{"id":{"repo_id":"vt","oai_identifier":"oai:vtechworks.lib.vt.edu:10919/43778"},"canonical_url":"https://search.ndltd.org/etd/vt/oai:vtechworks.lib.vt.edu:10919/43778","repository":{"repo_id":"vt","name":"Virginia Tech","base_url":"https://vtechworks.lib.vt.edu/oai/request"},"display":{"title":"A computerized methodology for balancing and sequencing mixed model stochastic assembly lines","abstract":"A methodology for designing mixed model stochastic assembly line systems and a computer package to implement it for realistic problem sizes were developed. The methodology consists of three major steps: (1) generation of feasible sequences of feeding models into the line, (2) generation of feasible allocations (balances) of work elements to work stations, and (3) generation of combinations of sequences and allocations with the best ordering of elements within stations, calculation of total expected cost for each combination, and selection of the one with the least cost. For generating feasible balances, an exhaustive search procedure with a number of heuristic rules was used to ensure searching the whole feasible region in limited time. A cost model based on labor and incompletion costs is used to calculate the cost of each combination, and a recursive procedure to calculate incompletion probabilities for each element and incorporate them into the cost model was implemented. An example problem, its results, and the computer package listings are included.","abstract_html":"A methodology for designing mixed model stochastic assembly line systems and a computer package to implement it for realistic problem sizes were developed. The methodology consists of three major steps: (1) generation of feasible sequences of feeding models into the line, (2) generation of feasible allocations (balances) of work elements to work stations, and (3) generation of combinations of sequences and allocations with the best ordering of elements within stations, calculation of total expected cost for each combination, and selection of the one with the least cost. For generating feasible balances, an exhaustive search procedure with a number of heuristic rules was used to ensure searching the whole feasible region in limited time. A cost model based on labor and incompletion costs is used to calculate the cost of each combination, and a recursive procedure to calculate incompletion probabilities for each element and incorporate them into the cost model was implemented. An example problem, its results, and the computer package listings are included.","abstract_has_math":false,"creators":["Pantouvanos, John P."],"institution":"Virginia Tech","degree_name":"Master of Science","degree_level":"masters","degree_discipline":"Industrial and Systems Engineering","degree_department":"Industrial and Systems Engineering","school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":1992,"date_issued":"1992","date_published":"1992","updated_at":"2026-11-18T20:19:27Z","subjects":["Assembly-line balancing -- Mathematical models","Assembly-line methods -- Computer programs"],"languages":["en"],"rights":["In Copyright"],"rights_urls":["http://rightsstatements.org/vocab/InC/1.0/"],"identifier_entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["etd-07212009-040309"],"render_values":[{"text":"etd-07212009-040309","href":null,"code":true}]},{"key":"dc:identifier.sourceurl","label":"Source URL","values":["http://scholar.lib.vt.edu/theses/available/etd-07212009-040309/"],"render_values":[{"text":"http://scholar.lib.vt.edu/theses/available/etd-07212009-040309/","href":"http://scholar.lib.vt.edu/theses/available/etd-07212009-040309/","code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/10919/43778","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"http://hdl.handle.net/10919/43778","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://vtechworks.lib.vt.edu/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Avtechworks.lib.vt.edu%3A10919%2F43778","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.department","label":"Department","values":["Industrial and Systems Engineering"]},{"key":"dc:creator","label":"Author","values":["Pantouvanos, John P."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accepted","label":"Dc Date Accepted","values":["2009-07-21"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2014-03-14T21:40:38Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2014-03-14T21:40:38Z","2009-07-21"]},{"key":"dc:date.issued","label":"Date","values":["1992"]},{"key":"dc:date.submitted","label":"Dc Date Submitted","values":["2009-07-21"]},{"key":"dc:publisher","label":"Institution","values":["Virginia Tech"]},{"key":"dc:relation.haspart","label":"Dc Relation Haspart","values":["LD5655.V855_1992.P367.pdf"]},{"key":"dc:relation.isformatof","label":"Dc Relation Isformatof","values":["OCLC# 25753601"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"dc:type.dcmitype","label":"Dc Type Dcmitype","values":["Text"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Industrial and Systems Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Virginia Polytechnic Institute and State University"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.lcc","label":"Dc Subject Lcc","values":["LD5655.V855 1992.P367"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Assembly-line balancing -- Mathematical models","Assembly-line methods -- Computer programs"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["In Copyright"]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://rightsstatements.org/vocab/InC/1.0/"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["etd-07212009-040309"]},{"key":"dc:identifier.sourceurl","label":"Source URL","values":["http://scholar.lib.vt.edu/theses/available/etd-07212009-040309/"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/10919/43778"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["A methodology for designing mixed model stochastic assembly line systems and a computer package to implement it for realistic problem sizes were developed. The methodology consists of three major steps: (1) generation of feasible sequences of feeding models into the line, (2) generation of feasible allocations (balances) of work elements to work stations, and (3) generation of combinations of sequences and allocations with the best ordering of elements within stations, calculation of total expected cost for each combination, and selection of the one with the least cost. For generating feasible balances, an exhaustive search procedure with a number of heuristic rules was used to ensure searching the whole feasible region in limited time. A cost model based on labor and incompletion costs is used to calculate the cost of each combination, and a recursive procedure to calculate incompletion probabilities for each element and incorporate them into the cost model was implemented. An example problem, its results, and the computer package listings are included."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["Master of Science"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["ix, 97 leaves"]},{"key":"dc:format.medium","label":"Dc Format Medium","values":["BTD"]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["A computerized methodology for balancing and sequencing mixed model stochastic assembly lines"]}]}],"canonical_facts":{"dc:contributor.department":["Industrial and Systems Engineering"],"dc:creator":["Pantouvanos, John P."],"dc:date.accepted":["2009-07-21"],"dc:date.accessioned":["2014-03-14T21:40:38Z"],"dc:date.available":["2014-03-14T21:40:38Z","2009-07-21"],"dc:date.issued":["1992"],"dc:date.submitted":["2009-07-21"],"dc:description.abstract":["A methodology for designing mixed model stochastic assembly line systems and a computer package to implement it for realistic problem sizes were developed. The methodology consists of three major steps: (1) generation of feasible sequences of feeding models into the line, (2) generation of feasible allocations (balances) of work elements to work stations, and (3) generation of combinations of sequences and allocations with the best ordering of elements within stations, calculation of total expected cost for each combination, and selection of the one with the least cost. For generating feasible balances, an exhaustive search procedure with a number of heuristic rules was used to ensure searching the whole feasible region in limited time. A cost model based on labor and incompletion costs is used to calculate the cost of each combination, and a recursive procedure to calculate incompletion probabilities for each element and incorporate them into the cost model was implemented. An example problem, its results, and the computer package listings are included."],"dc:description.degree":["Master of Science"],"dc:format.extent":["ix, 97 leaves"],"dc:format.medium":["BTD"],"dc:format.mimetype":["application/pdf"],"dc:identifier.other":["etd-07212009-040309"],"dc:identifier.sourceurl":["http://scholar.lib.vt.edu/theses/available/etd-07212009-040309/"],"dc:identifier.uri":["http://hdl.handle.net/10919/43778"],"dc:language.iso":["en"],"dc:publisher":["Virginia Tech"],"dc:relation.haspart":["LD5655.V855_1992.P367.pdf"],"dc:relation.isformatof":["OCLC# 25753601"],"dc:rights":["In Copyright"],"dc:rights.uri":["http://rightsstatements.org/vocab/InC/1.0/"],"dc:subject.lcc":["LD5655.V855 1992.P367"],"dc:subject.lcsh":["Assembly-line balancing -- Mathematical models","Assembly-line methods -- Computer programs"],"dc:title":["A computerized methodology for balancing and sequencing mixed model stochastic assembly lines"],"dc:type":["Thesis"],"dc:type.dcmitype":["Text"],"thesis:degree_discipline":["Industrial and Systems Engineering"],"thesis:degree_level":["masters"],"thesis:degree_name":["Master of Science"],"thesis:institution_name":["Virginia Polytechnic Institute and State University"]},"updated_at":"2026-11-18T20:19:27Z"}