{"id":{"repo_id":"unt","oai_identifier":"info:ark/67531/metadc277777"},"canonical_url":"https://search.ndltd.org/etd/unt/info:ark/67531/metadc277777","repository":{"repo_id":"unt","name":"University of North Texas","base_url":"https://digital.library.unt.edu/oai/"},"display":{"title":"The Impact of the Cost Schedule Control Systems Criteria on Electronics and Aerospace Contractors","abstract":"The primary purpose of this study was to analyze the capability and inclination of the aerospace and electronics industry contractors to abide by the general provisions of the Cost/Schedule Control Systems Criteria (C/SCSC).","abstract_html":"The primary purpose of this study was to analyze the capability and inclination of the aerospace and electronics industry contractors to abide by the general provisions of the Cost/Schedule Control Systems Criteria (C/SCSC).","abstract_has_math":false,"creators":["Richardson, Gary Lowell"],"institution":"North Texas State University","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":["Hays, Henry","Maher, Laurence P.","Griffith, Reynolds","Melton, R. B. (Rosser B.)"],"advisors":[],"committee_chairs":[],"committee_members":[],"year":1970,"date_issued":"1970-08","date_published":"1970-08","updated_at":"2026-11-19T08:49:59Z","subjects":["Cost/Schedule Control Systems Criteria","electronics contractors","aerospace contractors","Aerospace industries -- Cost control.","Electronic industries -- Cost control."],"languages":["English"],"rights":["Public","Copyright","Copyright is held by the author, unless otherwise noted. All rights reserved.","Richardson, Gary Lowell"],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier","label":"Identifier","values":["call-no: 379 N81d no.429","local-cont-no: nd_00429","untcat: b1569193","ark: ark:/67531/metadc277777"],"render_values":[{"text":"call-no: 379 N81d no.429","href":null,"code":true},{"text":"local-cont-no: nd_00429","href":null,"code":true},{"text":"untcat: b1569193","href":null,"code":true},{"text":"ark: ark:/67531/metadc277777","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://digital.library.unt.edu/ark:/67531/metadc277777/","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"https://digital.library.unt.edu/ark:/67531/metadc277777/","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://digital.library.unt.edu/oai/?verb=GetRecord&metadataPrefix=oai_dc&identifier=info%3Aark%2F67531%2Fmetadc277777","prefix":"oai_dc"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["Hays, Henry","Maher, Laurence P.","Griffith, Reynolds","Melton, R. B. (Rosser B.)"]},{"key":"dc:creator","label":"Author","values":["Richardson, Gary Lowell"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["1970-08"]},{"key":"dc:publisher","label":"Institution","values":["North Texas State University"]},{"key":"dc:type","label":"Dc Type","values":["Thesis or Dissertation"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Cost/Schedule Control Systems Criteria","electronics contractors","aerospace contractors","Aerospace industries -- Cost control.","Electronic industries -- Cost control."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["English"]},{"key":"dc:rights","label":"Dc Rights","values":["Public","Copyright","Copyright is held by the author, unless otherwise noted. All rights reserved.","Richardson, Gary Lowell"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["call-no: 379 N81d no.429","local-cont-no: nd_00429","untcat: b1569193","https://digital.library.unt.edu/ark:/67531/metadc277777/","ark: ark:/67531/metadc277777"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["The primary purpose of this study was to analyze the capability and inclination of the aerospace and electronics industry contractors to abide by the general provisions of the Cost/Schedule Control Systems Criteria (C/SCSC)."]},{"key":"dc:format","label":"Dc Format","values":["xi, 357 leaves : ill.","Text"]},{"key":"dc:title","label":"Title","values":["The Impact of the Cost Schedule Control Systems Criteria on Electronics and Aerospace Contractors"]}]}],"canonical_facts":{"dc:contributor":["Hays, Henry","Maher, Laurence P.","Griffith, Reynolds","Melton, R. B. (Rosser B.)"],"dc:creator":["Richardson, Gary Lowell"],"dc:date":["1970-08"],"dc:description":["The primary purpose of this study was to analyze the capability and inclination of the aerospace and electronics industry contractors to abide by the general provisions of the Cost/Schedule Control Systems Criteria (C/SCSC)."],"dc:format":["xi, 357 leaves : ill.","Text"],"dc:identifier":["call-no: 379 N81d no.429","local-cont-no: nd_00429","untcat: b1569193","https://digital.library.unt.edu/ark:/67531/metadc277777/","ark: ark:/67531/metadc277777"],"dc:language":["English"],"dc:publisher":["North Texas State University"],"dc:rights":["Public","Copyright","Copyright is held by the author, unless otherwise noted. All rights reserved.","Richardson, Gary Lowell"],"dc:subject":["Cost/Schedule Control Systems Criteria","electronics contractors","aerospace contractors","Aerospace industries -- Cost control.","Electronic industries -- Cost control."],"dc:title":["The Impact of the Cost Schedule Control Systems Criteria on Electronics and Aerospace Contractors"],"dc:type":["Thesis or Dissertation"]},"updated_at":"2026-11-19T08:49:59Z"}