{"id":{"repo_id":"usf","oai_identifier":"oai:digitalcommons.usf.edu:etd-4743"},"canonical_url":"https://search.ndltd.org/etd/usf/oai:digitalcommons.usf.edu:etd-4743","repository":{"repo_id":"usf","name":"University of South Florida","base_url":"https://digitalcommons.usf.edu/do/oai/"},"display":{"title":"Rehabilitation of Precast Deck Panel Bridges","abstract":"USF completed a research study in 2005, which prioritized the replacement of 85 deteriorating composite precast deck panel bridges. This thesis re-evaluates the original recommendations in the wake of failures of two of these bridges in 2007. Since funding will not allow all identified bridges to be replaced, it was necessary to determine the most effective repair methods. To assess USF’s recommendations, a forensic study was undertaken in which the most current inspection and work program documents on the two failed bridges were reviewed and FDOT personnel interviewed. The best repair procedures were determined by reviewing repair plans, specifications, reports and site visits. The study found the two bridges that failed had been correctly prioritized by USF (No. 1 of 18 and No. 8 of 15). A new, accelerated repair method encompassing complete bay replacement was developed in a pilot project funded by the Florida Department of Transportation.","abstract_html":"USF completed a research study in 2005, which prioritized the replacement of 85 deteriorating composite precast deck panel bridges. This thesis re-evaluates the original recommendations in the wake of failures of two of these bridges in 2007. Since funding will not allow all identified bridges to be replaced, it was necessary to determine the most effective repair methods. To assess USF’s recommendations, a forensic study was undertaken in which the most current inspection and work program documents on the two failed bridges were reviewed and FDOT personnel interviewed. The best repair procedures were determined by reviewing repair plans, specifications, reports and site visits. The study found the two bridges that failed had been correctly prioritized by USF (No. 1 of 18 and No. 8 of 15). A new, accelerated repair method encompassing complete bay replacement was developed in a pilot project funded by the Florida Department of Transportation.","abstract_has_math":false,"creators":["Alvi, Atiq H."],"institution":"University of South Florida","degree_name":null,"degree_level":"Thesis","degree_discipline":"Civil and Environmental Engineering","degree_department":null,"school":null,"contributors":["Rajan Sen, Ph.D.","William Carpenter, Ph.D.","Gray Mullins, Ph.D."],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2010,"date_issued":"2010-10-26T07:00:00Z","date_published":"2010-10-26T07:00:00Z","updated_at":"2026-11-19T08:37:52Z","subjects":["Deterioration","Sudden Failures","Forensic Analysis","Permanent Repairs","Full Depth Precast Panels","American Studies","Arts and Humanities"],"languages":["EN-US"],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://digitalcommons.usf.edu/etd/3581","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"https://digitalcommons.usf.edu/etd/3581","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://digitalcommons.usf.edu/do/oai/?verb=GetRecord&metadataPrefix=oai_etdms&identifier=oai%3Adigitalcommons.usf.edu%3Aetd-4743","prefix":"oai_etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["Rajan Sen, Ph.D.","William Carpenter, Ph.D.","Gray Mullins, Ph.D."]},{"key":"dc:creator","label":"Author","values":["Alvi, Atiq H."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2010-10-26T07:00:00Z"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Civil and Environmental Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Thesis","M.S.C.E."]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of South Florida"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Deterioration","Sudden Failures","Forensic Analysis","Permanent Repairs","Full Depth Precast Panels","American Studies","Arts and Humanities"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["EN-US"]},{"key":"dc:rights.license","label":"Dc Rights License","values":["default"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["https://digitalcommons.usf.edu/etd/3581"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["USF completed a research study in 2005, which prioritized the replacement of 85 deteriorating composite precast deck panel bridges. This thesis re-evaluates the original recommendations in the wake of failures of two of these bridges in 2007. Since funding will not allow all identified bridges to be replaced, it was necessary to determine the most effective repair methods. To assess USF’s recommendations, a forensic study was undertaken in which the most current inspection and work program documents on the two failed bridges were reviewed and FDOT personnel interviewed. The best repair procedures were determined by reviewing repair plans, specifications, reports and site visits. The study found the two bridges that failed had been correctly prioritized by USF (No. 1 of 18 and No. 8 of 15). A new, accelerated repair method encompassing complete bay replacement was developed in a pilot project funded by the Florida Department of Transportation."]},{"key":"dc:title","label":"Title","values":["Rehabilitation of Precast Deck Panel Bridges"]}]}],"canonical_facts":{"dc:contributor":["Rajan Sen, Ph.D.","William Carpenter, Ph.D.","Gray Mullins, Ph.D."],"dc:creator":["Alvi, Atiq H."],"dc:date":["2010-10-26T07:00:00Z"],"dc:description":["USF completed a research study in 2005, which prioritized the replacement of 85 deteriorating composite precast deck panel bridges. This thesis re-evaluates the original recommendations in the wake of failures of two of these bridges in 2007. Since funding will not allow all identified bridges to be replaced, it was necessary to determine the most effective repair methods. To assess USF’s recommendations, a forensic study was undertaken in which the most current inspection and work program documents on the two failed bridges were reviewed and FDOT personnel interviewed. The best repair procedures were determined by reviewing repair plans, specifications, reports and site visits. The study found the two bridges that failed had been correctly prioritized by USF (No. 1 of 18 and No. 8 of 15). A new, accelerated repair method encompassing complete bay replacement was developed in a pilot project funded by the Florida Department of Transportation."],"dc:identifier":["https://digitalcommons.usf.edu/etd/3581"],"dc:language":["EN-US"],"dc:rights.license":["default"],"dc:subject":["Deterioration","Sudden Failures","Forensic Analysis","Permanent Repairs","Full Depth Precast Panels","American Studies","Arts and Humanities"],"dc:title":["Rehabilitation of Precast Deck Panel Bridges"],"thesis:degree_discipline":["Civil and Environmental Engineering"],"thesis:degree_level":["Thesis","M.S.C.E."],"thesis:institution_name":["University of South Florida"]},"updated_at":"2026-11-19T08:37:52Z"}