{"id":{"repo_id":"vilnius","oai_identifier":"oai:vu.lt:elaba:1935069"},"canonical_url":"https://search.ndltd.org/etd/vilnius/oai:vu.lt:elaba:1935069","repository":{"repo_id":"vilnius","name":"Vilnius University","base_url":"https://epublications.vu.lt/oai"},"display":{"title":"Kareivinių pastatas šiaulių rajone Mumaičių kaime /","abstract":"This Bachelor’s work of designing three-story barracks building with a gym and a basement. The building is planned to construct Siauliai district Mumaičiai village in the territory of the military unit. The first, second and third floor space arranged for one company. Installed in the basement room weapon storage, gun cleaning and companies storage. Before building equipped formation Square, sidewalks for pedestrians, the possibility of approaching the building of transport, the remaining part of the plot plante. The project consists of architectural, structural, technological-economic parts and drawings. The first - the architecture - describes the plot, building characteristics, the engineering systems, and the construction and finishing solutions. The drawings presented in the site and building plans, elevations, sections and assemblies.The constructive part of the design of steel beam S1 and reinforced concrete floor slab forming poster PK-53-14-S600. These structures are attached drawings.Technological-economic section describes some of the work, technological card, work records and quantities of quantities prepared by local estimate, the other sheets. The graphic layout of the building, which includes traffic building sites, material sites, employee household premises, selected The project is carried out in accordance with the Ministry of construction law, building regulations (STR), the rules and background material provided in the reference list.","abstract_html":"This Bachelor’s work of designing three-story barracks building with a gym and a basement. The building is planned to construct Siauliai district Mumaičiai village in the territory of the military unit. The first, second and third floor space arranged for one company. Installed in the basement room weapon storage, gun cleaning and companies storage. Before building equipped formation Square, sidewalks for pedestrians, the possibility of approaching the building of transport, the remaining part of the plot plante. The project consists of architectural, structural, technological-economic parts and drawings. The first - the architecture - describes the plot, building characteristics, the engineering systems, and the construction and finishing solutions. The drawings presented in the site and building plans, elevations, sections and assemblies.The constructive part of the design of steel beam S1 and reinforced concrete floor slab forming poster PK-53-14-S600. These structures are attached drawings.Technological-economic section describes some of the work, technological card, work records and quantities of quantities prepared by local estimate, the other sheets. The graphic layout of the building, which includes traffic building sites, material sites, employee household premises, selected The project is carried out in accordance with the Ministry of construction law, building regulations (STR), the rules and background material provided in the reference list.","abstract_has_math":false,"creators":["Šėgžda, Aidas,"],"institution":"Institutional Repository of Vilnius University","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":["Reizgevičius, Marius"],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2013,"date_issued":"2013","date_published":"2013","updated_at":"2026-11-19T10:01:02Z","subjects":["barracks ; reinforced concrete construction ; the estimated cost"],"languages":["lit"],"rights":["info:eu-repo/semantics/openAccess"],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://repository.vu.lt/VU:ELABAETD1935069&prefLang=en_US","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"https://repository.vu.lt/VU:ELABAETD1935069&prefLang=en_US","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","download_url":null,"download_label":null,"download_source":null,"access_status":"open","embargo_until":null,"access_note":null},"source_record":{"url":"https://epublications.vu.lt/oai?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Avu.lt%3Aelaba%3A1935069","prefix":"oai_dc"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["Reizgevičius, Marius"]},{"key":"dc:creator","label":"Author","values":["Šėgžda, Aidas,"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2013"]},{"key":"dc:publisher","label":"Institution","values":["Institutional Repository of Vilnius University"]},{"key":"dc:relation","label":"Dc Relation","values":["https://epublications.vu.lt/object/elaba:1935069/1935069.pdf"]},{"key":"dc:type","label":"Dc Type","values":["info:eu-repo/semantics/bachelorThesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["barracks ; reinforced concrete construction ; the estimated cost"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["lit"]},{"key":"dc:rights","label":"Dc Rights","values":["info:eu-repo/semantics/openAccess"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["https://repository.vu.lt/VU:ELABAETD1935069&prefLang=en_US"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["This Bachelor’s work of designing three-story barracks building with a gym and a basement. The building is planned to construct Siauliai district Mumaičiai village in the territory of the military unit. The first, second and third floor space arranged for one company. Installed in the basement room weapon storage, gun cleaning and companies storage. Before building equipped formation Square, sidewalks for pedestrians, the possibility of approaching the building of transport, the remaining part of the plot plante. The project consists of architectural, structural, technological-economic parts and drawings. The first - the architecture - describes the plot, building characteristics, the engineering systems, and the construction and finishing solutions. The drawings presented in the site and building plans, elevations, sections and assemblies.The constructive part of the design of steel beam S1 and reinforced concrete floor slab forming poster PK-53-14-S600. These structures are attached drawings.Technological-economic section describes some of the work, technological card, work records and quantities of quantities prepared by local estimate, the other sheets. The graphic layout of the building, which includes traffic building sites, material sites, employee household premises, selected The project is carried out in accordance with the Ministry of construction law, building regulations (STR), the rules and background material provided in the reference list."]},{"key":"dc:format","label":"Dc Format","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Kareivinių pastatas šiaulių rajone Mumaičių kaime /","Barrack building šiauliai area mumaičiai village."]}]}],"canonical_facts":{"dc:contributor":["Reizgevičius, Marius"],"dc:creator":["Šėgžda, Aidas,"],"dc:date":["2013"],"dc:description":["This Bachelor’s work of designing three-story barracks building with a gym and a basement. The building is planned to construct Siauliai district Mumaičiai village in the territory of the military unit. The first, second and third floor space arranged for one company. Installed in the basement room weapon storage, gun cleaning and companies storage. Before building equipped formation Square, sidewalks for pedestrians, the possibility of approaching the building of transport, the remaining part of the plot plante. The project consists of architectural, structural, technological-economic parts and drawings. The first - the architecture - describes the plot, building characteristics, the engineering systems, and the construction and finishing solutions. The drawings presented in the site and building plans, elevations, sections and assemblies.The constructive part of the design of steel beam S1 and reinforced concrete floor slab forming poster PK-53-14-S600. These structures are attached drawings.Technological-economic section describes some of the work, technological card, work records and quantities of quantities prepared by local estimate, the other sheets. The graphic layout of the building, which includes traffic building sites, material sites, employee household premises, selected The project is carried out in accordance with the Ministry of construction law, building regulations (STR), the rules and background material provided in the reference list."],"dc:format":["application/pdf"],"dc:identifier":["https://repository.vu.lt/VU:ELABAETD1935069&prefLang=en_US"],"dc:language":["lit"],"dc:publisher":["Institutional Repository of Vilnius University"],"dc:relation":["https://epublications.vu.lt/object/elaba:1935069/1935069.pdf"],"dc:rights":["info:eu-repo/semantics/openAccess"],"dc:subject":["barracks ; reinforced concrete construction ; the estimated cost"],"dc:title":["Kareivinių pastatas šiaulių rajone Mumaičių kaime /","Barrack building šiauliai area mumaičiai village."],"dc:type":["info:eu-repo/semantics/bachelorThesis"]},"updated_at":"2026-11-19T10:01:02Z"}