{"id":{"repo_id":"usf","oai_identifier":"oai:digitalcommons.usf.edu:etd-2011"},"canonical_url":"https://search.ndltd.org/etd/usf/oai:digitalcommons.usf.edu:etd-2011","repository":{"repo_id":"usf","name":"University of South Florida","base_url":"https://digitalcommons.usf.edu/do/oai/"},"display":{"title":"Replacement Prioritization of Precast Deck Panel Bridges in Florida","abstract":"During the mid 70's and early 80's, several precast deck panel bridges were constructed in Florida. These utilize prestressed precast panels as stay-in-place forms and are designed to act compositely with a cast-in-place deck which is poured subsequently. Such bridges offer advantages of quicker construction and lower costs. However, several such bridges built in Florida developed extensive cracking and spalling. Following localized failures, the Florida Department of Transportation have decided to replace all 127 precast panel deck bridges in Districts 1 and 7. Since deck replacement is contingent on funding, it is necessary to develop a rational procedure to decide the order in which they are replaced. This work describes the calibration of a software program developed to assist in the replacement prioritization of panel bridges. Prioritization is based on information available with FDOT in the form of biannual inspection reports over the past 20+ years. A new computer language called BRAILE ( BRidge Annual Inspection LanguagE) was developed to input the data from the inspection reports. A compute program PANEL was used to process the BRAILE data to identify trends that could be used to assign weights to observed deficiencies. The prioritization developed based on the method presented here was found to correctly identify high risk bridges and was reliable than one based solely on National Bridge Inventory (NBI) condition rating.","abstract_html":"During the mid 70&#x27;s and early 80&#x27;s, several precast deck panel bridges were constructed in Florida. These utilize prestressed precast panels as stay-in-place forms and are designed to act compositely with a cast-in-place deck which is poured subsequently. Such bridges offer advantages of quicker construction and lower costs. However, several such bridges built in Florida developed extensive cracking and spalling. Following localized failures, the Florida Department of Transportation have decided to replace all 127 precast panel deck bridges in Districts 1 and 7. Since deck replacement is contingent on funding, it is necessary to develop a rational procedure to decide the order in which they are replaced. This work describes the calibration of a software program developed to assist in the replacement prioritization of panel bridges. Prioritization is based on information available with FDOT in the form of biannual inspection reports over the past 20+ years. A new computer language called BRAILE ( BRidge Annual Inspection LanguagE) was developed to input the data from the inspection reports. A compute program PANEL was used to process the BRAILE data to identify trends that could be used to assign weights to observed deficiencies. The prioritization developed based on the method presented here was found to correctly identify high risk bridges and was reliable than one based solely on National Bridge Inventory (NBI) condition rating.","abstract_has_math":false,"creators":["Deshmukh, Ganesh"],"institution":"University of South Florida","degree_name":null,"degree_level":"Thesis","degree_discipline":"Civil Engineering","degree_department":null,"school":null,"contributors":["Rajan Sen, Ph.D.","Ashraf Ayoub, Ph.D.","Gray Mullins, Ph.D."],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2004,"date_issued":"2004-04-02T08:00:00Z","date_published":"2004-04-02T08:00:00Z","updated_at":"2026-11-19T08:39:20Z","subjects":["prestress","deficiencies","inspection","rating","trends","American Studies","Arts and Humanities"],"languages":["EN-US"],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://digitalcommons.usf.edu/etd/1012","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"https://digitalcommons.usf.edu/etd/1012","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://digitalcommons.usf.edu/do/oai/?verb=GetRecord&metadataPrefix=oai_etdms&identifier=oai%3Adigitalcommons.usf.edu%3Aetd-2011","prefix":"oai_etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["Rajan Sen, Ph.D.","Ashraf Ayoub, Ph.D.","Gray Mullins, Ph.D."]},{"key":"dc:creator","label":"Author","values":["Deshmukh, Ganesh"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2004-04-02T08:00:00Z"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Civil Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Thesis","M.S.C.E."]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of South Florida"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["prestress","deficiencies","inspection","rating","trends","American Studies","Arts and Humanities"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["EN-US"]},{"key":"dc:rights.license","label":"Dc Rights License","values":["default"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["https://digitalcommons.usf.edu/etd/1012"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["During the mid 70's and early 80's, several precast deck panel bridges were constructed in Florida. These utilize prestressed precast panels as stay-in-place forms and are designed to act compositely with a cast-in-place deck which is poured subsequently. Such bridges offer advantages of quicker construction and lower costs. However, several such bridges built in Florida developed extensive cracking and spalling. Following localized failures, the Florida Department of Transportation have decided to replace all 127 precast panel deck bridges in Districts 1 and 7. Since deck replacement is contingent on funding, it is necessary to develop a rational procedure to decide the order in which they are replaced. This work describes the calibration of a software program developed to assist in the replacement prioritization of panel bridges. Prioritization is based on information available with FDOT in the form of biannual inspection reports over the past 20+ years. A new computer language called BRAILE ( BRidge Annual Inspection LanguagE) was developed to input the data from the inspection reports. A compute program PANEL was used to process the BRAILE data to identify trends that could be used to assign weights to observed deficiencies. The prioritization developed based on the method presented here was found to correctly identify high risk bridges and was reliable than one based solely on National Bridge Inventory (NBI) condition rating."]},{"key":"dc:title","label":"Title","values":["Replacement Prioritization of Precast Deck Panel Bridges in Florida"]}]}],"canonical_facts":{"dc:contributor":["Rajan Sen, Ph.D.","Ashraf Ayoub, Ph.D.","Gray Mullins, Ph.D."],"dc:creator":["Deshmukh, Ganesh"],"dc:date":["2004-04-02T08:00:00Z"],"dc:description":["During the mid 70's and early 80's, several precast deck panel bridges were constructed in Florida. These utilize prestressed precast panels as stay-in-place forms and are designed to act compositely with a cast-in-place deck which is poured subsequently. Such bridges offer advantages of quicker construction and lower costs. However, several such bridges built in Florida developed extensive cracking and spalling. Following localized failures, the Florida Department of Transportation have decided to replace all 127 precast panel deck bridges in Districts 1 and 7. Since deck replacement is contingent on funding, it is necessary to develop a rational procedure to decide the order in which they are replaced. This work describes the calibration of a software program developed to assist in the replacement prioritization of panel bridges. Prioritization is based on information available with FDOT in the form of biannual inspection reports over the past 20+ years. A new computer language called BRAILE ( BRidge Annual Inspection LanguagE) was developed to input the data from the inspection reports. A compute program PANEL was used to process the BRAILE data to identify trends that could be used to assign weights to observed deficiencies. The prioritization developed based on the method presented here was found to correctly identify high risk bridges and was reliable than one based solely on National Bridge Inventory (NBI) condition rating."],"dc:identifier":["https://digitalcommons.usf.edu/etd/1012"],"dc:language":["EN-US"],"dc:rights.license":["default"],"dc:subject":["prestress","deficiencies","inspection","rating","trends","American Studies","Arts and Humanities"],"dc:title":["Replacement Prioritization of Precast Deck Panel Bridges in Florida"],"thesis:degree_discipline":["Civil Engineering"],"thesis:degree_level":["Thesis","M.S.C.E."],"thesis:institution_name":["University of South Florida"]},"updated_at":"2026-11-19T08:39:20Z"}