{"id":{"repo_id":"vilnius","oai_identifier":"oai:vu.lt:elaba:1867387"},"canonical_url":"https://search.ndltd.org/etd/vilnius/oai:vu.lt:elaba:1867387","repository":{"repo_id":"vilnius","name":"Vilnius University","base_url":"https://epublications.vu.lt/oai"},"display":{"title":"Joniškio vandens ūkio problemų sprendimo galimybių analizė /","abstract":"The bachelor thesis - Joniškio water solutions feasibility analysis. The aim - to evaluate Joniškio water condition. Thesis to analyze the core of the EU water protection policy aspects to describe Lithuania commitments of the EU water protection legislation. Considering the state of water management Joniškio main results show that: water supply system uses ~ 60% gyventojų.Vandens treatment facilities reconstructed in 2010. capacity of 3,600 m³ / day. Sewage treatment plant reconstruction in 2009. implementing biological cleaning capacity of 4,200 m³ / day. Treatment plant resulting from the excess sludge is drained belt presses, Joniškio r. In 2012. the total length of the water supply was above 157 km. wastewater network of about 110 km. existing storm sewerage network length of about 30 km. Most of the pipelines needed renovation. The main problem - it is the biological wastewater treatment process formed the rational use of dewatered sludge.","abstract_html":"The bachelor thesis - Joniškio water solutions feasibility analysis. The aim - to evaluate Joniškio water condition. Thesis to analyze the core of the EU water protection policy aspects to describe Lithuania commitments of the EU water protection legislation. Considering the state of water management Joniškio main results show that: water supply system uses ~ 60% gyventojų.Vandens treatment facilities reconstructed in 2010. capacity of 3,600 m³ / day. Sewage treatment plant reconstruction in 2009. implementing biological cleaning capacity of 4,200 m³ / day. Treatment plant resulting from the excess sludge is drained belt presses, Joniškio r. In 2012. the total length of the water supply was above 157 km. wastewater network of about 110 km. existing storm sewerage network length of about 30 km. Most of the pipelines needed renovation. The main problem - it is the biological wastewater treatment process formed the rational use of dewatered sludge.","abstract_has_math":false,"creators":["Veikalas, Antanas,"],"institution":"Institutional Repository of Vilnius University","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":["Tričys, Vaclovas"],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2013,"date_issued":"2013","date_published":"2013","updated_at":"2026-11-19T10:00:23Z","subjects":["Water ; sewage ; plants"],"languages":["lit"],"rights":["info:eu-repo/semantics/openAccess"],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://repository.vu.lt/VU:ELABAETD1867387&prefLang=en_US","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"https://repository.vu.lt/VU:ELABAETD1867387&prefLang=en_US","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","download_url":null,"download_label":null,"download_source":null,"access_status":"open","embargo_until":null,"access_note":null},"source_record":{"url":"https://epublications.vu.lt/oai?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Avu.lt%3Aelaba%3A1867387","prefix":"oai_dc"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["Tričys, Vaclovas"]},{"key":"dc:creator","label":"Author","values":["Veikalas, Antanas,"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2013"]},{"key":"dc:publisher","label":"Institution","values":["Institutional Repository of Vilnius University"]},{"key":"dc:relation","label":"Dc Relation","values":["https://epublications.vu.lt/object/elaba:1867387/1867387.pdf"]},{"key":"dc:type","label":"Dc Type","values":["info:eu-repo/semantics/bachelorThesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Water ; sewage ; plants"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["lit"]},{"key":"dc:rights","label":"Dc Rights","values":["info:eu-repo/semantics/openAccess"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["https://repository.vu.lt/VU:ELABAETD1867387&prefLang=en_US"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["The bachelor thesis - Joniškio water solutions feasibility analysis. The aim - to evaluate Joniškio water condition. Thesis to analyze the core of the EU water protection policy aspects to describe Lithuania commitments of the EU water protection legislation. Considering the state of water management Joniškio main results show that: water supply system uses ~ 60% gyventojų.Vandens treatment facilities reconstructed in 2010. capacity of 3,600 m³ / day. Sewage treatment plant reconstruction in 2009. implementing biological cleaning capacity of 4,200 m³ / day. Treatment plant resulting from the excess sludge is drained belt presses, Joniškio r. In 2012. the total length of the water supply was above 157 km. wastewater network of about 110 km. existing storm sewerage network length of about 30 km. Most of the pipelines needed renovation. The main problem - it is the biological wastewater treatment process formed the rational use of dewatered sludge."]},{"key":"dc:format","label":"Dc Format","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Joniškio vandens ūkio problemų sprendimo galimybių analizė /","Joniškis water solutions feasibility analysis."]}]}],"canonical_facts":{"dc:contributor":["Tričys, Vaclovas"],"dc:creator":["Veikalas, Antanas,"],"dc:date":["2013"],"dc:description":["The bachelor thesis - Joniškio water solutions feasibility analysis. The aim - to evaluate Joniškio water condition. Thesis to analyze the core of the EU water protection policy aspects to describe Lithuania commitments of the EU water protection legislation. Considering the state of water management Joniškio main results show that: water supply system uses ~ 60% gyventojų.Vandens treatment facilities reconstructed in 2010. capacity of 3,600 m³ / day. Sewage treatment plant reconstruction in 2009. implementing biological cleaning capacity of 4,200 m³ / day. Treatment plant resulting from the excess sludge is drained belt presses, Joniškio r. In 2012. the total length of the water supply was above 157 km. wastewater network of about 110 km. existing storm sewerage network length of about 30 km. Most of the pipelines needed renovation. The main problem - it is the biological wastewater treatment process formed the rational use of dewatered sludge."],"dc:format":["application/pdf"],"dc:identifier":["https://repository.vu.lt/VU:ELABAETD1867387&prefLang=en_US"],"dc:language":["lit"],"dc:publisher":["Institutional Repository of Vilnius University"],"dc:relation":["https://epublications.vu.lt/object/elaba:1867387/1867387.pdf"],"dc:rights":["info:eu-repo/semantics/openAccess"],"dc:subject":["Water ; sewage ; plants"],"dc:title":["Joniškio vandens ūkio problemų sprendimo galimybių analizė /","Joniškis water solutions feasibility analysis."],"dc:type":["info:eu-repo/semantics/bachelorThesis"]},"updated_at":"2026-11-19T10:00:23Z"}