{"id":{"repo_id":"vilnius","oai_identifier":"oai:vu.lt:elaba:192973087"},"canonical_url":"https://search.ndltd.org/etd/vilnius/oai:vu.lt:elaba:192973087","repository":{"repo_id":"vilnius","name":"Vilnius University","base_url":"https://epublications.vu.lt/oai"},"display":{"title":"AB \"ORLEN Lietuva\" TG-1 ir TG-2 blokų relinės apsaugos ir automatikos skaičiavimai /","abstract":"In the final thesis, the technical data of the electrical equipment of the TG-1 and TG-2 10 kV switchboards are counted. According to the requirements of the object, customer’s needs, and the rules for the installation of relay protection and automation of electrical equipment approved by the Ministry of Energy of the Republic of Lithuania, the regulations of relay protection and automation for two turbogenerators at the JSC \"ORLEN Lietuva\" object were calculated. According to the calculations of the RAA regulations, the relay protection devices detect and isolate the faulty part by operating tripping devices, which in turn safely isolate the faulty part of the network in a time not exceeding 0.25 s. The calculated values ensure the safe operation of the entire system. After the project was accomplished and delivered to the client, the tests were completed, and the project was implemented in the object. Permanent operation.","abstract_html":"In the final thesis, the technical data of the electrical equipment of the TG-1 and TG-2 10 kV switchboards are counted. According to the requirements of the object, customer’s needs, and the rules for the installation of relay protection and automation of electrical equipment approved by the Ministry of Energy of the Republic of Lithuania, the regulations of relay protection and automation for two turbogenerators at the JSC &quot;ORLEN Lietuva&quot; object were calculated. According to the calculations of the RAA regulations, the relay protection devices detect and isolate the faulty part by operating tripping devices, which in turn safely isolate the faulty part of the network in a time not exceeding 0.25 s. The calculated values ensure the safe operation of the entire system. After the project was accomplished and delivered to the client, the tests were completed, and the project was implemented in the object. Permanent operation.","abstract_has_math":false,"creators":["Sinickaja, Evelina,"],"institution":"Institutional Repository of Vilnius University","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2022,"date_issued":"2022","date_published":"2022","updated_at":"2026-11-19T09:56:19Z","subjects":[],"languages":["lit"],"rights":["info:eu-repo/semantics/openAccess"],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://repository.vu.lt/VU:ELABAETD192973087&prefLang=en_US","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"https://repository.vu.lt/VU:ELABAETD192973087&prefLang=en_US","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","download_url":null,"download_label":null,"download_source":null,"access_status":"open","embargo_until":null,"access_note":null},"source_record":{"url":"https://epublications.vu.lt/oai?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Avu.lt%3Aelaba%3A192973087","prefix":"oai_dc"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:creator","label":"Author","values":["Sinickaja, Evelina,"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2022"]},{"key":"dc:publisher","label":"Institution","values":["Institutional Repository of Vilnius University"]},{"key":"dc:relation","label":"Dc Relation","values":["https://epublications.vu.lt/object/elaba:192973087/192973087.pdf"]},{"key":"dc:type","label":"Dc Type","values":["info:eu-repo/semantics/bachelorThesis"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["lit"]},{"key":"dc:rights","label":"Dc Rights","values":["info:eu-repo/semantics/openAccess"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["https://repository.vu.lt/VU:ELABAETD192973087&prefLang=en_US"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["In the final thesis, the technical data of the electrical equipment of the TG-1 and TG-2 10 kV switchboards are counted. According to the requirements of the object, customer’s needs, and the rules for the installation of relay protection and automation of electrical equipment approved by the Ministry of Energy of the Republic of Lithuania, the regulations of relay protection and automation for two turbogenerators at the JSC \"ORLEN Lietuva\" object were calculated. According to the calculations of the RAA regulations, the relay protection devices detect and isolate the faulty part by operating tripping devices, which in turn safely isolate the faulty part of the network in a time not exceeding 0.25 s. The calculated values ensure the safe operation of the entire system. After the project was accomplished and delivered to the client, the tests were completed, and the project was implemented in the object. Permanent operation."]},{"key":"dc:format","label":"Dc Format","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["AB \"ORLEN Lietuva\" TG-1 ir TG-2 blokų relinės apsaugos ir automatikos skaičiavimai /","Calculations of relay protection and automation of tg-1 and tg-2 blocks of jsc \"orlen lietuva\"."]}]}],"canonical_facts":{"dc:creator":["Sinickaja, Evelina,"],"dc:date":["2022"],"dc:description":["In the final thesis, the technical data of the electrical equipment of the TG-1 and TG-2 10 kV switchboards are counted. According to the requirements of the object, customer’s needs, and the rules for the installation of relay protection and automation of electrical equipment approved by the Ministry of Energy of the Republic of Lithuania, the regulations of relay protection and automation for two turbogenerators at the JSC \"ORLEN Lietuva\" object were calculated. According to the calculations of the RAA regulations, the relay protection devices detect and isolate the faulty part by operating tripping devices, which in turn safely isolate the faulty part of the network in a time not exceeding 0.25 s. The calculated values ensure the safe operation of the entire system. After the project was accomplished and delivered to the client, the tests were completed, and the project was implemented in the object. Permanent operation."],"dc:format":["application/pdf"],"dc:identifier":["https://repository.vu.lt/VU:ELABAETD192973087&prefLang=en_US"],"dc:language":["lit"],"dc:publisher":["Institutional Repository of Vilnius University"],"dc:relation":["https://epublications.vu.lt/object/elaba:192973087/192973087.pdf"],"dc:rights":["info:eu-repo/semantics/openAccess"],"dc:title":["AB \"ORLEN Lietuva\" TG-1 ir TG-2 blokų relinės apsaugos ir automatikos skaičiavimai /","Calculations of relay protection and automation of tg-1 and tg-2 blocks of jsc \"orlen lietuva\"."],"dc:type":["info:eu-repo/semantics/bachelorThesis"]},"updated_at":"2026-11-19T09:56:19Z"}