{"id":{"repo_id":"utahstate","oai_identifier":"oai:digitalcommons.usu.edu:etd-2591"},"canonical_url":"https://search.ndltd.org/etd/utahstate/oai:digitalcommons.usu.edu:etd-2591","repository":{"repo_id":"utahstate","name":"Utah State University","base_url":"https://digitalcommons.usu.edu/do/oai/"},"display":{"title":"Irrigation Expansion on the Sevier River, Utah, With Special Reference to the Piute Project","abstract":"On January 16, 1908, the State Board of Land Commissioners, on behalf of the State of Utah, undertook to build a reclamation project in the Sevier River Valley, intended to reclaim between 25,000 to 35,000 acres of the virgin lands lying on the west side of Sevier River in Sevier and San Pete Counties. From January, 1908 to January, 1914, the State expended nearly $1,000,000 for the construction of the reservior dm and the canal leading from it. Since that time nearly $200,000 has been spent for supplementary construction. This money was supplied by the State Reservior Land Grant Fund, which had been set aside by law for the building of reserviors. The Piut Project is one of the largest irrigation enterprises in the State.","abstract_html":"On January 16, 1908, the State Board of Land Commissioners, on behalf of the State of Utah, undertook to build a reclamation project in the Sevier River Valley, intended to reclaim between 25,000 to 35,000 acres of the virgin lands lying on the west side of Sevier River in Sevier and San Pete Counties. From January, 1908 to January, 1914, the State expended nearly $1,000,000 for the construction of the reservior dm and the canal leading from it. Since that time nearly $200,000 has been spent for supplementary construction. This money was supplied by the State Reservior Land Grant Fund, which had been set aside by law for the building of reserviors. The Piut Project is one of the largest irrigation enterprises in the State.","abstract_has_math":true,"creators":["Monson, O. W."],"institution":"Hosted by Utah State University Libraries","degree_name":"Master of Science (MS)","degree_level":"Thesis","degree_discipline":"Civil and Environmental Engineering","degree_department":null,"school":null,"contributors":["O. W. Israelsen","Ray B. West","W. L. Wanlass"],"advisors":[],"committee_chairs":[],"committee_members":[],"year":null,"date_issued":"","date_published":null,"updated_at":"2026-11-19T08:57:13Z","subjects":["Biological Engineering","Biomedical Engineering and Bioengineering","Engineering"],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.doi","label":"DOI","values":["https://doi.org/10.26076/75a2-0778"],"render_values":[{"text":"https://doi.org/10.26076/75a2-0778","href":"https://doi.org/10.26076/75a2-0778","code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://digitalcommons.usu.edu/etd/1592","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"https://digitalcommons.usu.edu/etd/1592","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://digitalcommons.usu.edu/do/oai/?verb=GetRecord&metadataPrefix=oai_etdms&identifier=oai%3Adigitalcommons.usu.edu%3Aetd-2591","prefix":"oai_etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["O. W. Israelsen","Ray B. West","W. L. Wanlass"]},{"key":"dc:creator","label":"Author","values":["Monson, O. W."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.available","label":"Dc Date Available","values":["2013-04-01T07:00:00Z"]},{"key":"dc:date.created","label":"Dc Date Created","values":["1928-05-01T08:00:00Z"]},{"key":"dc:publisher","label":"Institution","values":["Hosted by Utah State University Libraries"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Civil and Environmental Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Thesis"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science (MS)"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Biological Engineering","Biomedical Engineering and Bioengineering","Engineering"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["https://digitalcommons.usu.edu/etd/1592"]},{"key":"dc:identifier.doi","label":"DOI","values":["https://doi.org/10.26076/75a2-0778"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["On January 16, 1908, the State Board of Land Commissioners, on behalf of the State of Utah, undertook to build a reclamation project in the Sevier River Valley, intended to reclaim between 25,000 to 35,000 acres of the virgin lands lying on the west side of Sevier River in Sevier and San Pete Counties. From January, 1908 to January, 1914, the State expended nearly $1,000,000 for the construction of the reservior dm and the canal leading from it. Since that time nearly $200,000 has been spent for supplementary construction. This money was supplied by the State Reservior Land Grant Fund, which had been set aside by law for the building of reserviors. The Piut Project is one of the largest irrigation enterprises in the State."]},{"key":"dc:title","label":"Title","values":["Irrigation Expansion on the Sevier River, Utah, With Special Reference to the Piute Project"]}]}],"canonical_facts":{"dc:contributor":["O. W. Israelsen","Ray B. West","W. L. Wanlass"],"dc:creator":["Monson, O. W."],"dc:date.available":["2013-04-01T07:00:00Z"],"dc:date.created":["1928-05-01T08:00:00Z"],"dc:description.abstract":["On January 16, 1908, the State Board of Land Commissioners, on behalf of the State of Utah, undertook to build a reclamation project in the Sevier River Valley, intended to reclaim between 25,000 to 35,000 acres of the virgin lands lying on the west side of Sevier River in Sevier and San Pete Counties. From January, 1908 to January, 1914, the State expended nearly $1,000,000 for the construction of the reservior dm and the canal leading from it. Since that time nearly $200,000 has been spent for supplementary construction. This money was supplied by the State Reservior Land Grant Fund, which had been set aside by law for the building of reserviors. The Piut Project is one of the largest irrigation enterprises in the State."],"dc:identifier":["https://digitalcommons.usu.edu/etd/1592"],"dc:identifier.doi":["https://doi.org/10.26076/75a2-0778"],"dc:publisher":["Hosted by Utah State University Libraries"],"dc:subject":["Biological Engineering","Biomedical Engineering and Bioengineering","Engineering"],"dc:title":["Irrigation Expansion on the Sevier River, Utah, With Special Reference to the Piute Project"],"thesis:degree_discipline":["Civil and Environmental Engineering"],"thesis:degree_level":["Thesis"],"thesis:degree_name":["Master of Science (MS)"]},"updated_at":"2026-11-19T08:57:13Z"}