{"id":{"repo_id":"unr","oai_identifier":"oai:null:11714/1887"},"canonical_url":"https://search.ndltd.org/etd/unr/oai:null:11714/1887","repository":{"repo_id":"unr","name":"University of Nevada - Reno","base_url":"https://scholarwolf.unr.edu/server/oai/request"},"display":{"title":"Carson River Dam Design Proposal","abstract":"The feasibility of constructing a dam on the East Fork of the Carson River is investigated and a design proposal is presented. Site geology, seismic hazards, economic and environmental impacts, and cost are considered. Site geology is identified using the results of previous studies and data from USDA surveys in addition to field observations. Resources made available by the USGS determine the seismic hazards, including peak ground acceleration, which affect the site. In addition to providing flood control for the Carson Valley, the increased water storage will be economically beneficial to farming and the general community in Carson Valley. The maximum water storage capacity of the proposed reservoir is estimated. Based on geologic and seismic considerations, a decked rockfill dam with a concrete face is proposed. Stability calculations for the design have been computed using Rocscience Slope 7.0. Seismic loading has been simulated and a minimum factor of safety is presented. A cost estimate for the project is presented based on previously completed projects of a similar scale.","abstract_html":"The feasibility of constructing a dam on the East Fork of the Carson River is investigated and a design proposal is presented. Site geology, seismic hazards, economic and environmental impacts, and cost are considered. Site geology is identified using the results of previous studies and data from USDA surveys in addition to field observations. Resources made available by the USGS determine the seismic hazards, including peak ground acceleration, which affect the site. In addition to providing flood control for the Carson Valley, the increased water storage will be economically beneficial to farming and the general community in Carson Valley. The maximum water storage capacity of the proposed reservoir is estimated. Based on geologic and seismic considerations, a decked rockfill dam with a concrete face is proposed. Stability calculations for the design have been computed using Rocscience Slope 7.0. Seismic loading has been simulated and a minimum factor of safety is presented. A cost estimate for the project is presented based on previously completed projects of a similar scale.","abstract_has_math":false,"creators":["Lorincz, Lilian"],"institution":"University of Nevada, Reno","degree_name":"Geological Engineering","degree_level":"Honors Thesis","degree_discipline":null,"degree_department":"Geological Sciences and Engineering","school":null,"contributors":[],"advisors":["Watters, Robert"],"committee_chairs":[],"committee_members":[],"year":2017,"date_issued":"2017","date_published":"2017","updated_at":"2026-11-19T09:54:50Z","subjects":[],"languages":["en_US","English"],"rights":["Creative Commons Attribution 4.0 United States","Author(s)"],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/11714/1887","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"http://hdl.handle.net/11714/1887","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://scholarwolf.unr.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Anull%3A11714%2F1887","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Watters, Robert"]},{"key":"dc:creator","label":"Author","values":["Lorincz, Lilian"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2017-08-31T21:17:39Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2017-08-31T21:17:39Z"]},{"key":"dc:date.issued","label":"Date","values":["2017"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_department","label":"Department","values":["Geological Sciences and Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Honors Thesis"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Geological Engineering"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Nevada, Reno"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["English"]},{"key":"dc:language.iso","label":"Language (ISO)","values":["en_US"]},{"key":"dc:rights","label":"Dc Rights","values":["Creative Commons Attribution 4.0 United States"]},{"key":"dc:rights.holder","label":"Dc Rights Holder","values":["Author(s)"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/11714/1887"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["The University of Nevada, Reno Libraries will promptly respond to removal requests related to content that violates intellectual property laws, data protections, or has been uploaded without creator consent. Takedown notices should be directed to our ScholarWolf team (scholarwolf@library.unr.edu) with information about the object, including its full URL and the nature of your complaint."]},{"key":"dc:description.abstract","label":"Abstract","values":["The feasibility of constructing a dam on the East Fork of the Carson River is investigated and a design proposal is presented. Site geology, seismic hazards, economic and environmental impacts, and cost are considered. Site geology is identified using the results of previous studies and data from USDA surveys in addition to field observations. Resources made available by the USGS determine the seismic hazards, including peak ground acceleration, which affect the site. In addition to providing flood control for the Carson Valley, the increased water storage will be economically beneficial to farming and the general community in Carson Valley. The maximum water storage capacity of the proposed reservoir is estimated. Based on geologic and seismic considerations, a decked rockfill dam with a concrete face is proposed. Stability calculations for the design have been computed using Rocscience Slope 7.0. Seismic loading has been simulated and a minimum factor of safety is presented. A cost estimate for the project is presented based on previously completed projects of a similar scale."]},{"key":"dc:format","label":"Dc Format","values":["PDF"]},{"key":"dc:title","label":"Title","values":["Carson River Dam Design Proposal"]}]}],"canonical_facts":{"dc:contributor.advisor":["Watters, Robert"],"dc:creator":["Lorincz, Lilian"],"dc:date.accessioned":["2017-08-31T21:17:39Z"],"dc:date.available":["2017-08-31T21:17:39Z"],"dc:date.issued":["2017"],"dc:description":["The University of Nevada, Reno Libraries will promptly respond to removal requests related to content that violates intellectual property laws, data protections, or has been uploaded without creator consent. Takedown notices should be directed to our ScholarWolf team (scholarwolf@library.unr.edu) with information about the object, including its full URL and the nature of your complaint."],"dc:description.abstract":["The feasibility of constructing a dam on the East Fork of the Carson River is investigated and a design proposal is presented. Site geology, seismic hazards, economic and environmental impacts, and cost are considered. Site geology is identified using the results of previous studies and data from USDA surveys in addition to field observations. Resources made available by the USGS determine the seismic hazards, including peak ground acceleration, which affect the site. In addition to providing flood control for the Carson Valley, the increased water storage will be economically beneficial to farming and the general community in Carson Valley. The maximum water storage capacity of the proposed reservoir is estimated. Based on geologic and seismic considerations, a decked rockfill dam with a concrete face is proposed. Stability calculations for the design have been computed using Rocscience Slope 7.0. Seismic loading has been simulated and a minimum factor of safety is presented. A cost estimate for the project is presented based on previously completed projects of a similar scale."],"dc:format":["PDF"],"dc:identifier.uri":["http://hdl.handle.net/11714/1887"],"dc:language":["English"],"dc:language.iso":["en_US"],"dc:rights":["Creative Commons Attribution 4.0 United States"],"dc:rights.holder":["Author(s)"],"dc:title":["Carson River Dam Design Proposal"],"dc:type":["Thesis"],"thesis:degree_department":["Geological Sciences and Engineering"],"thesis:degree_level":["Honors Thesis"],"thesis:degree_name":["Geological Engineering"],"thesis:institution_name":["University of Nevada, Reno"]},"updated_at":"2026-11-19T09:54:50Z"}