{"id":{"repo_id":"unt","oai_identifier":"info:ark/67531/metadc331251"},"canonical_url":"https://search.ndltd.org/etd/unt/info:ark/67531/metadc331251","repository":{"repo_id":"unt","name":"University of North Texas","base_url":"https://digital.library.unt.edu/oai/"},"display":{"title":"A Study of the Factors Related to Planned and Actual Manufacturing Lead Time in Two Environments: (1) High-Volume Continuous-Production and (2) Job-Shop Production-to-Order","abstract":"This study focused upon the manufacturing lead time management in California's electrical and electronic machinery, equipment, and supplies industry. Manufacturing firms with one hundred or more employees were invited to participate in the research. Six subproblems relating to manufacturing lead time were selected and six appropriate null hypotheses were tested. The subproblems identified (1) factors influencing manufacturing lead time, (2) production planning processes influencing manufacturing lead time accuracy, and (3) techniques reducing manufacturing lead time. These factors, production planning processes, and techniques were then IV investigated to determine the importance of each of them in two environments: (1) high-volume continuous-production (HVCP) and (2) job-shop production-to-order (JSPTO).","abstract_html":"This study focused upon the manufacturing lead time management in California&#x27;s electrical and electronic machinery, equipment, and supplies industry. Manufacturing firms with one hundred or more employees were invited to participate in the research. Six subproblems relating to manufacturing lead time were selected and six appropriate null hypotheses were tested. The subproblems identified (1) factors influencing manufacturing lead time, (2) production planning processes influencing manufacturing lead time accuracy, and (3) techniques reducing manufacturing lead time. These factors, production planning processes, and techniques were then IV investigated to determine the importance of each of them in two environments: (1) high-volume continuous-production (HVCP) and (2) job-shop production-to-order (JSPTO).","abstract_has_math":false,"creators":["Moshtaghi Moghaddam, Jahanguir"],"institution":"North Texas State University","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":["Bimmerle, Charles F.","Hays, Henry","Spalding, John Barney","Garnett, Hugh B.","Dunn, J. D., 1928-"],"advisors":[],"committee_chairs":[],"committee_members":[],"year":1980,"date_issued":"1980-12","date_published":"1980-12","updated_at":"2026-11-19T08:53:10Z","subjects":["manufacturing lead time","production planning processes","high-volume continuous production","job-shop production-to-order","Production planning.","Electric machinery industry -- California.","Electronics industries -- California."],"languages":["English"],"rights":["Public","Moshtaghi Moghaddam, Jahanguir","Copyright","Copyright is held by the author, unless otherwise noted. All rights reserved."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier","label":"Identifier","values":["local-cont-no: 1002782915-Moghaddam","call-no: 379 N81 no. 1660","untcat: b1218608","oclc: 7926421","ark: ark:/67531/metadc331251"],"render_values":[{"text":"local-cont-no: 1002782915-Moghaddam","href":null,"code":true},{"text":"call-no: 379 N81 no. 1660","href":null,"code":true},{"text":"untcat: b1218608","href":null,"code":true},{"text":"oclc: 7926421","href":null,"code":true},{"text":"ark: ark:/67531/metadc331251","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://digital.library.unt.edu/ark:/67531/metadc331251/","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"https://digital.library.unt.edu/ark:/67531/metadc331251/","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://digital.library.unt.edu/oai/?verb=GetRecord&metadataPrefix=oai_dc&identifier=info%3Aark%2F67531%2Fmetadc331251","prefix":"oai_dc"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["Bimmerle, Charles F.","Hays, Henry","Spalding, John Barney","Garnett, Hugh B.","Dunn, J. D., 1928-"]},{"key":"dc:creator","label":"Author","values":["Moshtaghi Moghaddam, Jahanguir"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:coverage","label":"Dc Coverage","values":["United States - California"]},{"key":"dc:date","label":"Dc Date","values":["1980-12"]},{"key":"dc:publisher","label":"Institution","values":["North Texas State University"]},{"key":"dc:type","label":"Dc Type","values":["Thesis or Dissertation"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["manufacturing lead time","production planning processes","high-volume continuous production","job-shop production-to-order","Production planning.","Electric machinery industry -- California.","Electronics industries -- California."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["English"]},{"key":"dc:rights","label":"Dc Rights","values":["Public","Moshtaghi Moghaddam, Jahanguir","Copyright","Copyright is held by the author, unless otherwise noted. All rights reserved."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["local-cont-no: 1002782915-Moghaddam","call-no: 379 N81 no. 1660","untcat: b1218608","oclc: 7926421","https://digital.library.unt.edu/ark:/67531/metadc331251/","ark: ark:/67531/metadc331251"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["This study focused upon the manufacturing lead time management in California's electrical and electronic machinery, equipment, and supplies industry. Manufacturing firms with one hundred or more employees were invited to participate in the research. Six subproblems relating to manufacturing lead time were selected and six appropriate null hypotheses were tested. The subproblems identified (1) factors influencing manufacturing lead time, (2) production planning processes influencing manufacturing lead time accuracy, and (3) techniques reducing manufacturing lead time. These factors, production planning processes, and techniques were then IV investigated to determine the importance of each of them in two environments: (1) high-volume continuous-production (HVCP) and (2) job-shop production-to-order (JSPTO)."]},{"key":"dc:format","label":"Dc Format","values":["xiii, 228 leaves : ill.","Text"]},{"key":"dc:title","label":"Title","values":["A Study of the Factors Related to Planned and Actual Manufacturing Lead Time in Two Environments: (1) High-Volume Continuous-Production and (2) Job-Shop Production-to-Order"]}]}],"canonical_facts":{"dc:contributor":["Bimmerle, Charles F.","Hays, Henry","Spalding, John Barney","Garnett, Hugh B.","Dunn, J. D., 1928-"],"dc:coverage":["United States - California"],"dc:creator":["Moshtaghi Moghaddam, Jahanguir"],"dc:date":["1980-12"],"dc:description":["This study focused upon the manufacturing lead time management in California's electrical and electronic machinery, equipment, and supplies industry. Manufacturing firms with one hundred or more employees were invited to participate in the research. Six subproblems relating to manufacturing lead time were selected and six appropriate null hypotheses were tested. The subproblems identified (1) factors influencing manufacturing lead time, (2) production planning processes influencing manufacturing lead time accuracy, and (3) techniques reducing manufacturing lead time. These factors, production planning processes, and techniques were then IV investigated to determine the importance of each of them in two environments: (1) high-volume continuous-production (HVCP) and (2) job-shop production-to-order (JSPTO)."],"dc:format":["xiii, 228 leaves : ill.","Text"],"dc:identifier":["local-cont-no: 1002782915-Moghaddam","call-no: 379 N81 no. 1660","untcat: b1218608","oclc: 7926421","https://digital.library.unt.edu/ark:/67531/metadc331251/","ark: ark:/67531/metadc331251"],"dc:language":["English"],"dc:publisher":["North Texas State University"],"dc:rights":["Public","Moshtaghi Moghaddam, Jahanguir","Copyright","Copyright is held by the author, unless otherwise noted. All rights reserved."],"dc:subject":["manufacturing lead time","production planning processes","high-volume continuous production","job-shop production-to-order","Production planning.","Electric machinery industry -- California.","Electronics industries -- California."],"dc:title":["A Study of the Factors Related to Planned and Actual Manufacturing Lead Time in Two Environments: (1) High-Volume Continuous-Production and (2) Job-Shop Production-to-Order"],"dc:type":["Thesis or Dissertation"]},"updated_at":"2026-11-19T08:53:10Z"}