{"id":{"repo_id":"vt","oai_identifier":"oai:vtechworks.lib.vt.edu:10919/37683"},"canonical_url":"https://search.ndltd.org/etd/vt/oai:vtechworks.lib.vt.edu:10919/37683","repository":{"repo_id":"vt","name":"Virginia Tech","base_url":"https://vtechworks.lib.vt.edu/oai/request"},"display":{"title":"Scheduling optimal maintenance times for a system based on component reliabilities","abstract":"This dissertation extends the work done on single component maintenance planning to a multi-component series system. An attempt is made to develop a function which represents the expected cost rate (cost per unit time) of any maintenance plan. Three increasingly complex cases are considered. The first and simplest case assumes that the component is restored to an “as good as new” condition after a maintenance operation. The second case assumes that an occasional imperfect maintenance Operation may occur. During this period of time, the failure rate of the component is higher. Hence, the likelihood of a failure is greater until the component is properly maintained in a subsequent maintenance operation. The final case assumes that there is some deterioration in the component behavior even after a maintenance operation. Therefore, it is necessary to replace the system at some point in time. Models for all three cases are developed. Based on these models, cost rate functions are constructed. The cost rate functions reflect the cost rates of maintaining a component at a particular time. In addition, the savings obtained through the simultaneous maintenance of components is also accounted for in the cost rate functions. A series of approximations are made in order to make the cost rate functions mathematically tractable. Finally, an algorithmic procedure for optimizing the cost rate functions for all three cases is given.","abstract_html":"This dissertation extends the work done on single component maintenance planning to a multi-component series system. An attempt is made to develop a function which represents the expected cost rate (cost per unit time) of any maintenance plan. Three increasingly complex cases are considered. The first and simplest case assumes that the component is restored to an “as good as new” condition after a maintenance operation. The second case assumes that an occasional imperfect maintenance Operation may occur. During this period of time, the failure rate of the component is higher. Hence, the likelihood of a failure is greater until the component is properly maintained in a subsequent maintenance operation. The final case assumes that there is some deterioration in the component behavior even after a maintenance operation. Therefore, it is necessary to replace the system at some point in time. Models for all three cases are developed. Based on these models, cost rate functions are constructed. The cost rate functions reflect the cost rates of maintaining a component at a particular time. In addition, the savings obtained through the simultaneous maintenance of components is also accounted for in the cost rate functions. A series of approximations are made in order to make the cost rate functions mathematically tractable. Finally, an algorithmic procedure for optimizing the cost rate functions for all three cases is given.","abstract_has_math":false,"creators":["Rao, Naresh Krishna"],"institution":"Virginia Tech","degree_name":"Ph. D.","degree_level":"doctoral","degree_discipline":"Industrial Systems Engineering","degree_department":"Industrial Systems Engineering","school":null,"contributors":[],"advisors":[],"committee_chairs":["Nachlas, Joel A."],"committee_members":["Koelling, C. Patrick","Reynolds, Marion R. Jr.","Sherali, Hanif","White, Marshall S."],"year":1992,"date_issued":"1992","date_published":"1992","updated_at":"2026-11-18T20:13:39Z","subjects":["Maintainability (Engineering)","Maintenance","Principal components analysis"],"languages":["en"],"rights":["In Copyright"],"rights_urls":["http://rightsstatements.org/vocab/InC/1.0/"],"identifier_entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["etd-05042006-164506"],"render_values":[{"text":"etd-05042006-164506","href":null,"code":true}]},{"key":"dc:identifier.sourceurl","label":"Source URL","values":["http://scholar.lib.vt.edu/theses/available/etd-05042006-164506/"],"render_values":[{"text":"http://scholar.lib.vt.edu/theses/available/etd-05042006-164506/","href":"http://scholar.lib.vt.edu/theses/available/etd-05042006-164506/","code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/10919/37683","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"http://hdl.handle.net/10919/37683","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://vtechworks.lib.vt.edu/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Avtechworks.lib.vt.edu%3A10919%2F37683","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.committeechair","label":"Committee Chair","values":["Nachlas, Joel A."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Koelling, C. Patrick","Reynolds, Marion R. Jr.","Sherali, Hanif","White, Marshall S."]},{"key":"dc:contributor.department","label":"Department","values":["Industrial Systems Engineering"]},{"key":"dc:creator","label":"Author","values":["Rao, Naresh Krishna"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accepted","label":"Dc Date Accepted","values":["2006-05-04"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2014-03-14T21:10:39Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2014-03-14T21:10:39Z","2006-05-04"]},{"key":"dc:date.issued","label":"Date","values":["1992"]},{"key":"dc:date.submitted","label":"Dc Date Submitted","values":["2006-05-04"]},{"key":"dc:publisher","label":"Institution","values":["Virginia Tech"]},{"key":"dc:relation.haspart","label":"Dc Relation Haspart","values":["LD5655.V856_1992.R36.pdf"]},{"key":"dc:relation.isformatof","label":"Dc Relation Isformatof","values":["OCLC# 26247993"]},{"key":"dc:type","label":"Dc Type","values":["Dissertation"]},{"key":"dc:type.dcmitype","label":"Dc Type Dcmitype","values":["Text"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Industrial Systems Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["doctoral"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Ph. D."]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Virginia Polytechnic Institute and State University"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.lcc","label":"Dc Subject Lcc","values":["LD5655.V856 1992.R36"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Maintainability (Engineering)","Maintenance","Principal components analysis"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["In Copyright"]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://rightsstatements.org/vocab/InC/1.0/"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["etd-05042006-164506"]},{"key":"dc:identifier.sourceurl","label":"Source URL","values":["http://scholar.lib.vt.edu/theses/available/etd-05042006-164506/"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/10919/37683"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This dissertation extends the work done on single component maintenance planning to a multi-component series system. An attempt is made to develop a function which represents the expected cost rate (cost per unit time) of any maintenance plan. Three increasingly complex cases are considered. The first and simplest case assumes that the component is restored to an “as good as new” condition after a maintenance operation. The second case assumes that an occasional imperfect maintenance Operation may occur. During this period of time, the failure rate of the component is higher. Hence, the likelihood of a failure is greater until the component is properly maintained in a subsequent maintenance operation. The final case assumes that there is some deterioration in the component behavior even after a maintenance operation. Therefore, it is necessary to replace the system at some point in time. Models for all three cases are developed. Based on these models, cost rate functions are constructed. The cost rate functions reflect the cost rates of maintaining a component at a particular time. In addition, the savings obtained through the simultaneous maintenance of components is also accounted for in the cost rate functions. A series of approximations are made in order to make the cost rate functions mathematically tractable. Finally, an algorithmic procedure for optimizing the cost rate functions for all three cases is given."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["Ph. D."]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["xii, 142 leaves"]},{"key":"dc:format.medium","label":"Dc Format Medium","values":["BTD"]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Scheduling optimal maintenance times for a system based on component reliabilities"]}]}],"canonical_facts":{"dc:contributor.committeechair":["Nachlas, Joel A."],"dc:contributor.committeemember":["Koelling, C. Patrick","Reynolds, Marion R. Jr.","Sherali, Hanif","White, Marshall S."],"dc:contributor.department":["Industrial Systems Engineering"],"dc:creator":["Rao, Naresh Krishna"],"dc:date.accepted":["2006-05-04"],"dc:date.accessioned":["2014-03-14T21:10:39Z"],"dc:date.available":["2014-03-14T21:10:39Z","2006-05-04"],"dc:date.issued":["1992"],"dc:date.submitted":["2006-05-04"],"dc:description.abstract":["This dissertation extends the work done on single component maintenance planning to a multi-component series system. An attempt is made to develop a function which represents the expected cost rate (cost per unit time) of any maintenance plan. Three increasingly complex cases are considered. The first and simplest case assumes that the component is restored to an “as good as new” condition after a maintenance operation. The second case assumes that an occasional imperfect maintenance Operation may occur. During this period of time, the failure rate of the component is higher. Hence, the likelihood of a failure is greater until the component is properly maintained in a subsequent maintenance operation. The final case assumes that there is some deterioration in the component behavior even after a maintenance operation. Therefore, it is necessary to replace the system at some point in time. Models for all three cases are developed. Based on these models, cost rate functions are constructed. The cost rate functions reflect the cost rates of maintaining a component at a particular time. In addition, the savings obtained through the simultaneous maintenance of components is also accounted for in the cost rate functions. A series of approximations are made in order to make the cost rate functions mathematically tractable. Finally, an algorithmic procedure for optimizing the cost rate functions for all three cases is given."],"dc:description.degree":["Ph. D."],"dc:format.extent":["xii, 142 leaves"],"dc:format.medium":["BTD"],"dc:format.mimetype":["application/pdf"],"dc:identifier.other":["etd-05042006-164506"],"dc:identifier.sourceurl":["http://scholar.lib.vt.edu/theses/available/etd-05042006-164506/"],"dc:identifier.uri":["http://hdl.handle.net/10919/37683"],"dc:language.iso":["en"],"dc:publisher":["Virginia Tech"],"dc:relation.haspart":["LD5655.V856_1992.R36.pdf"],"dc:relation.isformatof":["OCLC# 26247993"],"dc:rights":["In Copyright"],"dc:rights.uri":["http://rightsstatements.org/vocab/InC/1.0/"],"dc:subject.lcc":["LD5655.V856 1992.R36"],"dc:subject.lcsh":["Maintainability (Engineering)","Maintenance","Principal components analysis"],"dc:title":["Scheduling optimal maintenance times for a system based on component reliabilities"],"dc:type":["Dissertation"],"dc:type.dcmitype":["Text"],"thesis:degree_discipline":["Industrial Systems Engineering"],"thesis:degree_level":["doctoral"],"thesis:degree_name":["Ph. D."],"thesis:institution_name":["Virginia Polytechnic Institute and State University"]},"updated_at":"2026-11-18T20:13:39Z"}