{"id":{"repo_id":"ubc","oai_identifier":"oai:circle.library.ubc.ca:2429/6590"},"canonical_url":"https://search.ndltd.org/etd/ubc/oai:circle.library.ubc.ca:2429/6590","repository":{"repo_id":"ubc","name":"University of British Columbia","base_url":"http://circle.library.ubc.ca/oai/request"},"display":{"title":"Computer assisted methods selection for high-rise construction","abstract":"The intention of this thesis is to represent construction methods and resources, determine how their description can be tailored to the project at hand, represent the construction context and key attributes of the design solution, and show how methods and physical description should be linked. Additionally, work is directed at the spectrum of issues that have to be considered in order to judge the feasibility of a method for a given construction and design context, and at how the reasoning about the applicability of a given method to a specific context can at least be partially automated. Several of the concepts developed have been implemented in a research project management system called REPCON. The context of high-rise building construction has been used as a project context.","abstract_html":"The intention of this thesis is to represent construction methods and resources, determine how their description can be tailored to the project at hand, represent the construction context and key attributes of the design solution, and show how methods and physical description should be linked. Additionally, work is directed at the spectrum of issues that have to be considered in order to judge the feasibility of a method for a given construction and design context, and at how the reasoning about the applicability of a given method to a specific context can at least be partially automated. Several of the concepts developed have been implemented in a research project management system called REPCON. The context of high-rise building construction has been used as a project context.","abstract_has_math":false,"creators":["Sharma, Anoop"],"institution":"University of British Columbia","degree_name":"Master of Applied Science - MASc","degree_level":"master's","degree_discipline":"Civil Engineering","degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":1997,"date_issued":"1997","date_published":"1997","updated_at":"2026-11-19T14:26:29Z","subjects":[],"languages":["eng"],"rights":["For non-commercial purposes only, such as research, private study and education. Additional conditions apply, see Terms of Use https://open.library.ubc.ca/terms_of_use."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/2429/6590","outbound_label":"Handle","outbound_source":"dc:identifier","record_url":"http://hdl.handle.net/2429/6590","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier","download_url":"http://circle.library.ubc.ca/bitstream/2429/6590/1/ubc_1997-0598.pdf","download_label":"Download PDF","download_source":"dc:identifier","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"http://circle.library.ubc.ca/oai/request?verb=GetRecord&metadataPrefix=etdms&identifier=oai%3Acircle.library.ubc.ca%3A2429%2F6590","prefix":"etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:creator","label":"Author","values":["Sharma, Anoop"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["1997"]},{"key":"dc:publisher","label":"Institution","values":["University of British Columbia"]},{"key":"dc:type","label":"Dc Type","values":["Text"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Civil Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["master's"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Applied Science - MASc"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of British Columbia"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["eng"]},{"key":"dc:rights","label":"Dc Rights","values":["For non-commercial purposes only, such as research, private study and education. Additional conditions apply, see Terms of Use https://open.library.ubc.ca/terms_of_use."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["http://hdl.handle.net/2429/6590","http://circle.library.ubc.ca/bitstream/2429/6590/1/ubc_1997-0598.pdf"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["The intention of this thesis is to represent construction methods and resources, determine how their description can be tailored to the project at hand, represent the construction context and key attributes of the design solution, and show how methods and physical description should be linked. Additionally, work is directed at the spectrum of issues that have to be considered in order to judge the feasibility of a method for a given construction and design context, and at how the reasoning about the applicability of a given method to a specific context can at least be partially automated. Several of the concepts developed have been implemented in a research project management system called REPCON. The context of high-rise building construction has been used as a project context."]},{"key":"dc:format","label":"Dc Format","values":["5589932","application/pdf"]},{"key":"dc:title","label":"Title","values":["Computer assisted methods selection for high-rise construction"]}]}],"canonical_facts":{"dc:creator":["Sharma, Anoop"],"dc:date":["1997"],"dc:description":["The intention of this thesis is to represent construction methods and resources, determine how their description can be tailored to the project at hand, represent the construction context and key attributes of the design solution, and show how methods and physical description should be linked. Additionally, work is directed at the spectrum of issues that have to be considered in order to judge the feasibility of a method for a given construction and design context, and at how the reasoning about the applicability of a given method to a specific context can at least be partially automated. Several of the concepts developed have been implemented in a research project management system called REPCON. The context of high-rise building construction has been used as a project context."],"dc:format":["5589932","application/pdf"],"dc:identifier":["http://hdl.handle.net/2429/6590","http://circle.library.ubc.ca/bitstream/2429/6590/1/ubc_1997-0598.pdf"],"dc:language":["eng"],"dc:publisher":["University of British Columbia"],"dc:rights":["For non-commercial purposes only, such as research, private study and education. Additional conditions apply, see Terms of Use https://open.library.ubc.ca/terms_of_use."],"dc:title":["Computer assisted methods selection for high-rise construction"],"dc:type":["Text"],"thesis:degree_discipline":["Civil Engineering"],"thesis:degree_level":["master's"],"thesis:degree_name":["Master of Applied Science - MASc"],"thesis:institution_name":["University of British Columbia"]},"updated_at":"2026-11-19T14:26:29Z"}