{"id":{"repo_id":"vilnius","oai_identifier":"oai:vu.lt:elaba:2034727"},"canonical_url":"https://search.ndltd.org/etd/vilnius/oai:vu.lt:elaba:2034727","repository":{"repo_id":"vilnius","name":"Vilnius University","base_url":"https://epublications.vu.lt/oai"},"display":{"title":"Karkasinių namų gamybos cechas Plungėje /","abstract":"In this final work is designed one-story building of Frame house production factory with an area of 2461,81 m2. Object is planned to produce wall, florr and roof segments for frame house.The building will be constructed in J. Kučinskio Street in Plunge. The first part is characteristic of the object, general layout, size-planing decision of building, technical-economical facts, structural decision and engineering services. Structural part contains of the project of concrete hollowcore slab, steel truss nineteen metres long and steel truss eighteen metres long. The third part contains describes the installation requirements for reinforced concrete structures and prepare a truss assembly technological card. The fourth part contains a local estimate, the total outlay, materials will express a statement of the need for mechanisms records and payroll records g / b pillars for installation, roofing installation and roofing installation.","abstract_html":"In this final work is designed one-story building of Frame house production factory with an area of 2461,81 m2. Object is planned to produce wall, florr and roof segments for frame house.The building will be constructed in J. Kučinskio Street in Plunge. The first part is characteristic of the object, general layout, size-planing decision of building, technical-economical facts, structural decision and engineering services. Structural part contains of the project of concrete hollowcore slab, steel truss nineteen metres long and steel truss eighteen metres long. The third part contains describes the installation requirements for reinforced concrete structures and prepare a truss assembly technological card. The fourth part contains a local estimate, the total outlay, materials will express a statement of the need for mechanisms records and payroll records g / b pillars for installation, roofing installation and roofing installation.","abstract_has_math":false,"creators":["Anužis, Evaldas,"],"institution":"Institutional Repository of Vilnius University","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":["Pelikša, Mykolas"],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2013,"date_issued":"2013","date_published":"2013","updated_at":"2026-11-19T09:58:09Z","subjects":["frame houses ; production factory ; reinforced concrete structures ; steel truss ; the estimated cost"],"languages":["lit"],"rights":["info:eu-repo/semantics/openAccess"],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://repository.vu.lt/VU:ELABAETD2034727&prefLang=en_US","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"https://repository.vu.lt/VU:ELABAETD2034727&prefLang=en_US","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","download_url":null,"download_label":null,"download_source":null,"access_status":"open","embargo_until":null,"access_note":null},"source_record":{"url":"https://epublications.vu.lt/oai?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Avu.lt%3Aelaba%3A2034727","prefix":"oai_dc"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["Pelikša, Mykolas"]},{"key":"dc:creator","label":"Author","values":["Anužis, Evaldas,"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2013"]},{"key":"dc:publisher","label":"Institution","values":["Institutional Repository of Vilnius University"]},{"key":"dc:relation","label":"Dc Relation","values":["https://epublications.vu.lt/object/elaba:2034727/2034727.pdf"]},{"key":"dc:type","label":"Dc Type","values":["info:eu-repo/semantics/bachelorThesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["frame houses ; production factory ; reinforced concrete structures ; steel truss ; the estimated cost"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["lit"]},{"key":"dc:rights","label":"Dc Rights","values":["info:eu-repo/semantics/openAccess"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["https://repository.vu.lt/VU:ELABAETD2034727&prefLang=en_US"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["In this final work is designed one-story building of Frame house production factory with an area of 2461,81 m2. Object is planned to produce wall, florr and roof segments for frame house.The building will be constructed in J. Kučinskio Street in Plunge. The first part is characteristic of the object, general layout, size-planing decision of building, technical-economical facts, structural decision and engineering services. Structural part contains of the project of concrete hollowcore slab, steel truss nineteen metres long and steel truss eighteen metres long. The third part contains describes the installation requirements for reinforced concrete structures and prepare a truss assembly technological card. The fourth part contains a local estimate, the total outlay, materials will express a statement of the need for mechanisms records and payroll records g / b pillars for installation, roofing installation and roofing installation."]},{"key":"dc:format","label":"Dc Format","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Karkasinių namų gamybos cechas Plungėje /","Frame house production factory in Plunge."]}]}],"canonical_facts":{"dc:contributor":["Pelikša, Mykolas"],"dc:creator":["Anužis, Evaldas,"],"dc:date":["2013"],"dc:description":["In this final work is designed one-story building of Frame house production factory with an area of 2461,81 m2. Object is planned to produce wall, florr and roof segments for frame house.The building will be constructed in J. Kučinskio Street in Plunge. The first part is characteristic of the object, general layout, size-planing decision of building, technical-economical facts, structural decision and engineering services. Structural part contains of the project of concrete hollowcore slab, steel truss nineteen metres long and steel truss eighteen metres long. The third part contains describes the installation requirements for reinforced concrete structures and prepare a truss assembly technological card. The fourth part contains a local estimate, the total outlay, materials will express a statement of the need for mechanisms records and payroll records g / b pillars for installation, roofing installation and roofing installation."],"dc:format":["application/pdf"],"dc:identifier":["https://repository.vu.lt/VU:ELABAETD2034727&prefLang=en_US"],"dc:language":["lit"],"dc:publisher":["Institutional Repository of Vilnius University"],"dc:relation":["https://epublications.vu.lt/object/elaba:2034727/2034727.pdf"],"dc:rights":["info:eu-repo/semantics/openAccess"],"dc:subject":["frame houses ; production factory ; reinforced concrete structures ; steel truss ; the estimated cost"],"dc:title":["Karkasinių namų gamybos cechas Plungėje /","Frame house production factory in Plunge."],"dc:type":["info:eu-repo/semantics/bachelorThesis"]},"updated_at":"2026-11-19T09:58:09Z"}