{"id":{"repo_id":"vilnius","oai_identifier":"oai:vu.lt:elaba:47441916"},"canonical_url":"https://search.ndltd.org/etd/vilnius/oai:vu.lt:elaba:47441916","repository":{"repo_id":"vilnius","name":"Vilnius University","base_url":"https://epublications.vu.lt/oai"},"display":{"title":"Prekybos centro „YORI“ Šiauliuose statybos projektas /","abstract":"The thesis includes the projecting of the shopping center “YORI” which will be built in Serbentų street, Šiauliai. The building consists of two main functional areas: commercial and administrative space. Total building area is 1001,74 m2. The building is classified as a special purpose building. Bachelor's work consists of these following parts: 1. Architectural part – there is described building site plan, layout of rooms, construction decisions and engineering networks. In the drawings there are: plan of the plot, plans of the floors, building sections and facade. 2. Construction part – designed 18 m metallic truss SA-18, designed reinforced floor slab PP - 5.65. In the drawings there are given designed construction’s drawings. 3. Technological and economical part – there was made drilled foundation technological card, were selected major mechanisms, tools and described the necessary ground works, estimated works timetable, calculated quantities of the works.","abstract_html":"The thesis includes the projecting of the shopping center “YORI” which will be built in Serbentų street, Šiauliai. The building consists of two main functional areas: commercial and administrative space. Total building area is 1001,74 m2. The building is classified as a special purpose building. Bachelor&#x27;s work consists of these following parts: 1. Architectural part – there is described building site plan, layout of rooms, construction decisions and engineering networks. In the drawings there are: plan of the plot, plans of the floors, building sections and facade. 2. Construction part – designed 18 m metallic truss SA-18, designed reinforced floor slab PP - 5.65. In the drawings there are given designed construction’s drawings. 3. Technological and economical part – there was made drilled foundation technological card, were selected major mechanisms, tools and described the necessary ground works, estimated works timetable, calculated quantities of the works.","abstract_has_math":false,"creators":["Žičkutė, Karolina,"],"institution":"Institutional Repository of Vilnius University","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":["Reizgevičius, Marius"],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2020,"date_issued":"2020","date_published":"2020","updated_at":"2026-11-19T09:54:47Z","subjects":["Shopping centre ; hallow core slab ; metal truss ; local estimate."],"languages":["lit"],"rights":["info:eu-repo/semantics/openAccess"],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://repository.vu.lt/VU:ELABAETD47441916&prefLang=en_US","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"https://repository.vu.lt/VU:ELABAETD47441916&prefLang=en_US","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","download_url":null,"download_label":null,"download_source":null,"access_status":"open","embargo_until":null,"access_note":null},"source_record":{"url":"https://epublications.vu.lt/oai?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Avu.lt%3Aelaba%3A47441916","prefix":"oai_dc"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["Reizgevičius, Marius"]},{"key":"dc:creator","label":"Author","values":["Žičkutė, Karolina,"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2020"]},{"key":"dc:publisher","label":"Institution","values":["Institutional Repository of Vilnius University"]},{"key":"dc:relation","label":"Dc Relation","values":["https://epublications.vu.lt/object/elaba:47441916/47441916.pdf"]},{"key":"dc:type","label":"Dc Type","values":["info:eu-repo/semantics/bachelorThesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Shopping centre ; hallow core slab ; metal truss ; local estimate."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["lit"]},{"key":"dc:rights","label":"Dc Rights","values":["info:eu-repo/semantics/openAccess"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["https://repository.vu.lt/VU:ELABAETD47441916&prefLang=en_US"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["The thesis includes the projecting of the shopping center “YORI” which will be built in Serbentų street, Šiauliai. The building consists of two main functional areas: commercial and administrative space. Total building area is 1001,74 m2. The building is classified as a special purpose building. Bachelor's work consists of these following parts: 1. Architectural part – there is described building site plan, layout of rooms, construction decisions and engineering networks. In the drawings there are: plan of the plot, plans of the floors, building sections and facade. 2. Construction part – designed 18 m metallic truss SA-18, designed reinforced floor slab PP - 5.65. In the drawings there are given designed construction’s drawings. 3. Technological and economical part – there was made drilled foundation technological card, were selected major mechanisms, tools and described the necessary ground works, estimated works timetable, calculated quantities of the works."]},{"key":"dc:format","label":"Dc Format","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Prekybos centro „YORI“ Šiauliuose statybos projektas /","Construction project of shopping centre „YORI“ in Šiauliai."]}]}],"canonical_facts":{"dc:contributor":["Reizgevičius, Marius"],"dc:creator":["Žičkutė, Karolina,"],"dc:date":["2020"],"dc:description":["The thesis includes the projecting of the shopping center “YORI” which will be built in Serbentų street, Šiauliai. The building consists of two main functional areas: commercial and administrative space. Total building area is 1001,74 m2. The building is classified as a special purpose building. Bachelor's work consists of these following parts: 1. Architectural part – there is described building site plan, layout of rooms, construction decisions and engineering networks. In the drawings there are: plan of the plot, plans of the floors, building sections and facade. 2. Construction part – designed 18 m metallic truss SA-18, designed reinforced floor slab PP - 5.65. In the drawings there are given designed construction’s drawings. 3. Technological and economical part – there was made drilled foundation technological card, were selected major mechanisms, tools and described the necessary ground works, estimated works timetable, calculated quantities of the works."],"dc:format":["application/pdf"],"dc:identifier":["https://repository.vu.lt/VU:ELABAETD47441916&prefLang=en_US"],"dc:language":["lit"],"dc:publisher":["Institutional Repository of Vilnius University"],"dc:relation":["https://epublications.vu.lt/object/elaba:47441916/47441916.pdf"],"dc:rights":["info:eu-repo/semantics/openAccess"],"dc:subject":["Shopping centre ; hallow core slab ; metal truss ; local estimate."],"dc:title":["Prekybos centro „YORI“ Šiauliuose statybos projektas /","Construction project of shopping centre „YORI“ in Šiauliai."],"dc:type":["info:eu-repo/semantics/bachelorThesis"]},"updated_at":"2026-11-19T09:54:47Z"}