{"id":{"repo_id":"umn","oai_identifier":"oai:conservancy.umn.edu:11299/170721"},"canonical_url":"https://search.ndltd.org/etd/umn/oai:conservancy.umn.edu:11299/170721","repository":{"repo_id":"umn","name":"University of Minnesota","base_url":"https://conservancy.umn.edu/server/oai/request"},"display":{"title":"Accessibility and the choice of network investments in the London underground","abstract":"In 1863, the Metropolitan Railway of what came to be known as the London Underground successfully opened as the world's first subway. Its high ridership spawned interest in additional links. Entrepreneurs secured funding and then proposed new lines to Parliament for approval, though only a portion were actually approved. While putative rail barons may have conducted some economic analysis, the final decision lay with Parliament, which did not have available modern transportation economic or geographic analysis tools. How good were the decisions that Parliament made in approving Underground Lines? This paper explores the role accessibility played on the decision to approve or reject proposed early London Tube Schemes.","abstract_html":"In 1863, the Metropolitan Railway of what came to be known as the London Underground successfully opened as the world&#x27;s first subway. Its high ridership spawned interest in additional links. Entrepreneurs secured funding and then proposed new lines to Parliament for approval, though only a portion were actually approved. While putative rail barons may have conducted some economic analysis, the final decision lay with Parliament, which did not have available modern transportation economic or geographic analysis tools. How good were the decisions that Parliament made in approving Underground Lines? This paper explores the role accessibility played on the decision to approve or reject proposed early London Tube Schemes.","abstract_has_math":false,"creators":["Giacomin, David J."],"institution":null,"degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2014,"date_issued":"2014-08","date_published":"2014-08","updated_at":"2026-11-19T08:38:00Z","subjects":["Accessibility","Choice","Investment","London","Underground","Civil engineering"],"languages":["en"],"rights":[],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.citation","label":"Dc Identifier Citation","values":["Giacomin, David J.. (2014). Accessibility and the choice of network investments in the London underground. Retrieved from the University Digital Conservancy, https://hdl.handle.net/11299/170721."],"render_values":[{"text":"Giacomin, David J.. (2014). Accessibility and the choice of network investments in the London underground. Retrieved from the University Digital Conservancy, https://hdl.handle.net/11299/170721.","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/11299/170721","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/11299/170721","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Aumn%3Aoai%3Aconservancy.umn.edu%3A11299%2F170721","prefix":"oai_dc"},"source_record":{"url":"https://conservancy.umn.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Aconservancy.umn.edu%3A11299%2F170721","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:creator","label":"Author","values":["Giacomin, David J."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2015-03-23T15:01:19Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2015-03-23T15:01:19Z"]},{"key":"dc:date.issued","label":"Date","values":["2014-08"]},{"key":"dc:type","label":"Dc Type","values":["Thesis or Dissertation"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Accessibility","Choice","Investment","London","Underground","Civil engineering"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.citation","label":"Dc Identifier Citation","values":["Giacomin, David J.. (2014). Accessibility and the choice of network investments in the London underground. Retrieved from the University Digital Conservancy, https://hdl.handle.net/11299/170721."]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/11299/170721"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["University of Minnesota M.S. thesis. August 2014. Major: Civil Engineering. Advisor: David M. Levinson. 1 computer file (PDF); v, 42 pages."]},{"key":"dc:description.abstract","label":"Abstract","values":["In 1863, the Metropolitan Railway of what came to be known as the London Underground successfully opened as the world's first subway. Its high ridership spawned interest in additional links. Entrepreneurs secured funding and then proposed new lines to Parliament for approval, though only a portion were actually approved. While putative rail barons may have conducted some economic analysis, the final decision lay with Parliament, which did not have available modern transportation economic or geographic analysis tools. How good were the decisions that Parliament made in approving Underground Lines? This paper explores the role accessibility played on the decision to approve or reject proposed early London Tube Schemes."]},{"key":"dc:title","label":"Title","values":["Accessibility and the choice of network investments in the London underground"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"dc:creator":["Giacomin, David J."],"dc:date.accessioned":["2015-03-23T15:01:19Z"],"dc:date.available":["2015-03-23T15:01:19Z"],"dc:date.issued":["2014-08"],"dc:description":["University of Minnesota M.S. thesis. August 2014. Major: Civil Engineering. Advisor: David M. Levinson. 1 computer file (PDF); v, 42 pages."],"dc:description.abstract":["In 1863, the Metropolitan Railway of what came to be known as the London Underground successfully opened as the world's first subway. Its high ridership spawned interest in additional links. Entrepreneurs secured funding and then proposed new lines to Parliament for approval, though only a portion were actually approved. While putative rail barons may have conducted some economic analysis, the final decision lay with Parliament, which did not have available modern transportation economic or geographic analysis tools. How good were the decisions that Parliament made in approving Underground Lines? This paper explores the role accessibility played on the decision to approve or reject proposed early London Tube Schemes."],"dc:identifier.citation":["Giacomin, David J.. (2014). Accessibility and the choice of network investments in the London underground. Retrieved from the University Digital Conservancy, https://hdl.handle.net/11299/170721."],"dc:identifier.uri":["http://hdl.handle.net/11299/170721"],"dc:language.iso":["en"],"dc:subject":["Accessibility","Choice","Investment","London","Underground","Civil engineering"],"dc:title":["Accessibility and the choice of network investments in the London underground"],"dc:type":["Thesis or Dissertation"],"others:access_status":["open.access"]},"updated_at":"2026-11-19T08:38:00Z"}