{"id":{"repo_id":"vt","oai_identifier":"oai:vtechworks.lib.vt.edu:10919/44119"},"canonical_url":"https://search.ndltd.org/etd/vt/oai:vtechworks.lib.vt.edu:10919/44119","repository":{"repo_id":"vt","name":"Virginia Tech","base_url":"https://vtechworks.lib.vt.edu/oai/request"},"display":{"title":"A model for colleges of engineering to select a strategic planning methodology and implement a strategic planning process","abstract":"This research operationalizes the theory and recommendations from academic and business strategic planning sources. The desired research outcome is to improve academic strategic planning for colleges of engineering. My contribution to the academic planning body of knowledge is a model to select a strategic planning methodology and implement a planning process for colleges of engineering. The model's design is based on the logical conclusion that choice of planning methodology should be matched to desired planning outcomes. The model uses a preplanning instrument, a planning template, and a Gantt Chart. I designed the preplanning instrument based on six success/fail criteria identified from the research, desired outcomes and outputs of the planning process, and selected planning steps from the Virginia Productivity Center (VPC) Planning Methodology. Answers to questions on the preplanning instrument are then summarized on the planning template. The template requires the planner to consider the sequence of the selected planning steps and prepare an agenda to accomplish them. Finally, the model requires the scheduling of this agenda on a Gantt Chart. The Gantt Chart becomes a timetable for a plan to plan for the college of engineering.","abstract_html":"This research operationalizes the theory and recommendations from academic and business strategic planning sources. The desired research outcome is to improve academic strategic planning for colleges of engineering. My contribution to the academic planning body of knowledge is a model to select a strategic planning methodology and implement a planning process for colleges of engineering. The model&#x27;s design is based on the logical conclusion that choice of planning methodology should be matched to desired planning outcomes. The model uses a preplanning instrument, a planning template, and a Gantt Chart. I designed the preplanning instrument based on six success/fail criteria identified from the research, desired outcomes and outputs of the planning process, and selected planning steps from the Virginia Productivity Center (VPC) Planning Methodology. Answers to questions on the preplanning instrument are then summarized on the planning template. The template requires the planner to consider the sequence of the selected planning steps and prepare an agenda to accomplish them. Finally, the model requires the scheduling of this agenda on a Gantt Chart. The Gantt Chart becomes a timetable for a plan to plan for the college of engineering.","abstract_has_math":false,"creators":["Kurstedt, Pamela S."],"institution":"Virginia Tech","degree_name":"Master of Science","degree_level":"masters","degree_discipline":"Industrial Engineering and Operations Research","degree_department":"Industrial Engineering and Operations Research","school":null,"contributors":[],"advisors":[],"committee_chairs":["Sink, D. Scott"],"committee_members":["Agee, Marvin H.","Torgersen, Paul E."],"year":1989,"date_issued":"1989-12-15","date_published":"1989-12-15","updated_at":"2026-11-18T20:03:53Z","subjects":["Engineering schools","Strategic planning"],"languages":["en"],"rights":["In Copyright"],"rights_urls":["http://rightsstatements.org/vocab/InC/1.0/"],"identifier_entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["etd-08012012-040606"],"render_values":[{"text":"etd-08012012-040606","href":null,"code":true}]},{"key":"dc:identifier.sourceurl","label":"Source URL","values":["http://scholar.lib.vt.edu/theses/available/etd-08012012-040606/"],"render_values":[{"text":"http://scholar.lib.vt.edu/theses/available/etd-08012012-040606/","href":"http://scholar.lib.vt.edu/theses/available/etd-08012012-040606/","code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/10919/44119","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"http://hdl.handle.net/10919/44119","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://vtechworks.lib.vt.edu/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Avtechworks.lib.vt.edu%3A10919%2F44119","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.committeechair","label":"Committee Chair","values":["Sink, D. Scott"]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Agee, Marvin H.","Torgersen, Paul E."]},{"key":"dc:contributor.department","label":"Department","values":["Industrial Engineering and Operations Research"]},{"key":"dc:creator","label":"Author","values":["Kurstedt, Pamela S."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accepted","label":"Dc Date Accepted","values":["2012-08-01"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2014-03-14T21:42:03Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2014-03-14T21:42:03Z","2012-08-01"]},{"key":"dc:date.issued","label":"Date","values":["1989-12-15"]},{"key":"dc:date.submitted","label":"Dc Date Submitted","values":["2012-08-01"]},{"key":"dc:publisher","label":"Institution","values":["Virginia Tech"]},{"key":"dc:relation.haspart","label":"Dc Relation Haspart","values":["LD5655.V855_1989.K875.pdf"]},{"key":"dc:relation.isformatof","label":"Dc Relation Isformatof","values":["OCLC# 21351980"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"dc:type.dcmitype","label":"Dc Type Dcmitype","values":["Text"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Industrial Engineering and Operations Research"]},{"key":"thesis:degree_level","label":"Degree Level","values":["masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Virginia Polytechnic Institute and State University"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.lcc","label":"Dc Subject Lcc","values":["LD5655.V855 1989.K875"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Engineering schools","Strategic planning"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["In Copyright"]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://rightsstatements.org/vocab/InC/1.0/"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["etd-08012012-040606"]},{"key":"dc:identifier.sourceurl","label":"Source URL","values":["http://scholar.lib.vt.edu/theses/available/etd-08012012-040606/"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/10919/44119"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This research operationalizes the theory and recommendations from academic and business strategic planning sources. The desired research outcome is to improve academic strategic planning for colleges of engineering. My contribution to the academic planning body of knowledge is a model to select a strategic planning methodology and implement a planning process for colleges of engineering. The model's design is based on the logical conclusion that choice of planning methodology should be matched to desired planning outcomes. The model uses a preplanning instrument, a planning template, and a Gantt Chart. I designed the preplanning instrument based on six success/fail criteria identified from the research, desired outcomes and outputs of the planning process, and selected planning steps from the Virginia Productivity Center (VPC) Planning Methodology. Answers to questions on the preplanning instrument are then summarized on the planning template. The template requires the planner to consider the sequence of the selected planning steps and prepare an agenda to accomplish them. Finally, the model requires the scheduling of this agenda on a Gantt Chart. The Gantt Chart becomes a timetable for a plan to plan for the college of engineering."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["Master of Science"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["xi, 132 leaves"]},{"key":"dc:format.medium","label":"Dc Format Medium","values":["BTD"]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["A model for colleges of engineering to select a strategic planning methodology and implement a strategic planning process"]}]}],"canonical_facts":{"dc:contributor.committeechair":["Sink, D. Scott"],"dc:contributor.committeemember":["Agee, Marvin H.","Torgersen, Paul E."],"dc:contributor.department":["Industrial Engineering and Operations Research"],"dc:creator":["Kurstedt, Pamela S."],"dc:date.accepted":["2012-08-01"],"dc:date.accessioned":["2014-03-14T21:42:03Z"],"dc:date.available":["2014-03-14T21:42:03Z","2012-08-01"],"dc:date.issued":["1989-12-15"],"dc:date.submitted":["2012-08-01"],"dc:description.abstract":["This research operationalizes the theory and recommendations from academic and business strategic planning sources. The desired research outcome is to improve academic strategic planning for colleges of engineering. My contribution to the academic planning body of knowledge is a model to select a strategic planning methodology and implement a planning process for colleges of engineering. The model's design is based on the logical conclusion that choice of planning methodology should be matched to desired planning outcomes. The model uses a preplanning instrument, a planning template, and a Gantt Chart. I designed the preplanning instrument based on six success/fail criteria identified from the research, desired outcomes and outputs of the planning process, and selected planning steps from the Virginia Productivity Center (VPC) Planning Methodology. Answers to questions on the preplanning instrument are then summarized on the planning template. The template requires the planner to consider the sequence of the selected planning steps and prepare an agenda to accomplish them. Finally, the model requires the scheduling of this agenda on a Gantt Chart. The Gantt Chart becomes a timetable for a plan to plan for the college of engineering."],"dc:description.degree":["Master of Science"],"dc:format.extent":["xi, 132 leaves"],"dc:format.medium":["BTD"],"dc:format.mimetype":["application/pdf"],"dc:identifier.other":["etd-08012012-040606"],"dc:identifier.sourceurl":["http://scholar.lib.vt.edu/theses/available/etd-08012012-040606/"],"dc:identifier.uri":["http://hdl.handle.net/10919/44119"],"dc:language.iso":["en"],"dc:publisher":["Virginia Tech"],"dc:relation.haspart":["LD5655.V855_1989.K875.pdf"],"dc:relation.isformatof":["OCLC# 21351980"],"dc:rights":["In Copyright"],"dc:rights.uri":["http://rightsstatements.org/vocab/InC/1.0/"],"dc:subject.lcc":["LD5655.V855 1989.K875"],"dc:subject.lcsh":["Engineering schools","Strategic planning"],"dc:title":["A model for colleges of engineering to select a strategic planning methodology and implement a strategic planning process"],"dc:type":["Thesis"],"dc:type.dcmitype":["Text"],"thesis:degree_discipline":["Industrial Engineering and Operations Research"],"thesis:degree_level":["masters"],"thesis:degree_name":["Master of Science"],"thesis:institution_name":["Virginia Polytechnic Institute and State University"]},"updated_at":"2026-11-18T20:03:53Z"}