{"id":{"repo_id":"usfca","oai_identifier":"oai:repository.usfca.edu:capstone-3265"},"canonical_url":"https://search.ndltd.org/etd/usfca/oai:repository.usfca.edu:capstone-3265","repository":{"repo_id":"usfca","name":"University of San Francisco","base_url":"https://repository.usfca.edu/do/oai/"},"display":{"title":"Bridging the Gap in Early Mobilization: Implementing the BMAT 2.0 to Enhance Patient Care and Outcomes","abstract":"Objective: Early mobilization of patients is correlated to enhanced functional recovery (Zhang et al., 2019), decreased hospital stays (Zhang et al., 2019), and a reduction in healthcare costs (Liu et al., 2019). Unfortunately, inconsistency in hospital staff training and an absence of mobility assessment standardization have served as barriers to successful implementation. Aim: This quality improvement project aims to increase the percentage of RNs and CNAs who effectively use the BMAT 2.0 to promote early mobilization of medical-surgical endocrine and stroke patients by 20%, from 31.4% to 51.4% by April 22, 2025. The project will occur during a 12-week period from January 27, 2025, to April 22, 2025. Methods: A pre-survey was administered to hospital staff on 2 medical-surgical floors to analyze baseline knowledge and application of the BMAT 2.0. The research team conducted a 2-week in-service training during day and night shifts, utilizing posters, case scenarios, and presentations to increase staff knowledge. Following the in-service training, a post-survey that was identical to the pre-survey was distributed to analyze any changes in responses. Outcome measures included the following: BMAT competency, BMAT knowledge, mobility equipment awareness, documentation consistency, and appropriate responses to case scenarios. Results: The post-survey results revealed an 11.2% increase in hospital staff claiming they are extremely knowledgeable about the BMAT 2.0, a 12.7% increase in having formal training completed, and a 35.2% increase in awareness of equipment location. All case scenario responses showed increased accuracy, with one case scenario increasing from 43.1% to 71.1% appropriate responses. Conclusions: This project illustrated that in-service training successfully enhanced hospital staff competency in the application of the BMAT 2.0. Sustainability endeavors like continuing education are recommended to ensure the long-term success of this project.","abstract_html":"Objective: Early mobilization of patients is correlated to enhanced functional recovery (Zhang et al., 2019), decreased hospital stays (Zhang et al., 2019), and a reduction in healthcare costs (Liu et al., 2019). Unfortunately, inconsistency in hospital staff training and an absence of mobility assessment standardization have served as barriers to successful implementation. Aim: This quality improvement project aims to increase the percentage of RNs and CNAs who effectively use the BMAT 2.0 to promote early mobilization of medical-surgical endocrine and stroke patients by 20%, from 31.4% to 51.4% by April 22, 2025. The project will occur during a 12-week period from January 27, 2025, to April 22, 2025. Methods: A pre-survey was administered to hospital staff on 2 medical-surgical floors to analyze baseline knowledge and application of the BMAT 2.0. The research team conducted a 2-week in-service training during day and night shifts, utilizing posters, case scenarios, and presentations to increase staff knowledge. Following the in-service training, a post-survey that was identical to the pre-survey was distributed to analyze any changes in responses. Outcome measures included the following: BMAT competency, BMAT knowledge, mobility equipment awareness, documentation consistency, and appropriate responses to case scenarios. Results: The post-survey results revealed an 11.2% increase in hospital staff claiming they are extremely knowledgeable about the BMAT 2.0, a 12.7% increase in having formal training completed, and a 35.2% increase in awareness of equipment location. All case scenario responses showed increased accuracy, with one case scenario increasing from 43.1% to 71.1% appropriate responses. Conclusions: This project illustrated that in-service training successfully enhanced hospital staff competency in the application of the BMAT 2.0. Sustainability endeavors like continuing education are recommended to ensure the long-term success of this project.","abstract_has_math":false,"creators":["Gul, Elyas"],"institution":null,"degree_name":"Master of Science in Nursing (MSN)","degree_level":"Project/Capstone - Global access","degree_discipline":null,"degree_department":null,"school":null,"contributors":["Jennifer Zesati"],"advisors":[],"committee_chairs":[],"committee_members":[],"year":null,"date_issued":"","date_published":null,"updated_at":"2026-11-19T08:38:50Z","subjects":["BMAT","early mobilization","medical-surgical","nursing mobility assessment","patient mobilization outcomes","nursing mobility assessments","early mobilization in med-surg","BMAT mobility assessment tool","Other Nursing"],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://repository.usfca.edu/capstone/1894","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"https://repository.usfca.edu/capstone/1894","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://repository.usfca.edu/do/oai/?verb=GetRecord&metadataPrefix=oai_etdms&identifier=oai%3Arepository.usfca.edu%3Acapstone-3265","prefix":"oai_etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["Jennifer Zesati"]},{"key":"dc:creator","label":"Author","values":["Gul, Elyas"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.available","label":"Dc Date Available","values":["2025-06-06T07:00:00Z"]},{"key":"dc:date.created","label":"Dc Date Created","values":["2025-05-15T07:00:00Z"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Project/Capstone - Global access"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Nursing (MSN)"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["BMAT","early mobilization","medical-surgical","nursing mobility assessment","patient mobilization outcomes","nursing mobility assessments","early mobilization in med-surg","BMAT mobility assessment tool","Other Nursing"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["https://repository.usfca.edu/capstone/1894"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Objective: Early mobilization of patients is correlated to enhanced functional recovery (Zhang et al., 2019), decreased hospital stays (Zhang et al., 2019), and a reduction in healthcare costs (Liu et al., 2019). Unfortunately, inconsistency in hospital staff training and an absence of mobility assessment standardization have served as barriers to successful implementation. Aim: This quality improvement project aims to increase the percentage of RNs and CNAs who effectively use the BMAT 2.0 to promote early mobilization of medical-surgical endocrine and stroke patients by 20%, from 31.4% to 51.4% by April 22, 2025. The project will occur during a 12-week period from January 27, 2025, to April 22, 2025. Methods: A pre-survey was administered to hospital staff on 2 medical-surgical floors to analyze baseline knowledge and application of the BMAT 2.0. The research team conducted a 2-week in-service training during day and night shifts, utilizing posters, case scenarios, and presentations to increase staff knowledge. Following the in-service training, a post-survey that was identical to the pre-survey was distributed to analyze any changes in responses. Outcome measures included the following: BMAT competency, BMAT knowledge, mobility equipment awareness, documentation consistency, and appropriate responses to case scenarios. Results: The post-survey results revealed an 11.2% increase in hospital staff claiming they are extremely knowledgeable about the BMAT 2.0, a 12.7% increase in having formal training completed, and a 35.2% increase in awareness of equipment location. All case scenario responses showed increased accuracy, with one case scenario increasing from 43.1% to 71.1% appropriate responses. Conclusions: This project illustrated that in-service training successfully enhanced hospital staff competency in the application of the BMAT 2.0. Sustainability endeavors like continuing education are recommended to ensure the long-term success of this project."]},{"key":"dc:title","label":"Title","values":["Bridging the Gap in Early Mobilization: Implementing the BMAT 2.0 to Enhance Patient Care and Outcomes"]}]}],"canonical_facts":{"dc:contributor":["Jennifer Zesati"],"dc:creator":["Gul, Elyas"],"dc:date.available":["2025-06-06T07:00:00Z"],"dc:date.created":["2025-05-15T07:00:00Z"],"dc:description.abstract":["Objective: Early mobilization of patients is correlated to enhanced functional recovery (Zhang et al., 2019), decreased hospital stays (Zhang et al., 2019), and a reduction in healthcare costs (Liu et al., 2019). Unfortunately, inconsistency in hospital staff training and an absence of mobility assessment standardization have served as barriers to successful implementation. Aim: This quality improvement project aims to increase the percentage of RNs and CNAs who effectively use the BMAT 2.0 to promote early mobilization of medical-surgical endocrine and stroke patients by 20%, from 31.4% to 51.4% by April 22, 2025. The project will occur during a 12-week period from January 27, 2025, to April 22, 2025. Methods: A pre-survey was administered to hospital staff on 2 medical-surgical floors to analyze baseline knowledge and application of the BMAT 2.0. The research team conducted a 2-week in-service training during day and night shifts, utilizing posters, case scenarios, and presentations to increase staff knowledge. Following the in-service training, a post-survey that was identical to the pre-survey was distributed to analyze any changes in responses. Outcome measures included the following: BMAT competency, BMAT knowledge, mobility equipment awareness, documentation consistency, and appropriate responses to case scenarios. Results: The post-survey results revealed an 11.2% increase in hospital staff claiming they are extremely knowledgeable about the BMAT 2.0, a 12.7% increase in having formal training completed, and a 35.2% increase in awareness of equipment location. All case scenario responses showed increased accuracy, with one case scenario increasing from 43.1% to 71.1% appropriate responses. Conclusions: This project illustrated that in-service training successfully enhanced hospital staff competency in the application of the BMAT 2.0. Sustainability endeavors like continuing education are recommended to ensure the long-term success of this project."],"dc:identifier":["https://repository.usfca.edu/capstone/1894"],"dc:subject":["BMAT","early mobilization","medical-surgical","nursing mobility assessment","patient mobilization outcomes","nursing mobility assessments","early mobilization in med-surg","BMAT mobility assessment tool","Other Nursing"],"dc:title":["Bridging the Gap in Early Mobilization: Implementing the BMAT 2.0 to Enhance Patient Care and Outcomes"],"thesis:degree_level":["Project/Capstone - Global access"],"thesis:degree_name":["Master of Science in Nursing (MSN)"]},"updated_at":"2026-11-19T08:38:50Z"}