{"id":{"repo_id":"vilnius","oai_identifier":"oai:vu.lt:elaba:1800099"},"canonical_url":"https://search.ndltd.org/etd/vilnius/oai:vu.lt:elaba:1800099","repository":{"repo_id":"vilnius","name":"Vilnius University","base_url":"https://epublications.vu.lt/oai"},"display":{"title":"Vėjo elektrinių parko prijungimo prie skirstomųjų elektros tinklų galimybių tyrimas /","abstract":"Nowadays fossils start costliness, wind stations and their parks building and connection to Distribution Networks in this time is very actual theme. Over and over broad, not only on the seashore, in Lithuania are builted and connected wind stations and their parks. The aim of my work is the investigation of possibilities to connect the wind stations park to distribution networks, what influence the connect possibilities in the chosen point of distribution networks. I did the programme to the primitive test of possibilities to connect wind stations and their parks to distribution networks in this work. I did the investigation of possibilities to connect 6 MW wind station park to 35 kV and 10 kV distribution networks in Pakruojis district. I calculated the parameters of networks quality, when wind stations park is working and when is stopped. I give conclusion about results and succession of this investigation.","abstract_html":"Nowadays fossils start costliness, wind stations and their parks building and connection to Distribution Networks in this time is very actual theme. Over and over broad, not only on the seashore, in Lithuania are builted and connected wind stations and their parks. The aim of my work is the investigation of possibilities to connect the wind stations park to distribution networks, what influence the connect possibilities in the chosen point of distribution networks. I did the programme to the primitive test of possibilities to connect wind stations and their parks to distribution networks in this work. I did the investigation of possibilities to connect 6 MW wind station park to 35 kV and 10 kV distribution networks in Pakruojis district. I calculated the parameters of networks quality, when wind stations park is working and when is stopped. I give conclusion about results and succession of this investigation.","abstract_has_math":false,"creators":["Lekas, Bronislavas,"],"institution":"Institutional Repository of Vilnius University","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":["Nevardauskas, Enrikas Vilimantas"],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2010,"date_issued":"2010","date_published":"2010","updated_at":"2026-11-19T09:59:44Z","subjects":["Wind stations ; energetics ; wind station park"],"languages":["lit"],"rights":["info:eu-repo/semantics/openAccess"],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://repository.vu.lt/VU:ELABAETD1800099&prefLang=en_US","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"https://repository.vu.lt/VU:ELABAETD1800099&prefLang=en_US","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","download_url":null,"download_label":null,"download_source":null,"access_status":"open","embargo_until":null,"access_note":null},"source_record":{"url":"https://epublications.vu.lt/oai?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Avu.lt%3Aelaba%3A1800099","prefix":"oai_dc"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["Nevardauskas, Enrikas Vilimantas"]},{"key":"dc:creator","label":"Author","values":["Lekas, Bronislavas,"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2010"]},{"key":"dc:publisher","label":"Institution","values":["Institutional Repository of Vilnius University"]},{"key":"dc:relation","label":"Dc Relation","values":["https://epublications.vu.lt/object/elaba:1800099/1800099.pdf"]},{"key":"dc:type","label":"Dc Type","values":["info:eu-repo/semantics/masterThesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Wind stations ; energetics ; wind station park"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["lit"]},{"key":"dc:rights","label":"Dc Rights","values":["info:eu-repo/semantics/openAccess"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["https://repository.vu.lt/VU:ELABAETD1800099&prefLang=en_US"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["Nowadays fossils start costliness, wind stations and their parks building and connection to Distribution Networks in this time is very actual theme. Over and over broad, not only on the seashore, in Lithuania are builted and connected wind stations and their parks. The aim of my work is the investigation of possibilities to connect the wind stations park to distribution networks, what influence the connect possibilities in the chosen point of distribution networks. I did the programme to the primitive test of possibilities to connect wind stations and their parks to distribution networks in this work. I did the investigation of possibilities to connect 6 MW wind station park to 35 kV and 10 kV distribution networks in Pakruojis district. I calculated the parameters of networks quality, when wind stations park is working and when is stopped. I give conclusion about results and succession of this investigation."]},{"key":"dc:format","label":"Dc Format","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Vėjo elektrinių parko prijungimo prie skirstomųjų elektros tinklų galimybių tyrimas /","The Investigation of Possibilities to Connect the Wind Stations Park to Distribution Networks."]}]}],"canonical_facts":{"dc:contributor":["Nevardauskas, Enrikas Vilimantas"],"dc:creator":["Lekas, Bronislavas,"],"dc:date":["2010"],"dc:description":["Nowadays fossils start costliness, wind stations and their parks building and connection to Distribution Networks in this time is very actual theme. Over and over broad, not only on the seashore, in Lithuania are builted and connected wind stations and their parks. The aim of my work is the investigation of possibilities to connect the wind stations park to distribution networks, what influence the connect possibilities in the chosen point of distribution networks. I did the programme to the primitive test of possibilities to connect wind stations and their parks to distribution networks in this work. I did the investigation of possibilities to connect 6 MW wind station park to 35 kV and 10 kV distribution networks in Pakruojis district. I calculated the parameters of networks quality, when wind stations park is working and when is stopped. I give conclusion about results and succession of this investigation."],"dc:format":["application/pdf"],"dc:identifier":["https://repository.vu.lt/VU:ELABAETD1800099&prefLang=en_US"],"dc:language":["lit"],"dc:publisher":["Institutional Repository of Vilnius University"],"dc:relation":["https://epublications.vu.lt/object/elaba:1800099/1800099.pdf"],"dc:rights":["info:eu-repo/semantics/openAccess"],"dc:subject":["Wind stations ; energetics ; wind station park"],"dc:title":["Vėjo elektrinių parko prijungimo prie skirstomųjų elektros tinklų galimybių tyrimas /","The Investigation of Possibilities to Connect the Wind Stations Park to Distribution Networks."],"dc:type":["info:eu-repo/semantics/masterThesis"]},"updated_at":"2026-11-19T09:59:44Z"}