{"id":{"repo_id":"ubc","oai_identifier":"oai:circle.library.ubc.ca:2429/87457"},"canonical_url":"https://search.ndltd.org/etd/ubc/oai:circle.library.ubc.ca:2429/87457","repository":{"repo_id":"ubc","name":"University of British Columbia","base_url":"http://circle.library.ubc.ca/oai/request"},"display":{"title":"Application of geotechnical numerical modelling of sill pillar mining options to aid value-driven decision-making","abstract":"Sill pillars divide vertically extensive orebodies into mining blocks to allow concurrent mining operations. Sill pillars also provide regional stability to a mining district and are usually one of the last volumes of ore to be mined. The initial design for sill pillar mining is often only high level, made without knowledge of the ground performance. The final design and planning occurs many years or decades after the initial design was made, which did not account for operational learnings. This thesis describes the decision process for positioning the overcut development within a sill pillar while considering operational and geotechnical issues. There are three possible scenarios for the placement of the overcut development: in the sill pillar, in the backfilled stope directly above the sill pillar, or a combination of the sill pillar and backfill. Numerical modelling (finite element) was used to aid in the decision-making process for the location of the overcut development. In addition, this modelling was used to understand the potential failure mechanisms and forecast the mining conditions during development and production in a sill pillar. Results from the numerical modelling have shown that mining in the adjacent blocks caused a decrease in stress in the sill pillar. Potential failure mechanisms include the deformation and unravelling of the overcut development and the failure of the longhole stope walls due to this decrease in stress. To apply to an operating mine, the numerical model must be of sufficient detail to capture the mechanics of the problem yet be completed in a timeframe to support the decision-making process. Each of the operational strengths and weaknesses of the overcut development scenarios were evaluated alongside the numerical models to understand the implications of each development scenario. Using a combination of numerical modelling and operational considerations, the location of the overcut development can be decided to maintain safe access for underground personnel during the recovery of the sill pillar.","abstract_html":"Sill pillars divide vertically extensive orebodies into mining blocks to allow concurrent mining operations. Sill pillars also provide regional stability to a mining district and are usually one of the last volumes of ore to be mined. The initial design for sill pillar mining is often only high level, made without knowledge of the ground performance. The final design and planning occurs many years or decades after the initial design was made, which did not account for operational learnings. This thesis describes the decision process for positioning the overcut development within a sill pillar while considering operational and geotechnical issues. There are three possible scenarios for the placement of the overcut development: in the sill pillar, in the backfilled stope directly above the sill pillar, or a combination of the sill pillar and backfill. Numerical modelling (finite element) was used to aid in the decision-making process for the location of the overcut development. In addition, this modelling was used to understand the potential failure mechanisms and forecast the mining conditions during development and production in a sill pillar. Results from the numerical modelling have shown that mining in the adjacent blocks caused a decrease in stress in the sill pillar. Potential failure mechanisms include the deformation and unravelling of the overcut development and the failure of the longhole stope walls due to this decrease in stress. To apply to an operating mine, the numerical model must be of sufficient detail to capture the mechanics of the problem yet be completed in a timeframe to support the decision-making process. Each of the operational strengths and weaknesses of the overcut development scenarios were evaluated alongside the numerical models to understand the implications of each development scenario. Using a combination of numerical modelling and operational considerations, the location of the overcut development can be decided to maintain safe access for underground personnel during the recovery of the sill pillar.","abstract_has_math":false,"creators":["Archibald, Craig James"],"institution":"University of British Columbia","degree_name":"Master of Applied Science - MASc","degree_level":"master's","degree_discipline":"Mining Engineering","degree_department":null,"school":null,"contributors":["Elmo, Davide"],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2024,"date_issued":"2024","date_published":"2024","updated_at":"2026-11-19T15:14:00Z","subjects":[],"languages":["eng"],"rights":["Attribution-NonCommercial-NoDerivatives 4.0 International"],"rights_urls":["http://creativecommons.org/licenses/by-nc-nd/4.0/"],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/2429/87457","outbound_label":"Handle","outbound_source":"dc:identifier","record_url":"http://hdl.handle.net/2429/87457","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier","download_url":"http://circle.library.ubc.ca/bitstream/2429/87457/1/ubc_2024_may_archibald_craig.pdf","download_label":"Download PDF","download_source":"dc:identifier","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"http://circle.library.ubc.ca/oai/request?verb=GetRecord&metadataPrefix=etdms&identifier=oai%3Acircle.library.ubc.ca%3A2429%2F87457","prefix":"etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["Elmo, Davide"]},{"key":"dc:creator","label":"Author","values":["Archibald, Craig James"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2024"]},{"key":"dc:publisher","label":"Institution","values":["University of British Columbia"]},{"key":"dc:type","label":"Dc Type","values":["Text"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Mining Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["master's"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Applied Science - MASc"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of British Columbia"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["eng"]},{"key":"dc:rights","label":"Dc Rights","values":["http://creativecommons.org/licenses/by-nc-nd/4.0/","Attribution-NonCommercial-NoDerivatives 4.0 International"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["http://hdl.handle.net/2429/87457","http://circle.library.ubc.ca/bitstream/2429/87457/1/ubc_2024_may_archibald_craig.pdf"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["Sill pillars divide vertically extensive orebodies into mining blocks to allow concurrent mining operations. Sill pillars also provide regional stability to a mining district and are usually one of the last volumes of ore to be mined. The initial design for sill pillar mining is often only high level, made without knowledge of the ground performance. The final design and planning occurs many years or decades after the initial design was made, which did not account for operational learnings. This thesis describes the decision process for positioning the overcut development within a sill pillar while considering operational and geotechnical issues. There are three possible scenarios for the placement of the overcut development: in the sill pillar, in the backfilled stope directly above the sill pillar, or a combination of the sill pillar and backfill. Numerical modelling (finite element) was used to aid in the decision-making process for the location of the overcut development. In addition, this modelling was used to understand the potential failure mechanisms and forecast the mining conditions during development and production in a sill pillar. Results from the numerical modelling have shown that mining in the adjacent blocks caused a decrease in stress in the sill pillar. Potential failure mechanisms include the deformation and unravelling of the overcut development and the failure of the longhole stope walls due to this decrease in stress. To apply to an operating mine, the numerical model must be of sufficient detail to capture the mechanics of the problem yet be completed in a timeframe to support the decision-making process. Each of the operational strengths and weaknesses of the overcut development scenarios were evaluated alongside the numerical models to understand the implications of each development scenario. Using a combination of numerical modelling and operational considerations, the location of the overcut development can be decided to maintain safe access for underground personnel during the recovery of the sill pillar."]},{"key":"dc:format","label":"Dc Format","values":["7585671","application/pdf"]},{"key":"dc:title","label":"Title","values":["Application of geotechnical numerical modelling of sill pillar mining options to aid value-driven decision-making"]}]}],"canonical_facts":{"dc:contributor":["Elmo, Davide"],"dc:creator":["Archibald, Craig James"],"dc:date":["2024"],"dc:description":["Sill pillars divide vertically extensive orebodies into mining blocks to allow concurrent mining operations. Sill pillars also provide regional stability to a mining district and are usually one of the last volumes of ore to be mined. The initial design for sill pillar mining is often only high level, made without knowledge of the ground performance. The final design and planning occurs many years or decades after the initial design was made, which did not account for operational learnings. This thesis describes the decision process for positioning the overcut development within a sill pillar while considering operational and geotechnical issues. There are three possible scenarios for the placement of the overcut development: in the sill pillar, in the backfilled stope directly above the sill pillar, or a combination of the sill pillar and backfill. Numerical modelling (finite element) was used to aid in the decision-making process for the location of the overcut development. In addition, this modelling was used to understand the potential failure mechanisms and forecast the mining conditions during development and production in a sill pillar. Results from the numerical modelling have shown that mining in the adjacent blocks caused a decrease in stress in the sill pillar. Potential failure mechanisms include the deformation and unravelling of the overcut development and the failure of the longhole stope walls due to this decrease in stress. To apply to an operating mine, the numerical model must be of sufficient detail to capture the mechanics of the problem yet be completed in a timeframe to support the decision-making process. Each of the operational strengths and weaknesses of the overcut development scenarios were evaluated alongside the numerical models to understand the implications of each development scenario. Using a combination of numerical modelling and operational considerations, the location of the overcut development can be decided to maintain safe access for underground personnel during the recovery of the sill pillar."],"dc:format":["7585671","application/pdf"],"dc:identifier":["http://hdl.handle.net/2429/87457","http://circle.library.ubc.ca/bitstream/2429/87457/1/ubc_2024_may_archibald_craig.pdf"],"dc:language":["eng"],"dc:publisher":["University of British Columbia"],"dc:rights":["http://creativecommons.org/licenses/by-nc-nd/4.0/","Attribution-NonCommercial-NoDerivatives 4.0 International"],"dc:title":["Application of geotechnical numerical modelling of sill pillar mining options to aid value-driven decision-making"],"dc:type":["Text"],"thesis:degree_discipline":["Mining Engineering"],"thesis:degree_level":["master's"],"thesis:degree_name":["Master of Applied Science - MASc"],"thesis:institution_name":["University of British Columbia"]},"updated_at":"2026-11-19T15:14:00Z"}