{"id":{"repo_id":"vilnius","oai_identifier":"oai:vu.lt:elaba:308333829"},"canonical_url":"https://search.ndltd.org/etd/vilnius/oai:vu.lt:elaba:308333829","repository":{"repo_id":"vilnius","name":"Vilnius University","base_url":"https://epublications.vu.lt/oai"},"display":{"title":"Elektros galios poreikio vertinimo galimybės taikant statybos leidimų erdvinę analizę /","abstract":"As residential and non-residential areas expand, the need for engineering infrastructure also increases. Therefore, it is important to have a method that would allow assessing at an early stage where the need for greater electrical power may arise. Building permit data is a suitable source for this, as they show the planned construction even before the buildings physically appear in the territory. The work analyzes the data of the construction permits of the Klaipėda district municipality for 2021-2025. The aim of the work is to find out whether these data can be applied to the preliminary assessment of the need for electrical power using GIS methods. The buildings are divided by purpose, each is assigned an approximate electrical power, and the results are depicted on 1 x 1 km grid maps. The power distribution is also compared with the ESO distribution network infrastructure and the distances of the permits for 2025 to the nearest 6-10 kV transformers are analyzed. The results of the study showed that the highest construction activity and preliminary demand for electricity are concentrated in the western part of the municipality, closer to the city of Klaipėda. Residential construction is dominated by single-family houses, which account for 93% of all residential permits, while recreational facilities in Karklė stand out in the group of non-residential buildings. It was found that the areas of the highest load mostly coincide with urbanized areas where the electricity network is already developed. However, more accurate calculations would require data on the area of &#8203;&#8203;buildings.","abstract_html":"As residential and non-residential areas expand, the need for engineering infrastructure also increases. Therefore, it is important to have a method that would allow assessing at an early stage where the need for greater electrical power may arise. Building permit data is a suitable source for this, as they show the planned construction even before the buildings physically appear in the territory. The work analyzes the data of the construction permits of the Klaipėda district municipality for 2021-2025. The aim of the work is to find out whether these data can be applied to the preliminary assessment of the need for electrical power using GIS methods. The buildings are divided by purpose, each is assigned an approximate electrical power, and the results are depicted on 1 x 1 km grid maps. The power distribution is also compared with the ESO distribution network infrastructure and the distances of the permits for 2025 to the nearest 6-10 kV transformers are analyzed. The results of the study showed that the highest construction activity and preliminary demand for electricity are concentrated in the western part of the municipality, closer to the city of Klaipėda. Residential construction is dominated by single-family houses, which account for 93% of all residential permits, while recreational facilities in Karklė stand out in the group of non-residential buildings. It was found that the areas of the highest load mostly coincide with urbanized areas where the electricity network is already developed. However, more accurate calculations would require data on the area of &amp;#8203;&amp;#8203;buildings.","abstract_has_math":false,"creators":["Jančauskaitė, Rugilė,"],"institution":"Institutional Repository of Vilnius University","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2026,"date_issued":"2026","date_published":"2026","updated_at":"2026-11-19T10:12:52Z","subjects":[],"languages":["lit"],"rights":["info:eu-repo/semantics/openAccess"],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://repository.vu.lt/VU:ELABAETD308333829&prefLang=en_US","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"https://repository.vu.lt/VU:ELABAETD308333829&prefLang=en_US","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","download_url":null,"download_label":null,"download_source":null,"access_status":"open","embargo_until":null,"access_note":null},"source_record":{"url":"https://epublications.vu.lt/oai?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Avu.lt%3Aelaba%3A308333829","prefix":"oai_dc"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:creator","label":"Author","values":["Jančauskaitė, Rugilė,"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2026"]},{"key":"dc:publisher","label":"Institution","values":["Institutional Repository of Vilnius University"]},{"key":"dc:relation","label":"Dc Relation","values":["https://epublications.vu.lt/object/elaba:308333829/308333829.pdf"]},{"key":"dc:type","label":"Dc Type","values":["info:eu-repo/semantics/bachelorThesis"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["lit"]},{"key":"dc:rights","label":"Dc Rights","values":["info:eu-repo/semantics/openAccess"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["https://repository.vu.lt/VU:ELABAETD308333829&prefLang=en_US"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["As residential and non-residential areas expand, the need for engineering infrastructure also increases. Therefore, it is important to have a method that would allow assessing at an early stage where the need for greater electrical power may arise. Building permit data is a suitable source for this, as they show the planned construction even before the buildings physically appear in the territory. The work analyzes the data of the construction permits of the Klaipėda district municipality for 2021-2025. The aim of the work is to find out whether these data can be applied to the preliminary assessment of the need for electrical power using GIS methods. The buildings are divided by purpose, each is assigned an approximate electrical power, and the results are depicted on 1 x 1 km grid maps. The power distribution is also compared with the ESO distribution network infrastructure and the distances of the permits for 2025 to the nearest 6-10 kV transformers are analyzed. The results of the study showed that the highest construction activity and preliminary demand for electricity are concentrated in the western part of the municipality, closer to the city of Klaipėda. Residential construction is dominated by single-family houses, which account for 93% of all residential permits, while recreational facilities in Karklė stand out in the group of non-residential buildings. It was found that the areas of the highest load mostly coincide with urbanized areas where the electricity network is already developed. However, more accurate calculations would require data on the area of &#8203;&#8203;buildings."]},{"key":"dc:format","label":"Dc Format","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Elektros galios poreikio vertinimo galimybės taikant statybos leidimų erdvinę analizę /","Possibilities of assessing electricity demand by applying spatial analysis of building permits."]}]}],"canonical_facts":{"dc:creator":["Jančauskaitė, Rugilė,"],"dc:date":["2026"],"dc:description":["As residential and non-residential areas expand, the need for engineering infrastructure also increases. Therefore, it is important to have a method that would allow assessing at an early stage where the need for greater electrical power may arise. Building permit data is a suitable source for this, as they show the planned construction even before the buildings physically appear in the territory. The work analyzes the data of the construction permits of the Klaipėda district municipality for 2021-2025. The aim of the work is to find out whether these data can be applied to the preliminary assessment of the need for electrical power using GIS methods. The buildings are divided by purpose, each is assigned an approximate electrical power, and the results are depicted on 1 x 1 km grid maps. The power distribution is also compared with the ESO distribution network infrastructure and the distances of the permits for 2025 to the nearest 6-10 kV transformers are analyzed. The results of the study showed that the highest construction activity and preliminary demand for electricity are concentrated in the western part of the municipality, closer to the city of Klaipėda. Residential construction is dominated by single-family houses, which account for 93% of all residential permits, while recreational facilities in Karklė stand out in the group of non-residential buildings. It was found that the areas of the highest load mostly coincide with urbanized areas where the electricity network is already developed. However, more accurate calculations would require data on the area of &#8203;&#8203;buildings."],"dc:format":["application/pdf"],"dc:identifier":["https://repository.vu.lt/VU:ELABAETD308333829&prefLang=en_US"],"dc:language":["lit"],"dc:publisher":["Institutional Repository of Vilnius University"],"dc:relation":["https://epublications.vu.lt/object/elaba:308333829/308333829.pdf"],"dc:rights":["info:eu-repo/semantics/openAccess"],"dc:title":["Elektros galios poreikio vertinimo galimybės taikant statybos leidimų erdvinę analizę /","Possibilities of assessing electricity demand by applying spatial analysis of building permits."],"dc:type":["info:eu-repo/semantics/bachelorThesis"]},"updated_at":"2026-11-19T10:12:52Z"}