{"id":{"repo_id":"vilnius","oai_identifier":"oai:vu.lt:elaba:2062120"},"canonical_url":"https://search.ndltd.org/etd/vilnius/oai:vu.lt:elaba:2062120","repository":{"repo_id":"vilnius","name":"Vilnius University","base_url":"https://epublications.vu.lt/oai"},"display":{"title":"10kV linijų techninių financinių rodiklių tyrimas /","abstract":"In this final paper the 10 kV distributive networks in Radviliskis district has been analysed. According to the data of 2009, the length of 10 kV air route of electricity was 988,62 km and the length of cable route of electricity was 115,6 km. All the air route of electricity has been built using ferroconcrete supports. The density of routes is 0,68 km/ km2. The consumers of electricity experience material harm due to abortion of distribution of electricity. The requirements for distributive networks have been changed when Lithuania joined EU, because all the electricity routes have been built when Lithuania was part of the Soviet Union. We will try to evaluate some parameters of present network and to compare with normative. In this paper the conclusions about the reliability and further maintenance of electricity network has been formulated. Agreeably with results received, solutions for current network improvement have been given.","abstract_html":"In this final paper the 10 kV distributive networks in Radviliskis district has been analysed. According to the data of 2009, the length of 10 kV air route of electricity was 988,62 km and the length of cable route of electricity was 115,6 km. All the air route of electricity has been built using ferroconcrete supports. The density of routes is 0,68 km/ km2. The consumers of electricity experience material harm due to abortion of distribution of electricity. The requirements for distributive networks have been changed when Lithuania joined EU, because all the electricity routes have been built when Lithuania was part of the Soviet Union. We will try to evaluate some parameters of present network and to compare with normative. In this paper the conclusions about the reliability and further maintenance of electricity network has been formulated. Agreeably with results received, solutions for current network improvement have been given.","abstract_has_math":false,"creators":["Bertulis, Algirdas,"],"institution":"Institutional Repository of Vilnius University","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":["Turauskas, Zigmantas"],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2010,"date_issued":"2010","date_published":"2010","updated_at":"2026-11-19T09:58:21Z","subjects":["technical measures ; power lines ; distribution network"],"languages":["lit"],"rights":["info:eu-repo/semantics/openAccess"],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://repository.vu.lt/VU:ELABAETD2062120&prefLang=en_US","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"https://repository.vu.lt/VU:ELABAETD2062120&prefLang=en_US","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","download_url":null,"download_label":null,"download_source":null,"access_status":"open","embargo_until":null,"access_note":null},"source_record":{"url":"https://epublications.vu.lt/oai?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Avu.lt%3Aelaba%3A2062120","prefix":"oai_dc"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["Turauskas, Zigmantas"]},{"key":"dc:creator","label":"Author","values":["Bertulis, Algirdas,"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2010"]},{"key":"dc:publisher","label":"Institution","values":["Institutional Repository of Vilnius University"]},{"key":"dc:relation","label":"Dc Relation","values":["https://epublications.vu.lt/object/elaba:2062120/2062120.pdf"]},{"key":"dc:type","label":"Dc Type","values":["info:eu-repo/semantics/masterThesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["technical measures ; power lines ; distribution network"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["lit"]},{"key":"dc:rights","label":"Dc Rights","values":["info:eu-repo/semantics/openAccess"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["https://repository.vu.lt/VU:ELABAETD2062120&prefLang=en_US"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["In this final paper the 10 kV distributive networks in Radviliskis district has been analysed. According to the data of 2009, the length of 10 kV air route of electricity was 988,62 km and the length of cable route of electricity was 115,6 km. All the air route of electricity has been built using ferroconcrete supports. The density of routes is 0,68 km/ km2. The consumers of electricity experience material harm due to abortion of distribution of electricity. The requirements for distributive networks have been changed when Lithuania joined EU, because all the electricity routes have been built when Lithuania was part of the Soviet Union. We will try to evaluate some parameters of present network and to compare with normative. In this paper the conclusions about the reliability and further maintenance of electricity network has been formulated. Agreeably with results received, solutions for current network improvement have been given."]},{"key":"dc:format","label":"Dc Format","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["10kV linijų techninių financinių rodiklių tyrimas /","Research of 10 kV lines' technical - financial measures."]}]}],"canonical_facts":{"dc:contributor":["Turauskas, Zigmantas"],"dc:creator":["Bertulis, Algirdas,"],"dc:date":["2010"],"dc:description":["In this final paper the 10 kV distributive networks in Radviliskis district has been analysed. According to the data of 2009, the length of 10 kV air route of electricity was 988,62 km and the length of cable route of electricity was 115,6 km. All the air route of electricity has been built using ferroconcrete supports. The density of routes is 0,68 km/ km2. The consumers of electricity experience material harm due to abortion of distribution of electricity. The requirements for distributive networks have been changed when Lithuania joined EU, because all the electricity routes have been built when Lithuania was part of the Soviet Union. We will try to evaluate some parameters of present network and to compare with normative. In this paper the conclusions about the reliability and further maintenance of electricity network has been formulated. Agreeably with results received, solutions for current network improvement have been given."],"dc:format":["application/pdf"],"dc:identifier":["https://repository.vu.lt/VU:ELABAETD2062120&prefLang=en_US"],"dc:language":["lit"],"dc:publisher":["Institutional Repository of Vilnius University"],"dc:relation":["https://epublications.vu.lt/object/elaba:2062120/2062120.pdf"],"dc:rights":["info:eu-repo/semantics/openAccess"],"dc:subject":["technical measures ; power lines ; distribution network"],"dc:title":["10kV linijų techninių financinių rodiklių tyrimas /","Research of 10 kV lines' technical - financial measures."],"dc:type":["info:eu-repo/semantics/masterThesis"]},"updated_at":"2026-11-19T09:58:21Z"}