade” modular processing stream to maximize the potential revenue of the mineralized material. This means that for a given set of design, production and geological parameters, the classification of ore and waste is what ultimately determines the NPV of a mining project.","abstract_has_math":false,"creators":["Pettingell, Michael Nash"],"institution":"University of British Columbia","degree_name":"Master of Applied Science - MASc","degree_level":"master's","degree_discipline":"Mining Engineering","degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2017,"date_issued":"2017","date_published":"2017","updated_at":"2026-11-19T15:01:36Z","subjects":[],"languages":["eng"],"rights":["Attribution-NonCommercial-NoDerivatives 4.0 International"],"rights_urls":["http://creativecommons.org/licenses/by-nc-nd/4.0/"],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/2429/62853","outbound_label":"Handle","outbound_source":"dc:identifier","record_url":"http://hdl.handle.net/2429/62853","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier","download_url":"http://circle.library.ubc.ca/bitstream/2429/62853/8/ubc_2017_november_pettingell_michael.pdf","download_label":"Download PDF","download_source":"dc:identifier","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"http://circle.library.ubc.ca/oai/request?verb=GetRecord&metadataPrefix=etdms&identifier=oai%3Acircle.library.ubc.ca%3A2429%2F62853","prefix":"etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:creator","label":"Author","values":["Pettingell, Michael Nash"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2017"]},{"key":"dc:publisher","label":"Institution","values":["University of British Columbia"]},{"key":"dc:type","label":"Dc Type","values":["Text"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Mining Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["master's"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Applied Science - MASc"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of British Columbia"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["eng"]},{"key":"dc:rights","label":"Dc Rights","values":["http://creativecommons.org/licenses/by-nc-nd/4.0/","Attribution-NonCommercial-NoDerivatives 4.0 International"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["http://hdl.handle.net/2429/62853","http://circle.library.ubc.ca/bitstream/2429/62853/8/ubc_2017_november_pettingell_michael.pdf"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["In this study, dynamic cut-off grades and multiple processing streams are used to maximize the value of a mining project based on a finite resource. Optimal cut-off policies are generated using Lane’s method for determining cut-off grade. By maximizing the present value of future profits as a function of cut-off grade, mine project value is increased over the traditional break-even approach. A method for determining multiple cut-off grades at a single deposit was applied to analyze the impact that changes in processing capacity have on NPV. It was found that additional capacity related to a separate mill facility resulted in an economic reclassification of ore and waste. Grade tonnage data used in the case study was simulated to represent the geologic uncertainty associated to low-grade mineral deposits. Results from the hypothetical case study examined in this thesis reveal that a low-grade open pit gold mine will benefit from the use of multiple processing streams when a dynamic cut-off policy is applied. Particularly, when incorporating a “high grade” modular processing stream to maximize the potential revenue of the mineralized material. This means that for a given set of design, production and geological parameters, the classification of ore and waste is what ultimately determines the NPV of a mining project."]},{"key":"dc:format","label":"Dc Format","values":["3475137","application/pdf"]},{"key":"dc:title","label":"Title","values":["Cut-off grade optimization of open pit mines with multiple processing streams"]}]}],"canonical_facts":{"dc:creator":["Pettingell, Michael Nash"],"dc:date":["2017"],"dc:description":["In this study, dynamic cut-off grades and multiple processing streams are used to maximize the value of a mining project based on a finite resource. Optimal cut-off policies are generated using Lane’s method for determining cut-off grade. By maximizing the present value of future profits as a function of cut-off grade, mine project value is increased over the traditional break-even approach. A method for determining multiple cut-off grades at a single deposit was applied to analyze the impact that changes in processing capacity have on NPV. It was found that additional capacity related to a separate mill facility resulted in an economic reclassification of ore and waste. Grade tonnage data used in the case study was simulated to represent the geologic uncertainty associated to low-grade mineral deposits. Results from the hypothetical case study examined in this thesis reveal that a low-grade open pit gold mine will benefit from the use of multiple processing streams when a dynamic cut-off policy is applied. Particularly, when incorporating a “high grade” modular processing stream to maximize the potential revenue of the mineralized material. This means that for a given set of design, production and geological parameters, the classification of ore and waste is what ultimately determines the NPV of a mining project."],"dc:format":["3475137","application/pdf"],"dc:identifier":["http://hdl.handle.net/2429/62853","http://circle.library.ubc.ca/bitstream/2429/62853/8/ubc_2017_november_pettingell_michael.pdf"],"dc:language":["eng"],"dc:publisher":["University of British Columbia"],"dc:rights":["http://creativecommons.org/licenses/by-nc-nd/4.0/","Attribution-NonCommercial-NoDerivatives 4.0 International"],"dc:title":["Cut-off grade optimization of open pit mines with multiple processing streams"],"dc:type":["Text"],"thesis:degree_discipline":["Mining Engineering"],"thesis:degree_level":["master's"],"thesis:degree_name":["Master of Applied Science - MASc"],"thesis:institution_name":["University of British Columbia"]},"updated_at":"2026-11-19T15:01:36Z"}