{"id":{"repo_id":"vt","oai_identifier":"oai:vtechworks.lib.vt.edu:10919/45684"},"canonical_url":"https://search.ndltd.org/etd/vt/oai:vtechworks.lib.vt.edu:10919/45684","repository":{"repo_id":"vt","name":"Virginia Tech","base_url":"https://vtechworks.lib.vt.edu/oai/request"},"display":{"title":"Leadtime estimation in a manufacturing shop environment","abstract":"This research examines the relationships between the independent variables; lot size, sequencing rule, and shop type/product mix and the â dependent variables; work-in-process, machine utilization, flowtime, and leadtime. These relationships have seldom been investigated by academicians. There is no satisfactory method available in the literature today that can be used to accurately estimate leadtime. This research developed methods for leadtime estimation. A leadtime estimation method would be invaluable to the production planner, for it would enable the person to decide when the job should be released to the shop. The experimental system considered in this research is an eight machine shop. Three different shop types, a jobshop, modified flowshop, and a flowshop, were modelled. Each shop type had eight different product types being manufactured. Two different sequencing rules, SPT and FIFO, were used. The entire system was analyzed via simulation on an IBM P.C. using SIMAN system simulation concepts.","abstract_html":"This research examines the relationships between the independent variables; lot size, sequencing rule, and shop type/product mix and the â dependent variables; work-in-process, machine utilization, flowtime, and leadtime. These relationships have seldom been investigated by academicians. There is no satisfactory method available in the literature today that can be used to accurately estimate leadtime. This research developed methods for leadtime estimation. A leadtime estimation method would be invaluable to the production planner, for it would enable the person to decide when the job should be released to the shop. The experimental system considered in this research is an eight machine shop. Three different shop types, a jobshop, modified flowshop, and a flowshop, were modelled. Each shop type had eight different product types being manufactured. Two different sequencing rules, SPT and FIFO, were used. The entire system was analyzed via simulation on an IBM P.C. using SIMAN system simulation concepts.","abstract_has_math":false,"creators":["Srihari, Krishnaswami"],"institution":"Virginia Tech","degree_name":"Master of Science","degree_level":"masters","degree_discipline":"Industrial Engineering and Operations Research","degree_department":"Industrial Engineering and Operations Research","school":null,"contributors":[],"advisors":[],"committee_chairs":["Greene, Timothy J."],"committee_members":["Fabrycky, Wolter J.","Jones, Marilyn S."],"year":1985,"date_issued":"1985-06-15","date_published":"1985-06-15","updated_at":"2026-11-18T20:19:01Z","subjects":["Manufacturing processes","Production management","Production planning","Production scheduling"],"languages":[],"rights":["In Copyright"],"rights_urls":["http://rightsstatements.org/vocab/InC/1.0/"],"identifier_entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["etd-11142012-040325"],"render_values":[{"text":"etd-11142012-040325","href":null,"code":true}]},{"key":"dc:identifier.sourceurl","label":"Source URL","values":["http://scholar.lib.vt.edu/theses/available/etd-11142012-040325/"],"render_values":[{"text":"http://scholar.lib.vt.edu/theses/available/etd-11142012-040325/","href":"http://scholar.lib.vt.edu/theses/available/etd-11142012-040325/","code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/10919/45684","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"http://hdl.handle.net/10919/45684","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://vtechworks.lib.vt.edu/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Avtechworks.lib.vt.edu%3A10919%2F45684","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.committeechair","label":"Committee Chair","values":["Greene, Timothy J."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Fabrycky, Wolter J.","Jones, Marilyn S."]},{"key":"dc:contributor.department","label":"Department","values":["Industrial Engineering and Operations Research"]},{"key":"dc:creator","label":"Author","values":["Srihari, Krishnaswami"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accepted","label":"Dc Date Accepted","values":["2012-11-14"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2014-03-14T21:49:38Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2014-03-14T21:49:38Z","2012-11-14"]},{"key":"dc:date.issued","label":"Date","values":["1985-06-15"]},{"key":"dc:date.submitted","label":"Dc Date Submitted","values":["2012-11-14"]},{"key":"dc:publisher","label":"Institution","values":["Virginia Tech"]},{"key":"dc:relation.haspart","label":"Dc Relation Haspart","values":["LD5655.V855_1985.S743.pdf"]},{"key":"dc:relation.isformatof","label":"Dc Relation Isformatof","values":["OCLC# 12984473"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"dc:type.dcmitype","label":"Dc Type Dcmitype","values":["Text"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Industrial Engineering and Operations Research"]},{"key":"thesis:degree_level","label":"Degree Level","values":["masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Virginia Polytechnic Institute and State University"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.lcc","label":"Dc Subject Lcc","values":["LD5655.V855 1985.S743"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Manufacturing processes","Production management","Production planning","Production scheduling"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["In Copyright"]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://rightsstatements.org/vocab/InC/1.0/"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["etd-11142012-040325"]},{"key":"dc:identifier.sourceurl","label":"Source URL","values":["http://scholar.lib.vt.edu/theses/available/etd-11142012-040325/"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/10919/45684"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This research examines the relationships between the independent variables; lot size, sequencing rule, and shop type/product mix and the â dependent variables; work-in-process, machine utilization, flowtime, and leadtime. These relationships have seldom been investigated by academicians. There is no satisfactory method available in the literature today that can be used to accurately estimate leadtime. This research developed methods for leadtime estimation. A leadtime estimation method would be invaluable to the production planner, for it would enable the person to decide when the job should be released to the shop. The experimental system considered in this research is an eight machine shop. Three different shop types, a jobshop, modified flowshop, and a flowshop, were modelled. Each shop type had eight different product types being manufactured. Two different sequencing rules, SPT and FIFO, were used. The entire system was analyzed via simulation on an IBM P.C. using SIMAN system simulation concepts."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["Master of Science"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["viii, 100 leaves"]},{"key":"dc:format.medium","label":"Dc Format Medium","values":["BTD"]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Leadtime estimation in a manufacturing shop environment"]}]}],"canonical_facts":{"dc:contributor.committeechair":["Greene, Timothy J."],"dc:contributor.committeemember":["Fabrycky, Wolter J.","Jones, Marilyn S."],"dc:contributor.department":["Industrial Engineering and Operations Research"],"dc:creator":["Srihari, Krishnaswami"],"dc:date.accepted":["2012-11-14"],"dc:date.accessioned":["2014-03-14T21:49:38Z"],"dc:date.available":["2014-03-14T21:49:38Z","2012-11-14"],"dc:date.issued":["1985-06-15"],"dc:date.submitted":["2012-11-14"],"dc:description.abstract":["This research examines the relationships between the independent variables; lot size, sequencing rule, and shop type/product mix and the â dependent variables; work-in-process, machine utilization, flowtime, and leadtime. These relationships have seldom been investigated by academicians. There is no satisfactory method available in the literature today that can be used to accurately estimate leadtime. This research developed methods for leadtime estimation. A leadtime estimation method would be invaluable to the production planner, for it would enable the person to decide when the job should be released to the shop. The experimental system considered in this research is an eight machine shop. Three different shop types, a jobshop, modified flowshop, and a flowshop, were modelled. Each shop type had eight different product types being manufactured. Two different sequencing rules, SPT and FIFO, were used. The entire system was analyzed via simulation on an IBM P.C. using SIMAN system simulation concepts."],"dc:description.degree":["Master of Science"],"dc:format.extent":["viii, 100 leaves"],"dc:format.medium":["BTD"],"dc:format.mimetype":["application/pdf"],"dc:identifier.other":["etd-11142012-040325"],"dc:identifier.sourceurl":["http://scholar.lib.vt.edu/theses/available/etd-11142012-040325/"],"dc:identifier.uri":["http://hdl.handle.net/10919/45684"],"dc:publisher":["Virginia Tech"],"dc:relation.haspart":["LD5655.V855_1985.S743.pdf"],"dc:relation.isformatof":["OCLC# 12984473"],"dc:rights":["In Copyright"],"dc:rights.uri":["http://rightsstatements.org/vocab/InC/1.0/"],"dc:subject.lcc":["LD5655.V855 1985.S743"],"dc:subject.lcsh":["Manufacturing processes","Production management","Production planning","Production scheduling"],"dc:title":["Leadtime estimation in a manufacturing shop environment"],"dc:type":["Thesis"],"dc:type.dcmitype":["Text"],"thesis:degree_discipline":["Industrial Engineering and Operations Research"],"thesis:degree_level":["masters"],"thesis:degree_name":["Master of Science"],"thesis:institution_name":["Virginia Polytechnic Institute and State University"]},"updated_at":"2026-11-18T20:19:01Z"}