{"id":{"repo_id":"ubc","oai_identifier":"oai:circle.library.ubc.ca:2429/83645"},"canonical_url":"https://search.ndltd.org/etd/ubc/oai:circle.library.ubc.ca:2429/83645","repository":{"repo_id":"ubc","name":"University of British Columbia","base_url":"http://circle.library.ubc.ca/oai/request"},"display":{"title":"Parameter-space dependence in a stochastic dual dynamic programming model of a multireservoir hydropower system","abstract":"Stochastic Dual Dynamic Programming is a heuristic stochastic optimization algorithm used to analyze multistage decision making problems with stochastic variables through Benders decomposition and solvable linear approximations. Benders cuts are utilized to develop a piecewise linear approximation of a 'benefit-to-go' or future value function at each stage. This thesis assesses BC Hydro's Columbia and Peace River hydroelectric network representation in a multistage stochastic optimization problem with a finite planning horizon. The model attempts to maximize the 'water value' across the MCA, GMS, and ARD facilities over a duration of five years. Existing model parameter-space is heavily restricted due to the use of static market prices and load demands. Changes have been proposed to expand on the current parameter-space pertaining to inflow dependent market electricity prices through the implementation of seasonally forecasted price and load blocks. Preliminary results indicate the existing model implementation does not provide sufficient parameter-space coverage with respect to market prices, resulting in possible over-estimations of water value as the model approaches convergence.","abstract_html":"Stochastic Dual Dynamic Programming is a heuristic stochastic optimization algorithm used to analyze multistage decision making problems with stochastic variables through Benders decomposition and solvable linear approximations. Benders cuts are utilized to develop a piecewise linear approximation of a &#x27;benefit-to-go&#x27; or future value function at each stage. This thesis assesses BC Hydro&#x27;s Columbia and Peace River hydroelectric network representation in a multistage stochastic optimization problem with a finite planning horizon. The model attempts to maximize the &#x27;water value&#x27; across the MCA, GMS, and ARD facilities over a duration of five years. Existing model parameter-space is heavily restricted due to the use of static market prices and load demands. Changes have been proposed to expand on the current parameter-space pertaining to inflow dependent market electricity prices through the implementation of seasonally forecasted price and load blocks. Preliminary results indicate the existing model implementation does not provide sufficient parameter-space coverage with respect to market prices, resulting in possible over-estimations of water value as the model approaches convergence.","abstract_has_math":false,"creators":["Mitchell, Kyle Terrence"],"institution":"University of British Columbia","degree_name":"Master of Applied Science - MASc","degree_level":"master's","degree_discipline":"Civil Engineering","degree_department":null,"school":null,"contributors":["Shawwash, Ziad K. Elias"],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2023,"date_issued":"2023","date_published":"2023","updated_at":"2026-11-19T15:13:24Z","subjects":[],"languages":["eng"],"rights":["Attribution-NonCommercial-NoDerivatives 4.0 International"],"rights_urls":["http://creativecommons.org/licenses/by-nc-nd/4.0/"],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/2429/83645","outbound_label":"Handle","outbound_source":"dc:identifier","record_url":"http://hdl.handle.net/2429/83645","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier","download_url":"http://circle.library.ubc.ca/bitstream/2429/83645/6/ubc_2023_may_mitchell_kyle.pdf","download_label":"Download PDF","download_source":"dc:identifier","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"http://circle.library.ubc.ca/oai/request?verb=GetRecord&metadataPrefix=etdms&identifier=oai%3Acircle.library.ubc.ca%3A2429%2F83645","prefix":"etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["Shawwash, Ziad K. Elias"]},{"key":"dc:creator","label":"Author","values":["Mitchell, Kyle Terrence"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2023"]},{"key":"dc:publisher","label":"Institution","values":["University of British Columbia"]},{"key":"dc:type","label":"Dc Type","values":["Text"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Civil Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["master's"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Applied Science - MASc"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of British Columbia"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["eng"]},{"key":"dc:rights","label":"Dc Rights","values":["http://creativecommons.org/licenses/by-nc-nd/4.0/","Attribution-NonCommercial-NoDerivatives 4.0 International"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["http://hdl.handle.net/2429/83645","http://circle.library.ubc.ca/bitstream/2429/83645/6/ubc_2023_may_mitchell_kyle.pdf"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["Stochastic Dual Dynamic Programming is a heuristic stochastic optimization algorithm used to analyze multistage decision making problems with stochastic variables through Benders decomposition and solvable linear approximations. Benders cuts are utilized to develop a piecewise linear approximation of a 'benefit-to-go' or future value function at each stage. This thesis assesses BC Hydro's Columbia and Peace River hydroelectric network representation in a multistage stochastic optimization problem with a finite planning horizon. The model attempts to maximize the 'water value' across the MCA, GMS, and ARD facilities over a duration of five years. Existing model parameter-space is heavily restricted due to the use of static market prices and load demands. Changes have been proposed to expand on the current parameter-space pertaining to inflow dependent market electricity prices through the implementation of seasonally forecasted price and load blocks. Preliminary results indicate the existing model implementation does not provide sufficient parameter-space coverage with respect to market prices, resulting in possible over-estimations of water value as the model approaches convergence."]},{"key":"dc:format","label":"Dc Format","values":["15713443","application/pdf"]},{"key":"dc:title","label":"Title","values":["Parameter-space dependence in a stochastic dual dynamic programming model of a multireservoir hydropower system"]}]}],"canonical_facts":{"dc:contributor":["Shawwash, Ziad K. Elias"],"dc:creator":["Mitchell, Kyle Terrence"],"dc:date":["2023"],"dc:description":["Stochastic Dual Dynamic Programming is a heuristic stochastic optimization algorithm used to analyze multistage decision making problems with stochastic variables through Benders decomposition and solvable linear approximations. Benders cuts are utilized to develop a piecewise linear approximation of a 'benefit-to-go' or future value function at each stage. This thesis assesses BC Hydro's Columbia and Peace River hydroelectric network representation in a multistage stochastic optimization problem with a finite planning horizon. The model attempts to maximize the 'water value' across the MCA, GMS, and ARD facilities over a duration of five years. Existing model parameter-space is heavily restricted due to the use of static market prices and load demands. Changes have been proposed to expand on the current parameter-space pertaining to inflow dependent market electricity prices through the implementation of seasonally forecasted price and load blocks. Preliminary results indicate the existing model implementation does not provide sufficient parameter-space coverage with respect to market prices, resulting in possible over-estimations of water value as the model approaches convergence."],"dc:format":["15713443","application/pdf"],"dc:identifier":["http://hdl.handle.net/2429/83645","http://circle.library.ubc.ca/bitstream/2429/83645/6/ubc_2023_may_mitchell_kyle.pdf"],"dc:language":["eng"],"dc:publisher":["University of British Columbia"],"dc:rights":["http://creativecommons.org/licenses/by-nc-nd/4.0/","Attribution-NonCommercial-NoDerivatives 4.0 International"],"dc:title":["Parameter-space dependence in a stochastic dual dynamic programming model of a multireservoir hydropower system"],"dc:type":["Text"],"thesis:degree_discipline":["Civil Engineering"],"thesis:degree_level":["master's"],"thesis:degree_name":["Master of Applied Science - MASc"],"thesis:institution_name":["University of British Columbia"]},"updated_at":"2026-11-19T15:13:24Z"}