{"id":{"repo_id":"vilnius","oai_identifier":"oai:vu.lt:elaba:1926229"},"canonical_url":"https://search.ndltd.org/etd/vilnius/oai:vu.lt:elaba:1926229","repository":{"repo_id":"vilnius","name":"Vilnius University","base_url":"https://epublications.vu.lt/oai"},"display":{"title":"Komandinio programų kūrimo proceso tyrimas /","abstract":"IT organizations use different models to guide their software process improvement efforts. The most popular are the Capability Maturity Model Integration for Software (CMMI-SW) and ISO 15504. Still these organizations often struggle with implementation details. Both the CMMI-SW and ISO 15504 describe what an organization at a high level of process maturity should be doing, but do not says how it should be implemented. The Team Software Process (TSP) provides a framework as well as a set of processes, procedures, guidelines, and tools for project teams to use in the mature software development process. The main problem of the Team Software Process is the lack of official documentation. So the first goal of this master thesis is to reconstruct TSP methodology. The second goal is to produce TSP implementation guide. This master thesis contains the main structure of the TSP, it’s relation with the Personal Software Process (PSP) ant the Capability Maturity Model (CMMI), reconstructed TSP model and TSP implementation guide for defined project team type.","abstract_html":"IT organizations use different models to guide their software process improvement efforts. The most popular are the Capability Maturity Model Integration for Software (CMMI-SW) and ISO 15504. Still these organizations often struggle with implementation details. Both the CMMI-SW and ISO 15504 describe what an organization at a high level of process maturity should be doing, but do not says how it should be implemented. The Team Software Process (TSP) provides a framework as well as a set of processes, procedures, guidelines, and tools for project teams to use in the mature software development process. The main problem of the Team Software Process is the lack of official documentation. So the first goal of this master thesis is to reconstruct TSP methodology. The second goal is to produce TSP implementation guide. This master thesis contains the main structure of the TSP, it’s relation with the Personal Software Process (PSP) ant the Capability Maturity Model (CMMI), reconstructed TSP model and TSP implementation guide for defined project team type.","abstract_has_math":false,"creators":["Gavrilov, Andrej,"],"institution":"Institutional Repository of Vilnius University","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":["Ragaišis, Saulius"],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2009,"date_issued":"2009","date_published":"2009","updated_at":"2026-11-19T10:00:52Z","subjects":[],"languages":["lit"],"rights":["info:eu-repo/semantics/openAccess"],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://repository.vu.lt/VU:ELABAETD1926229&prefLang=en_US","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"https://repository.vu.lt/VU:ELABAETD1926229&prefLang=en_US","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","download_url":null,"download_label":null,"download_source":null,"access_status":"open","embargo_until":null,"access_note":null},"source_record":{"url":"https://epublications.vu.lt/oai?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Avu.lt%3Aelaba%3A1926229","prefix":"oai_dc"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["Ragaišis, Saulius"]},{"key":"dc:creator","label":"Author","values":["Gavrilov, Andrej,"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2009"]},{"key":"dc:publisher","label":"Institution","values":["Institutional Repository of Vilnius University"]},{"key":"dc:relation","label":"Dc Relation","values":["https://epublications.vu.lt/object/elaba:1926229/1926229.pdf"]},{"key":"dc:type","label":"Dc Type","values":["info:eu-repo/semantics/masterThesis"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["lit"]},{"key":"dc:rights","label":"Dc Rights","values":["info:eu-repo/semantics/openAccess"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["https://repository.vu.lt/VU:ELABAETD1926229&prefLang=en_US"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["IT organizations use different models to guide their software process improvement efforts. The most popular are the Capability Maturity Model Integration for Software (CMMI-SW) and ISO 15504. Still these organizations often struggle with implementation details. Both the CMMI-SW and ISO 15504 describe what an organization at a high level of process maturity should be doing, but do not says how it should be implemented. The Team Software Process (TSP) provides a framework as well as a set of processes, procedures, guidelines, and tools for project teams to use in the mature software development process. The main problem of the Team Software Process is the lack of official documentation. So the first goal of this master thesis is to reconstruct TSP methodology. The second goal is to produce TSP implementation guide. This master thesis contains the main structure of the TSP, it’s relation with the Personal Software Process (PSP) ant the Capability Maturity Model (CMMI), reconstructed TSP model and TSP implementation guide for defined project team type."]},{"key":"dc:format","label":"Dc Format","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Komandinio programų kūrimo proceso tyrimas /","Analysis of the team software process (tsp)."]}]}],"canonical_facts":{"dc:contributor":["Ragaišis, Saulius"],"dc:creator":["Gavrilov, Andrej,"],"dc:date":["2009"],"dc:description":["IT organizations use different models to guide their software process improvement efforts. The most popular are the Capability Maturity Model Integration for Software (CMMI-SW) and ISO 15504. Still these organizations often struggle with implementation details. Both the CMMI-SW and ISO 15504 describe what an organization at a high level of process maturity should be doing, but do not says how it should be implemented. The Team Software Process (TSP) provides a framework as well as a set of processes, procedures, guidelines, and tools for project teams to use in the mature software development process. The main problem of the Team Software Process is the lack of official documentation. So the first goal of this master thesis is to reconstruct TSP methodology. The second goal is to produce TSP implementation guide. This master thesis contains the main structure of the TSP, it’s relation with the Personal Software Process (PSP) ant the Capability Maturity Model (CMMI), reconstructed TSP model and TSP implementation guide for defined project team type."],"dc:format":["application/pdf"],"dc:identifier":["https://repository.vu.lt/VU:ELABAETD1926229&prefLang=en_US"],"dc:language":["lit"],"dc:publisher":["Institutional Repository of Vilnius University"],"dc:relation":["https://epublications.vu.lt/object/elaba:1926229/1926229.pdf"],"dc:rights":["info:eu-repo/semantics/openAccess"],"dc:title":["Komandinio programų kūrimo proceso tyrimas /","Analysis of the team software process (tsp)."],"dc:type":["info:eu-repo/semantics/masterThesis"]},"updated_at":"2026-11-19T10:00:52Z"}