{"id":{"repo_id":"unt","oai_identifier":"info:ark/67531/metadc1609144"},"canonical_url":"https://search.ndltd.org/etd/unt/info:ark/67531/metadc1609144","repository":{"repo_id":"unt","name":"University of North Texas","base_url":"https://digital.library.unt.edu/oai/"},"display":{"title":"Construction Management Methods and Techniques in Army Tactical Shelter","abstract":"This thesis presents a research effort aimed at developing using construction methods and techniques in army tactical shelter. The beginning step focuses on developing and identifying different activities and work breakdown structure applicable in shelter prototype. The next step focuses on identifying resource allocation. This include allocate resources based on the delivered project as per alternative one and for the second alternative as optimization, resource allocation modified and tried to level and minimize resource peak. In addition, the cost calculated for the whole project as well as for each WBS and activities which consider as alternative one and in the second alternative, cost mitigation applied according to available resources and adjusting predecessors and successors of each activity. In conclusion, two alternatives compared, available outcome presents, and future work suggested for the project team to continue this effort.","abstract_html":"This thesis presents a research effort aimed at developing using construction methods and techniques in army tactical shelter. The beginning step focuses on developing and identifying different activities and work breakdown structure applicable in shelter prototype. The next step focuses on identifying resource allocation. This include allocate resources based on the delivered project as per alternative one and for the second alternative as optimization, resource allocation modified and tried to level and minimize resource peak. In addition, the cost calculated for the whole project as well as for each WBS and activities which consider as alternative one and in the second alternative, cost mitigation applied according to available resources and adjusting predecessors and successors of each activity. In conclusion, two alternatives compared, available outcome presents, and future work suggested for the project team to continue this effort.","abstract_has_math":false,"creators":["Yeganehtalab, Babak"],"institution":"University of North Texas","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":["Yu, Cheng","Nasrazadani, Seifollah","Rashydian, Saman"],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2019,"date_issued":"2019-12","date_published":"2019-12","updated_at":"2026-11-19T08:54:49Z","subjects":["Army tactical shelter","Scheduling","Work break down structure","WBS","Resource allocation","Logic Sequence"],"languages":["English"],"rights":["Public","Yeganehtalab, Babak","Copyright","Copyright is held by the author, unless otherwise noted. All rights Reserved."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier","label":"Identifier","values":["local-cont-no: submission_1823","https://digital.library.unt.edu/ark:/67531/metadc1609144/","ark: ark:/67531/metadc1609144"],"render_values":[{"text":"local-cont-no: submission_1823","href":null,"code":true},{"text":"https://digital.library.unt.edu/ark:/67531/metadc1609144/","href":"https://digital.library.unt.edu/ark:/67531/metadc1609144/","code":true},{"text":"ark: ark:/67531/metadc1609144","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://doi.org/10.12794/metadc1609144","outbound_label":"DOI","outbound_source":"dc:identifier","record_url":"https://doi.org/10.12794/metadc1609144","record_label":"Repository record","record_kind":"doi","record_source":"dc:identifier","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Aunt%3Ainfo%3Aark%2F67531%2Fmetadc1609144","prefix":"oai_dc"},"source_record":{"url":"https://digital.library.unt.edu/oai/?verb=GetRecord&metadataPrefix=oai_dc&identifier=info%3Aark%2F67531%2Fmetadc1609144","prefix":"oai_dc"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["Yu, Cheng","Nasrazadani, Seifollah","Rashydian, Saman"]},{"key":"dc:creator","label":"Author","values":["Yeganehtalab, Babak"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2019-12"]},{"key":"dc:publisher","label":"Institution","values":["University of North Texas"]},{"key":"dc:type","label":"Dc Type","values":["Thesis or Dissertation"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Army tactical shelter","Scheduling","Work break down structure","WBS","Resource allocation","Logic Sequence"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["English"]},{"key":"dc:rights","label":"Dc Rights","values":["Public","Yeganehtalab, Babak","Copyright","Copyright is held by the author, unless otherwise noted. All rights Reserved."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["local-cont-no: submission_1823","doi: 10.12794/metadc1609144","https://digital.library.unt.edu/ark:/67531/metadc1609144/","ark: ark:/67531/metadc1609144"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["This thesis presents a research effort aimed at developing using construction methods and techniques in army tactical shelter. The beginning step focuses on developing and identifying different activities and work breakdown structure applicable in shelter prototype. The next step focuses on identifying resource allocation. This include allocate resources based on the delivered project as per alternative one and for the second alternative as optimization, resource allocation modified and tried to level and minimize resource peak. In addition, the cost calculated for the whole project as well as for each WBS and activities which consider as alternative one and in the second alternative, cost mitigation applied according to available resources and adjusting predecessors and successors of each activity. In conclusion, two alternatives compared, available outcome presents, and future work suggested for the project team to continue this effort."]},{"key":"dc:format","label":"Dc Format","values":["viii, 84 pages","Text"]},{"key":"dc:title","label":"Title","values":["Construction Management Methods and Techniques in Army Tactical Shelter"]}]}],"canonical_facts":{"dc:contributor":["Yu, Cheng","Nasrazadani, Seifollah","Rashydian, Saman"],"dc:creator":["Yeganehtalab, Babak"],"dc:date":["2019-12"],"dc:description":["This thesis presents a research effort aimed at developing using construction methods and techniques in army tactical shelter. The beginning step focuses on developing and identifying different activities and work breakdown structure applicable in shelter prototype. The next step focuses on identifying resource allocation. This include allocate resources based on the delivered project as per alternative one and for the second alternative as optimization, resource allocation modified and tried to level and minimize resource peak. In addition, the cost calculated for the whole project as well as for each WBS and activities which consider as alternative one and in the second alternative, cost mitigation applied according to available resources and adjusting predecessors and successors of each activity. In conclusion, two alternatives compared, available outcome presents, and future work suggested for the project team to continue this effort."],"dc:format":["viii, 84 pages","Text"],"dc:identifier":["local-cont-no: submission_1823","doi: 10.12794/metadc1609144","https://digital.library.unt.edu/ark:/67531/metadc1609144/","ark: ark:/67531/metadc1609144"],"dc:language":["English"],"dc:publisher":["University of North Texas"],"dc:rights":["Public","Yeganehtalab, Babak","Copyright","Copyright is held by the author, unless otherwise noted. All rights Reserved."],"dc:subject":["Army tactical shelter","Scheduling","Work break down structure","WBS","Resource allocation","Logic Sequence"],"dc:title":["Construction Management Methods and Techniques in Army Tactical Shelter"],"dc:type":["Thesis or Dissertation"]},"updated_at":"2026-11-19T08:54:49Z"}