Back to results

Central Florida

Project Network Scheduling with Limited Resources Using Heuristic Solution Techniques

Abstract

dc:description.abstract

Traditional critical path methods imply the assumption of unlimited availability of resources. Mathematical models and heuristic techniques are two alternatives that consider resource limitation to sequence the activities of a project. This research explores the consideration of project scheduling under resource constraints for the specific case of single resource, single project scheduling. A computer model called GENRES-II search model is developed using a modification of Brooks' algorithm to develop project schedules. The criteria used are various weighted combinations of ACTIM, ACTRES and ACTFOL. An improvement of GENRES-II solutions is obtained when the best set of GEN-II values is input to a computer model called COMSOAL simulation model. The criteria developed generates a large number of feasible solutions rapidly. The probability of generating optimal solutions is related to the size of the generated sample. Eight network cases were considered to validate both computer models. Special attention was given to those activities that were considered critical at a specific time. The number of resources available was increased to a new higher limit in order to schedule activities that became critical. The GENRES-II model was effective in finding project durations equal to or less than ACTIM, ACTRES, GENRES or ACTFOL. The COMSOAL model was found very effective in most of the cases in improving the GEN-II solutions.

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Rojas, Enrique J. Daboin
Contributors dc:contributor
  • Whitehouse, Gary E.
  • <p><a href="https://viaf.org/viaf/92873903">Whitehouse, Gary E., 1938-</a> [VIAF]</p> <p><a href="http://id.loc.gov/authorities/names/n85146525">Whitehouse, Gary E., 1938-</a> [LC]</p><p><a href="http://viaf.org/viaf/155956728">University of Central Florida. College of Engineering</a> [VIAF]</p><p><a href="http://id.loc.gov/authorities/names/n82027354.html">University of Central Florida. College of Engineering</a> [LC]</p>

Subjects

dc:subject × 9

Rights

dc:rights
Statement dc:rights
  • Public Domain
Language dc:language
English

Identifiers

dc:identifier.*
Identifier
DP0013590

Chain of custody

source
Harvested from
Central Florida
Base URL
stars.library.ucf.edu/do/oai/
Last updated
2026-11-27
Source record
OAI-PMH GetRecord
citation

Rojas, Enrique J. Daboin. Project Network Scheduling with Limited Resources Using Heuristic Solution Techniques. https://stars.library.ucf.edu/rtd/587