{"id":{"repo_id":"vilnius","oai_identifier":"oai:vu.lt:elaba:1933908"},"canonical_url":"https://search.ndltd.org/etd/vilnius/oai:vu.lt:elaba:1933908","repository":{"repo_id":"vilnius","name":"Vilnius University","base_url":"https://epublications.vu.lt/oai"},"display":{"title":"75 kW kieto kuro katilo modernizavimas /","abstract":"In the first part of the bachelor thesis there are calculations of the 75 kilowatt bioleres feeding systems main parameters, the efficiency coefficient and the production volume is shown. The second part describes the purpose of the prodact and its usability. Also different possibilities are looked in to for choosing the best one for the modernization of the feeding system. This includes taking in to consideration all kinds of parts and standard products which are compared to other construction solutions. Other technical calculations were made (the correct motors with gear reductions were chosen, the racks strength calculations were carried out). In the third part the describtion of a parts technological route from every unti was made. The equipment which is needed for making these parts was chosen. The quntaty was decided. The allowance, determination of cutting regimes and technical rationing is accomplished. The fourth part describes the products technical safety requirements, the electrical parts installation requirements, the products maintenance requirements. In the fifth part is shown the economical calculations. These calculations helped to set costs of desing work, the number of workers needed and the right number of machinery. Also the place for work was chosen. All this helped to set the 75 kilowatt solid fuel central heating boilers price.","abstract_html":"In the first part of the bachelor thesis there are calculations of the 75 kilowatt bioleres feeding systems main parameters, the efficiency coefficient and the production volume is shown. The second part describes the purpose of the prodact and its usability. Also different possibilities are looked in to for choosing the best one for the modernization of the feeding system. This includes taking in to consideration all kinds of parts and standard products which are compared to other construction solutions. Other technical calculations were made (the correct motors with gear reductions were chosen, the racks strength calculations were carried out). In the third part the describtion of a parts technological route from every unti was made. The equipment which is needed for making these parts was chosen. The quntaty was decided. The allowance, determination of cutting regimes and technical rationing is accomplished. The fourth part describes the products technical safety requirements, the electrical parts installation requirements, the products maintenance requirements. In the fifth part is shown the economical calculations. These calculations helped to set costs of desing work, the number of workers needed and the right number of machinery. Also the place for work was chosen. All this helped to set the 75 kilowatt solid fuel central heating boilers price.","abstract_has_math":false,"creators":["Vaitekūnas, Airidas,","Paulauskas, Viktoras,","Vinickis, Tomas,"],"institution":"Institutional Repository of Vilnius University","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":["Skačkovas, Vitalijus"],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2013,"date_issued":"2013","date_published":"2013","updated_at":"2026-11-19T10:01:02Z","subjects":["Solid fuel ; boilers ; modernization"],"languages":["lit"],"rights":["info:eu-repo/semantics/openAccess"],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://repository.vu.lt/VU:ELABAETD1933908&prefLang=en_US","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"https://repository.vu.lt/VU:ELABAETD1933908&prefLang=en_US","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","download_url":null,"download_label":null,"download_source":null,"access_status":"open","embargo_until":null,"access_note":null},"source_record":{"url":"https://epublications.vu.lt/oai?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Avu.lt%3Aelaba%3A1933908","prefix":"oai_dc"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["Skačkovas, Vitalijus"]},{"key":"dc:creator","label":"Author","values":["Vaitekūnas, Airidas,","Paulauskas, Viktoras,","Vinickis, Tomas,"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2013"]},{"key":"dc:publisher","label":"Institution","values":["Institutional Repository of Vilnius University"]},{"key":"dc:relation","label":"Dc Relation","values":["https://epublications.vu.lt/object/elaba:1933908/1933908.pdf"]},{"key":"dc:type","label":"Dc Type","values":["info:eu-repo/semantics/bachelorThesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Solid fuel ; boilers ; modernization"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["lit"]},{"key":"dc:rights","label":"Dc Rights","values":["info:eu-repo/semantics/openAccess"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["https://repository.vu.lt/VU:ELABAETD1933908&prefLang=en_US"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["In the first part of the bachelor thesis there are calculations of the 75 kilowatt bioleres feeding systems main parameters, the efficiency coefficient and the production volume is shown. The second part describes the purpose of the prodact and its usability. Also different possibilities are looked in to for choosing the best one for the modernization of the feeding system. This includes taking in to consideration all kinds of parts and standard products which are compared to other construction solutions. Other technical calculations were made (the correct motors with gear reductions were chosen, the racks strength calculations were carried out). In the third part the describtion of a parts technological route from every unti was made. The equipment which is needed for making these parts was chosen. The quntaty was decided. The allowance, determination of cutting regimes and technical rationing is accomplished. The fourth part describes the products technical safety requirements, the electrical parts installation requirements, the products maintenance requirements. In the fifth part is shown the economical calculations. These calculations helped to set costs of desing work, the number of workers needed and the right number of machinery. Also the place for work was chosen. All this helped to set the 75 kilowatt solid fuel central heating boilers price."]},{"key":"dc:format","label":"Dc Format","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["75 kW kieto kuro katilo modernizavimas /","Modernization of a 75 kilowatt solid fuel central heating boilers."]}]}],"canonical_facts":{"dc:contributor":["Skačkovas, Vitalijus"],"dc:creator":["Vaitekūnas, Airidas,","Paulauskas, Viktoras,","Vinickis, Tomas,"],"dc:date":["2013"],"dc:description":["In the first part of the bachelor thesis there are calculations of the 75 kilowatt bioleres feeding systems main parameters, the efficiency coefficient and the production volume is shown. The second part describes the purpose of the prodact and its usability. Also different possibilities are looked in to for choosing the best one for the modernization of the feeding system. This includes taking in to consideration all kinds of parts and standard products which are compared to other construction solutions. Other technical calculations were made (the correct motors with gear reductions were chosen, the racks strength calculations were carried out). In the third part the describtion of a parts technological route from every unti was made. The equipment which is needed for making these parts was chosen. The quntaty was decided. The allowance, determination of cutting regimes and technical rationing is accomplished. The fourth part describes the products technical safety requirements, the electrical parts installation requirements, the products maintenance requirements. In the fifth part is shown the economical calculations. These calculations helped to set costs of desing work, the number of workers needed and the right number of machinery. Also the place for work was chosen. All this helped to set the 75 kilowatt solid fuel central heating boilers price."],"dc:format":["application/pdf"],"dc:identifier":["https://repository.vu.lt/VU:ELABAETD1933908&prefLang=en_US"],"dc:language":["lit"],"dc:publisher":["Institutional Repository of Vilnius University"],"dc:relation":["https://epublications.vu.lt/object/elaba:1933908/1933908.pdf"],"dc:rights":["info:eu-repo/semantics/openAccess"],"dc:subject":["Solid fuel ; boilers ; modernization"],"dc:title":["75 kW kieto kuro katilo modernizavimas /","Modernization of a 75 kilowatt solid fuel central heating boilers."],"dc:type":["info:eu-repo/semantics/bachelorThesis"]},"updated_at":"2026-11-19T10:01:02Z"}