{"id":{"repo_id":"vilnius","oai_identifier":"oai:vu.lt:elaba:210577818"},"canonical_url":"https://search.ndltd.org/etd/vilnius/oai:vu.lt:elaba:210577818","repository":{"repo_id":"vilnius","name":"Vilnius University","base_url":"https://epublications.vu.lt/oai"},"display":{"title":"Surinkimo linijos darbo ciklo laiko įvertinimas pagal montuojamos plokštės ypatybes ir pateiktų komponentų sąrašą /","abstract":"The purpose of this work was to identify and find the influence of surface mount components, multiplication of PCBs on the panel, batch number and the produced amount to the cycle of machine, calculated as components per hour. Work objective: Find a method to determine the operating speed of a surface mount component assembly machine based on board features and component list. The main conclusions of this work: 1. A preliminary comparison of the proposed components per hour (&#945;_CPH) value with the values obtained during production shows its adequacy. 2. The number of components per hour of this evaluation saturates and reaches the technological maximum, unlike in the case of the first line. 3. The number of components per hour of the proposed value, predicted for flexible and rigid panels, coincides.","abstract_html":"The purpose of this work was to identify and find the influence of surface mount components, multiplication of PCBs on the panel, batch number and the produced amount to the cycle of machine, calculated as components per hour. Work objective: Find a method to determine the operating speed of a surface mount component assembly machine based on board features and component list. The main conclusions of this work: 1. A preliminary comparison of the proposed components per hour (&amp;#945;_CPH) value with the values obtained during production shows its adequacy. 2. The number of components per hour of this evaluation saturates and reaches the technological maximum, unlike in the case of the first line. 3. The number of components per hour of the proposed value, predicted for flexible and rigid panels, coincides.","abstract_has_math":false,"creators":["Mickus, Laurynas,"],"institution":"Institutional Repository of Vilnius University","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2024,"date_issued":"2024","date_published":"2024","updated_at":"2026-11-19T10:04:30Z","subjects":[],"languages":["lit"],"rights":["info:eu-repo/semantics/openAccess"],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://repository.vu.lt/VU:ELABAETD210577818&prefLang=en_US","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"https://repository.vu.lt/VU:ELABAETD210577818&prefLang=en_US","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","download_url":null,"download_label":null,"download_source":null,"access_status":"open","embargo_until":null,"access_note":null},"source_record":{"url":"https://epublications.vu.lt/oai?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Avu.lt%3Aelaba%3A210577818","prefix":"oai_dc"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:creator","label":"Author","values":["Mickus, Laurynas,"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2024"]},{"key":"dc:publisher","label":"Institution","values":["Institutional Repository of Vilnius University"]},{"key":"dc:relation","label":"Dc Relation","values":["https://epublications.vu.lt/object/elaba:210577818/210577818.pdf"]},{"key":"dc:type","label":"Dc Type","values":["info:eu-repo/semantics/bachelorThesis"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["lit"]},{"key":"dc:rights","label":"Dc Rights","values":["info:eu-repo/semantics/openAccess"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["https://repository.vu.lt/VU:ELABAETD210577818&prefLang=en_US"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["The purpose of this work was to identify and find the influence of surface mount components, multiplication of PCBs on the panel, batch number and the produced amount to the cycle of machine, calculated as components per hour. Work objective: Find a method to determine the operating speed of a surface mount component assembly machine based on board features and component list. The main conclusions of this work: 1. A preliminary comparison of the proposed components per hour (&#945;_CPH) value with the values obtained during production shows its adequacy. 2. The number of components per hour of this evaluation saturates and reaches the technological maximum, unlike in the case of the first line. 3. The number of components per hour of the proposed value, predicted for flexible and rigid panels, coincides."]},{"key":"dc:format","label":"Dc Format","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Surinkimo linijos darbo ciklo laiko įvertinimas pagal montuojamos plokštės ypatybes ir pateiktų komponentų sąrašą /","Evaluation of the assembly line labor cycle time based on the characteristics of the assembled board and the list of provided components."]}]}],"canonical_facts":{"dc:creator":["Mickus, Laurynas,"],"dc:date":["2024"],"dc:description":["The purpose of this work was to identify and find the influence of surface mount components, multiplication of PCBs on the panel, batch number and the produced amount to the cycle of machine, calculated as components per hour. Work objective: Find a method to determine the operating speed of a surface mount component assembly machine based on board features and component list. The main conclusions of this work: 1. A preliminary comparison of the proposed components per hour (&#945;_CPH) value with the values obtained during production shows its adequacy. 2. The number of components per hour of this evaluation saturates and reaches the technological maximum, unlike in the case of the first line. 3. The number of components per hour of the proposed value, predicted for flexible and rigid panels, coincides."],"dc:format":["application/pdf"],"dc:identifier":["https://repository.vu.lt/VU:ELABAETD210577818&prefLang=en_US"],"dc:language":["lit"],"dc:publisher":["Institutional Repository of Vilnius University"],"dc:relation":["https://epublications.vu.lt/object/elaba:210577818/210577818.pdf"],"dc:rights":["info:eu-repo/semantics/openAccess"],"dc:title":["Surinkimo linijos darbo ciklo laiko įvertinimas pagal montuojamos plokštės ypatybes ir pateiktų komponentų sąrašą /","Evaluation of the assembly line labor cycle time based on the characteristics of the assembled board and the list of provided components."],"dc:type":["info:eu-repo/semantics/bachelorThesis"]},"updated_at":"2026-11-19T10:04:30Z"}