{"id":{"repo_id":"vt","oai_identifier":"oai:vtechworks.lib.vt.edu:10919/114400"},"canonical_url":"https://search.ndltd.org/etd/vt/oai:vtechworks.lib.vt.edu:10919/114400","repository":{"repo_id":"vt","name":"Virginia Tech","base_url":"https://vtechworks.lib.vt.edu/oai/request"},"display":{"title":"Effects of starting conditions and output data collection for simulation","abstract":"This research examines the simulation issues of starting conditions and performance measure data collection. These issues are discussed in the context of a specific production system simulation model. The production system modeled was a modified flow shop at the International Business Machines Corporation, Federal Systems Division, (IBM/FSD), Manassas, Virginia, manufacturing facility. Where appropriate, generalizations for other production system simulation models are made with regard to the arguments and methods used in: 1) the choice of an acceptable type of starting condition procedure for the IBM/FSD production system model, 2) the methodology used to determine the specific starting conditions to impose on the model, 3) the development of a heuristic, based on performance measure dependency, to determine if the model's data collection procedure should include performance measure data collection on the entities' effects over the simulation analysis period (planning horizon) as well as at its end, and 4) the data collection synthesis technique chosen for the model to satisfy the heuristic's recommendations.","abstract_html":"This research examines the simulation issues of starting conditions and performance measure data collection. These issues are discussed in the context of a specific production system simulation model. The production system modeled was a modified flow shop at the International Business Machines Corporation, Federal Systems Division, (IBM/FSD), Manassas, Virginia, manufacturing facility. Where appropriate, generalizations for other production system simulation models are made with regard to the arguments and methods used in: 1) the choice of an acceptable type of starting condition procedure for the IBM/FSD production system model, 2) the methodology used to determine the specific starting conditions to impose on the model, 3) the development of a heuristic, based on performance measure dependency, to determine if the model&#x27;s data collection procedure should include performance measure data collection on the entities&#x27; effects over the simulation analysis period (planning horizon) as well as at its end, and 4) the data collection synthesis technique chosen for the model to satisfy the heuristic&#x27;s recommendations.","abstract_has_math":false,"creators":["Abbott, Rebecca A."],"institution":"Virginia Polytechnic Institute and State University","degree_name":"M.S.","degree_level":"masters","degree_discipline":"Industrial Engineering and Operations Research","degree_department":"Industrial Engineering and Operations Research","school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":1983,"date_issued":"1983","date_published":"1983","updated_at":"2026-11-18T20:22:54Z","subjects":["Computer simulation"],"languages":["en"],"rights":["In Copyright"],"rights_urls":["http://rightsstatements.org/vocab/InC/1.0/"],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/10919/114400","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"http://hdl.handle.net/10919/114400","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://vtechworks.lib.vt.edu/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Avtechworks.lib.vt.edu%3A10919%2F114400","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.department","label":"Department","values":["Industrial Engineering and Operations Research"]},{"key":"dc:creator","label":"Author","values":["Abbott, Rebecca A."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2023-04-07T05:16:55Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2023-04-07T05:16:55Z"]},{"key":"dc:date.issued","label":"Date","values":["1983"]},{"key":"dc:publisher","label":"Institution","values":["Virginia Polytechnic Institute and State University"]},{"key":"dc:relation.isformatof","label":"Dc Relation Isformatof","values":["OCLC# 10381535"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"dc:type.dcmitype","label":"Dc Type Dcmitype","values":["Text"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Industrial Engineering and Operations Research"]},{"key":"thesis:degree_level","label":"Degree Level","values":["masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S."]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Virginia Polytechnic Institute and State University"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.lcc","label":"Dc Subject Lcc","values":["LD5655.V855 1983.A226"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Computer simulation"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["In Copyright"]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://rightsstatements.org/vocab/InC/1.0/"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/10919/114400"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This research examines the simulation issues of starting conditions and performance measure data collection. These issues are discussed in the context of a specific production system simulation model. The production system modeled was a modified flow shop at the International Business Machines Corporation, Federal Systems Division, (IBM/FSD), Manassas, Virginia, manufacturing facility. Where appropriate, generalizations for other production system simulation models are made with regard to the arguments and methods used in: 1) the choice of an acceptable type of starting condition procedure for the IBM/FSD production system model, 2) the methodology used to determine the specific starting conditions to impose on the model, 3) the development of a heuristic, based on performance measure dependency, to determine if the model's data collection procedure should include performance measure data collection on the entities' effects over the simulation analysis period (planning horizon) as well as at its end, and 4) the data collection synthesis technique chosen for the model to satisfy the heuristic's recommendations."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["M.S."]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["ix, 185 leaves"]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Effects of starting conditions and output data collection for simulation"]}]}],"canonical_facts":{"dc:contributor.department":["Industrial Engineering and Operations Research"],"dc:creator":["Abbott, Rebecca A."],"dc:date.accessioned":["2023-04-07T05:16:55Z"],"dc:date.available":["2023-04-07T05:16:55Z"],"dc:date.issued":["1983"],"dc:description.abstract":["This research examines the simulation issues of starting conditions and performance measure data collection. These issues are discussed in the context of a specific production system simulation model. The production system modeled was a modified flow shop at the International Business Machines Corporation, Federal Systems Division, (IBM/FSD), Manassas, Virginia, manufacturing facility. Where appropriate, generalizations for other production system simulation models are made with regard to the arguments and methods used in: 1) the choice of an acceptable type of starting condition procedure for the IBM/FSD production system model, 2) the methodology used to determine the specific starting conditions to impose on the model, 3) the development of a heuristic, based on performance measure dependency, to determine if the model's data collection procedure should include performance measure data collection on the entities' effects over the simulation analysis period (planning horizon) as well as at its end, and 4) the data collection synthesis technique chosen for the model to satisfy the heuristic's recommendations."],"dc:description.degree":["M.S."],"dc:format.extent":["ix, 185 leaves"],"dc:format.mimetype":["application/pdf"],"dc:identifier.uri":["http://hdl.handle.net/10919/114400"],"dc:language.iso":["en"],"dc:publisher":["Virginia Polytechnic Institute and State University"],"dc:relation.isformatof":["OCLC# 10381535"],"dc:rights":["In Copyright"],"dc:rights.uri":["http://rightsstatements.org/vocab/InC/1.0/"],"dc:subject.lcc":["LD5655.V855 1983.A226"],"dc:subject.lcsh":["Computer simulation"],"dc:title":["Effects of starting conditions and output data collection for simulation"],"dc:type":["Thesis"],"dc:type.dcmitype":["Text"],"thesis:degree_discipline":["Industrial Engineering and Operations Research"],"thesis:degree_level":["masters"],"thesis:degree_name":["M.S."],"thesis:institution_name":["Virginia Polytechnic Institute and State University"]},"updated_at":"2026-11-18T20:22:54Z"}