{"id":{"repo_id":"vilnius","oai_identifier":"oai:vu.lt:elaba:29047069"},"canonical_url":"https://search.ndltd.org/etd/vilnius/oai:vu.lt:elaba:29047069","repository":{"repo_id":"vilnius","name":"Vilnius University","base_url":"https://epublications.vu.lt/oai"},"display":{"title":"Elektros tinklų Kužių miestelio Ringuvos, Ryto, Aušros ir Gėlių gatvėse rekonstravimas /","abstract":"The object of the final bachelor work is to project a reliable, economic and safe electricity network. The main aim of the work is to improve electricity supply reliability for 64 consumers. According to JSC “Energy Distribution Operator” (AB ESO) electricity distribution network technological development strategy, prepared in 2016 year, and (AB ESO) technical requirements for 10 and 0,4 kV network, and General Rules of Electricity Equipment Installation, next to the existing KT Dn-329 modular transformer, the rear modular transformer with 160 kVA power transformer has been projected. It has been projected to connect the transformer with Al 3x50 cable from a newly built pillar in L-300 airline from Dainai 110/10 kV TP, next to existing pillar 316/9 of the KT Dn-329 divider. The operation of both, existing and newly mounted transformers’ has been projected, therefore, it is possible to switch the consumers to the newly mounted network smoothly. For the connection of the dwelling houses, cable distribution cupboards and commercial account cupboards have been projected next to the consumer ground boundaries. They have been planned to be connected with a radial 0,4 kW cable network from the projected modular transformer. The projected network is with minimal amount of equipment, but categorical JSC ESO requirements force to project with cables based not on technical calculations and with a large crosssection area, thus the price of the reconstruction is high. While planning new or reconstructing existing electricity networks, one should take into consideration a more realistic situation of networks, decisions should be made according to technical calculation results, thus it would allow to significantly reduce both, a price of new consumers’ connection and existing electricity network reconstruction.","abstract_html":"The object of the final bachelor work is to project a reliable, economic and safe electricity network. The main aim of the work is to improve electricity supply reliability for 64 consumers. According to JSC “Energy Distribution Operator” (AB ESO) electricity distribution network technological development strategy, prepared in 2016 year, and (AB ESO) technical requirements for 10 and 0,4 kV network, and General Rules of Electricity Equipment Installation, next to the existing KT Dn-329 modular transformer, the rear modular transformer with 160 kVA power transformer has been projected. It has been projected to connect the transformer with Al 3x50 cable from a newly built pillar in L-300 airline from Dainai 110/10 kV TP, next to existing pillar 316/9 of the KT Dn-329 divider. The operation of both, existing and newly mounted transformers’ has been projected, therefore, it is possible to switch the consumers to the newly mounted network smoothly. For the connection of the dwelling houses, cable distribution cupboards and commercial account cupboards have been projected next to the consumer ground boundaries. They have been planned to be connected with a radial 0,4 kW cable network from the projected modular transformer. The projected network is with minimal amount of equipment, but categorical JSC ESO requirements force to project with cables based not on technical calculations and with a large crosssection area, thus the price of the reconstruction is high. While planning new or reconstructing existing electricity networks, one should take into consideration a more realistic situation of networks, decisions should be made according to technical calculation results, thus it would allow to significantly reduce both, a price of new consumers’ connection and existing electricity network reconstruction.","abstract_has_math":false,"creators":["Klevinskaitė, Jolanta,"],"institution":"Institutional Repository of Vilnius University","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":["Rauchas, Modestas"],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2018,"date_issued":"2018","date_published":"2018","updated_at":"2026-11-19T09:57:27Z","subjects":["bachelor, work, Reconstruction ; networks ; transformer"],"languages":["lit"],"rights":["info:eu-repo/semantics/openAccess"],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://repository.vu.lt/VU:ELABAETD29047069&prefLang=en_US","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"https://repository.vu.lt/VU:ELABAETD29047069&prefLang=en_US","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","download_url":null,"download_label":null,"download_source":null,"access_status":"open","embargo_until":null,"access_note":null},"source_record":{"url":"https://epublications.vu.lt/oai?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Avu.lt%3Aelaba%3A29047069","prefix":"oai_dc"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["Rauchas, Modestas"]},{"key":"dc:creator","label":"Author","values":["Klevinskaitė, Jolanta,"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2018"]},{"key":"dc:publisher","label":"Institution","values":["Institutional Repository of Vilnius University"]},{"key":"dc:relation","label":"Dc Relation","values":["https://epublications.vu.lt/object/elaba:29047069/29047069.pdf"]},{"key":"dc:type","label":"Dc Type","values":["info:eu-repo/semantics/bachelorThesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["bachelor, work, Reconstruction ; networks ; transformer"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["lit"]},{"key":"dc:rights","label":"Dc Rights","values":["info:eu-repo/semantics/openAccess"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["https://repository.vu.lt/VU:ELABAETD29047069&prefLang=en_US"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["The object of the final bachelor work is to project a reliable, economic and safe electricity network. The main aim of the work is to improve electricity supply reliability for 64 consumers. According to JSC “Energy Distribution Operator” (AB ESO) electricity distribution network technological development strategy, prepared in 2016 year, and (AB ESO) technical requirements for 10 and 0,4 kV network, and General Rules of Electricity Equipment Installation, next to the existing KT Dn-329 modular transformer, the rear modular transformer with 160 kVA power transformer has been projected. It has been projected to connect the transformer with Al 3x50 cable from a newly built pillar in L-300 airline from Dainai 110/10 kV TP, next to existing pillar 316/9 of the KT Dn-329 divider. The operation of both, existing and newly mounted transformers’ has been projected, therefore, it is possible to switch the consumers to the newly mounted network smoothly. For the connection of the dwelling houses, cable distribution cupboards and commercial account cupboards have been projected next to the consumer ground boundaries. They have been planned to be connected with a radial 0,4 kW cable network from the projected modular transformer. The projected network is with minimal amount of equipment, but categorical JSC ESO requirements force to project with cables based not on technical calculations and with a large crosssection area, thus the price of the reconstruction is high. While planning new or reconstructing existing electricity networks, one should take into consideration a more realistic situation of networks, decisions should be made according to technical calculation results, thus it would allow to significantly reduce both, a price of new consumers’ connection and existing electricity network reconstruction."]},{"key":"dc:format","label":"Dc Format","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Elektros tinklų Kužių miestelio Ringuvos, Ryto, Aušros ir Gėlių gatvėse rekonstravimas /","Reconstruction of Ringuvos, Ryto, Aušros and Gėlių street Electricity networks’ in Kužiai town."]}]}],"canonical_facts":{"dc:contributor":["Rauchas, Modestas"],"dc:creator":["Klevinskaitė, Jolanta,"],"dc:date":["2018"],"dc:description":["The object of the final bachelor work is to project a reliable, economic and safe electricity network. The main aim of the work is to improve electricity supply reliability for 64 consumers. According to JSC “Energy Distribution Operator” (AB ESO) electricity distribution network technological development strategy, prepared in 2016 year, and (AB ESO) technical requirements for 10 and 0,4 kV network, and General Rules of Electricity Equipment Installation, next to the existing KT Dn-329 modular transformer, the rear modular transformer with 160 kVA power transformer has been projected. It has been projected to connect the transformer with Al 3x50 cable from a newly built pillar in L-300 airline from Dainai 110/10 kV TP, next to existing pillar 316/9 of the KT Dn-329 divider. The operation of both, existing and newly mounted transformers’ has been projected, therefore, it is possible to switch the consumers to the newly mounted network smoothly. For the connection of the dwelling houses, cable distribution cupboards and commercial account cupboards have been projected next to the consumer ground boundaries. They have been planned to be connected with a radial 0,4 kW cable network from the projected modular transformer. The projected network is with minimal amount of equipment, but categorical JSC ESO requirements force to project with cables based not on technical calculations and with a large crosssection area, thus the price of the reconstruction is high. While planning new or reconstructing existing electricity networks, one should take into consideration a more realistic situation of networks, decisions should be made according to technical calculation results, thus it would allow to significantly reduce both, a price of new consumers’ connection and existing electricity network reconstruction."],"dc:format":["application/pdf"],"dc:identifier":["https://repository.vu.lt/VU:ELABAETD29047069&prefLang=en_US"],"dc:language":["lit"],"dc:publisher":["Institutional Repository of Vilnius University"],"dc:relation":["https://epublications.vu.lt/object/elaba:29047069/29047069.pdf"],"dc:rights":["info:eu-repo/semantics/openAccess"],"dc:subject":["bachelor, work, Reconstruction ; networks ; transformer"],"dc:title":["Elektros tinklų Kužių miestelio Ringuvos, Ryto, Aušros ir Gėlių gatvėse rekonstravimas /","Reconstruction of Ringuvos, Ryto, Aušros and Gėlių street Electricity networks’ in Kužiai town."],"dc:type":["info:eu-repo/semantics/bachelorThesis"]},"updated_at":"2026-11-19T09:57:27Z"}