{"id":{"repo_id":"vt","oai_identifier":"oai:vtechworks.lib.vt.edu:10919/45640"},"canonical_url":"https://search.ndltd.org/etd/vt/oai:vtechworks.lib.vt.edu:10919/45640","repository":{"repo_id":"vt","name":"Virginia Tech","base_url":"https://vtechworks.lib.vt.edu/oai/request"},"display":{"title":"Selection of an optimal set of assembly part delivery dates in a stochastic assembly system","abstract":"The scheduling of material requirements at a factory to maximize profits.or productivity is a difficult mathematical problem. The stochastic nature of most production setups introduces additional complications as a result of the uncertainty involved in vendor reliability and processing times. But in developing the descriptive model for a system, a true representation can only be attained if the variability of these elements is considered. Here we present the development of a normative model based on a new type of descriptive model which considers the element of stochasticity. The arrival time of an assembly part from a vendor is considered to be a normally distributed random variable. We attempt to optimize the system with regard to work-in-process inventory using a dynamic programming algorithm in combination with a heuristic procedure. The decision variable is the prescribed assembly part delivery date. The model is particularly suitable for application in low volume assembly lines, where products are manufactured in discrete batches.","abstract_html":"The scheduling of material requirements at a factory to maximize profits.or productivity is a difficult mathematical problem. The stochastic nature of most production setups introduces additional complications as a result of the uncertainty involved in vendor reliability and processing times. But in developing the descriptive model for a system, a true representation can only be attained if the variability of these elements is considered. Here we present the development of a normative model based on a new type of descriptive model which considers the element of stochasticity. The arrival time of an assembly part from a vendor is considered to be a normally distributed random variable. We attempt to optimize the system with regard to work-in-process inventory using a dynamic programming algorithm in combination with a heuristic procedure. The decision variable is the prescribed assembly part delivery date. The model is particularly suitable for application in low volume assembly lines, where products are manufactured in discrete batches.","abstract_has_math":false,"creators":["Das, Sanchoy K."],"institution":"Virginia Tech","degree_name":"Master of Science","degree_level":"masters","degree_discipline":"Industrial Engineering and Operations Research","degree_department":"Industrial Engineering and Operations Research","school":null,"contributors":[],"advisors":[],"committee_chairs":["Sarin, Subhash C."],"committee_members":["Malmborg, Charles J.","Sherali, Hanif D."],"year":1985,"date_issued":"1985-06-05","date_published":"1985-06-05","updated_at":"2026-11-18T20:21:42Z","subjects":["Assembly-line balancing","Production planning","Production scheduling","Stochastic systems"],"languages":[],"rights":["In Copyright"],"rights_urls":["http://rightsstatements.org/vocab/InC/1.0/"],"identifier_entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["etd-11142012-040019"],"render_values":[{"text":"etd-11142012-040019","href":null,"code":true}]},{"key":"dc:identifier.sourceurl","label":"Source URL","values":["http://scholar.lib.vt.edu/theses/available/etd-11142012-040019/"],"render_values":[{"text":"http://scholar.lib.vt.edu/theses/available/etd-11142012-040019/","href":"http://scholar.lib.vt.edu/theses/available/etd-11142012-040019/","code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/10919/45640","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"http://hdl.handle.net/10919/45640","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://vtechworks.lib.vt.edu/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Avtechworks.lib.vt.edu%3A10919%2F45640","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.committeechair","label":"Committee Chair","values":["Sarin, Subhash C."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Malmborg, Charles J.","Sherali, Hanif D."]},{"key":"dc:contributor.department","label":"Department","values":["Industrial Engineering and Operations Research"]},{"key":"dc:creator","label":"Author","values":["Das, Sanchoy K."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accepted","label":"Dc Date Accepted","values":["2012-11-14"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2014-03-14T21:49:31Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2014-03-14T21:49:31Z","2012-11-14"]},{"key":"dc:date.issued","label":"Date","values":["1985-06-05"]},{"key":"dc:date.submitted","label":"Dc Date Submitted","values":["2012-11-14"]},{"key":"dc:publisher","label":"Institution","values":["Virginia Tech"]},{"key":"dc:relation.haspart","label":"Dc Relation Haspart","values":["LD5655.V855_1985.D37.pdf"]},{"key":"dc:relation.isformatof","label":"Dc Relation Isformatof","values":["OCLC# 12740070"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"dc:type.dcmitype","label":"Dc Type Dcmitype","values":["Text"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Industrial Engineering and Operations Research"]},{"key":"thesis:degree_level","label":"Degree Level","values":["masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Virginia Polytechnic Institute and State University"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.lcc","label":"Dc Subject Lcc","values":["LD5655.V855 1985.D37"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Assembly-line balancing","Production planning","Production scheduling","Stochastic systems"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["In Copyright"]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://rightsstatements.org/vocab/InC/1.0/"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["etd-11142012-040019"]},{"key":"dc:identifier.sourceurl","label":"Source URL","values":["http://scholar.lib.vt.edu/theses/available/etd-11142012-040019/"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/10919/45640"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The scheduling of material requirements at a factory to maximize profits.or productivity is a difficult mathematical problem. The stochastic nature of most production setups introduces additional complications as a result of the uncertainty involved in vendor reliability and processing times. But in developing the descriptive model for a system, a true representation can only be attained if the variability of these elements is considered. Here we present the development of a normative model based on a new type of descriptive model which considers the element of stochasticity. The arrival time of an assembly part from a vendor is considered to be a normally distributed random variable. We attempt to optimize the system with regard to work-in-process inventory using a dynamic programming algorithm in combination with a heuristic procedure. The decision variable is the prescribed assembly part delivery date. The model is particularly suitable for application in low volume assembly lines, where products are manufactured in discrete batches."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["Master of Science"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["viii, 126 leaves"]},{"key":"dc:format.medium","label":"Dc Format Medium","values":["BTD"]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Selection of an optimal set of assembly part delivery dates in a stochastic assembly system"]}]}],"canonical_facts":{"dc:contributor.committeechair":["Sarin, Subhash C."],"dc:contributor.committeemember":["Malmborg, Charles J.","Sherali, Hanif D."],"dc:contributor.department":["Industrial Engineering and Operations Research"],"dc:creator":["Das, Sanchoy K."],"dc:date.accepted":["2012-11-14"],"dc:date.accessioned":["2014-03-14T21:49:31Z"],"dc:date.available":["2014-03-14T21:49:31Z","2012-11-14"],"dc:date.issued":["1985-06-05"],"dc:date.submitted":["2012-11-14"],"dc:description.abstract":["The scheduling of material requirements at a factory to maximize profits.or productivity is a difficult mathematical problem. The stochastic nature of most production setups introduces additional complications as a result of the uncertainty involved in vendor reliability and processing times. But in developing the descriptive model for a system, a true representation can only be attained if the variability of these elements is considered. Here we present the development of a normative model based on a new type of descriptive model which considers the element of stochasticity. The arrival time of an assembly part from a vendor is considered to be a normally distributed random variable. We attempt to optimize the system with regard to work-in-process inventory using a dynamic programming algorithm in combination with a heuristic procedure. The decision variable is the prescribed assembly part delivery date. The model is particularly suitable for application in low volume assembly lines, where products are manufactured in discrete batches."],"dc:description.degree":["Master of Science"],"dc:format.extent":["viii, 126 leaves"],"dc:format.medium":["BTD"],"dc:format.mimetype":["application/pdf"],"dc:identifier.other":["etd-11142012-040019"],"dc:identifier.sourceurl":["http://scholar.lib.vt.edu/theses/available/etd-11142012-040019/"],"dc:identifier.uri":["http://hdl.handle.net/10919/45640"],"dc:publisher":["Virginia Tech"],"dc:relation.haspart":["LD5655.V855_1985.D37.pdf"],"dc:relation.isformatof":["OCLC# 12740070"],"dc:rights":["In Copyright"],"dc:rights.uri":["http://rightsstatements.org/vocab/InC/1.0/"],"dc:subject.lcc":["LD5655.V855 1985.D37"],"dc:subject.lcsh":["Assembly-line balancing","Production planning","Production scheduling","Stochastic systems"],"dc:title":["Selection of an optimal set of assembly part delivery dates in a stochastic assembly system"],"dc:type":["Thesis"],"dc:type.dcmitype":["Text"],"thesis:degree_discipline":["Industrial Engineering and Operations Research"],"thesis:degree_level":["masters"],"thesis:degree_name":["Master of Science"],"thesis:institution_name":["Virginia Polytechnic Institute and State University"]},"updated_at":"2026-11-18T20:21:42Z"}