{"id":{"repo_id":"vt","oai_identifier":"oai:vtechworks.lib.vt.edu:10919/74678"},"canonical_url":"https://search.ndltd.org/etd/vt/oai:vtechworks.lib.vt.edu:10919/74678","repository":{"repo_id":"vt","name":"Virginia Tech","base_url":"https://vtechworks.lib.vt.edu/oai/request"},"display":{"title":"An evaluation of scheduling policies in a dual resource constrained assembly shop","abstract":"Research in job shop scheduling has concentrated on sequencing simple, single component jobs that require no coordination of multiple parts for assembly. However, since most jobs in reality involve some assembly work, scheduling multiple component jobs through an assembly shop, where both serial and parallel operations take place, represents a more realistic and practical problem. The scheduling environment for multiple component jobs in terms of routing, sequencing, and the pacing of common components may be quite complex, and, as such, requires special scheduling considerations. The purpose of this research is to evaluate scheduling policies for the production of assembled products in a job shop environment, termed \"assembly shop\". The specific scheduling policies examined include duedate assignment procedures, labor assignment procedures, and item sequencing rules. The sensitivity of these policies to product structure is also addressed.","abstract_html":"Research in job shop scheduling has concentrated on sequencing simple, single component jobs that require no coordination of multiple parts for assembly. However, since most jobs in reality involve some assembly work, scheduling multiple component jobs through an assembly shop, where both serial and parallel operations take place, represents a more realistic and practical problem. The scheduling environment for multiple component jobs in terms of routing, sequencing, and the pacing of common components may be quite complex, and, as such, requires special scheduling considerations. The purpose of this research is to evaluate scheduling policies for the production of assembled products in a job shop environment, termed &quot;assembly shop&quot;. The specific scheduling policies examined include duedate assignment procedures, labor assignment procedures, and item sequencing rules. The sensitivity of these policies to product structure is also addressed.","abstract_has_math":false,"creators":["Russell, Roberta S."],"institution":"Virginia Polytechnic Institute and State University","degree_name":"Ph. D.","degree_level":"doctoral","degree_discipline":"Business","degree_department":"Business","school":null,"contributors":[],"advisors":[],"committee_chairs":["Taylor, Bernard W. III"],"committee_members":["Tanchoco, J. M. A.","Huang, Philip Y.","Moore, Laurence J.","Wysk, R. A."],"year":1983,"date_issued":"1983","date_published":"1983","updated_at":"2026-11-18T20:12:57Z","subjects":["Production scheduling"],"languages":["en_US"],"rights":["In Copyright"],"rights_urls":["http://rightsstatements.org/vocab/InC/1.0/"],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/10919/74678","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"http://hdl.handle.net/10919/74678","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://vtechworks.lib.vt.edu/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Avtechworks.lib.vt.edu%3A10919%2F74678","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.committeechair","label":"Committee Chair","values":["Taylor, Bernard W. III"]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Tanchoco, J. M. A.","Huang, Philip Y.","Moore, Laurence J.","Wysk, R. A."]},{"key":"dc:contributor.department","label":"Department","values":["Business"]},{"key":"dc:creator","label":"Author","values":["Russell, Roberta S."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2017-01-30T21:23:43Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2017-01-30T21:23:43Z"]},{"key":"dc:date.issued","label":"Date","values":["1983"]},{"key":"dc:publisher","label":"Institution","values":["Virginia Polytechnic Institute and State University"]},{"key":"dc:relation.isformatof","label":"Dc Relation Isformatof","values":["OCLC# 10656739"]},{"key":"dc:type","label":"Dc Type","values":["Dissertation"]},{"key":"dc:type.dcmitype","label":"Dc Type Dcmitype","values":["Text"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Business"]},{"key":"thesis:degree_level","label":"Degree Level","values":["doctoral"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Ph. D."]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Virginia Polytechnic Institute and State University"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.lcc","label":"Dc Subject Lcc","values":["LD5655.V856 1983.R888"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Production scheduling"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en_US"]},{"key":"dc:rights","label":"Dc Rights","values":["In Copyright"]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://rightsstatements.org/vocab/InC/1.0/"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/10919/74678"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Research in job shop scheduling has concentrated on sequencing simple, single component jobs that require no coordination of multiple parts for assembly. However, since most jobs in reality involve some assembly work, scheduling multiple component jobs through an assembly shop, where both serial and parallel operations take place, represents a more realistic and practical problem. The scheduling environment for multiple component jobs in terms of routing, sequencing, and the pacing of common components may be quite complex, and, as such, requires special scheduling considerations. The purpose of this research is to evaluate scheduling policies for the production of assembled products in a job shop environment, termed \"assembly shop\". The specific scheduling policies examined include duedate assignment procedures, labor assignment procedures, and item sequencing rules. The sensitivity of these policies to product structure is also addressed."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["Ph. D."]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["xi, 234 leaves"]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["An evaluation of scheduling policies in a dual resource constrained assembly shop"]}]}],"canonical_facts":{"dc:contributor.committeechair":["Taylor, Bernard W. III"],"dc:contributor.committeemember":["Tanchoco, J. M. A.","Huang, Philip Y.","Moore, Laurence J.","Wysk, R. A."],"dc:contributor.department":["Business"],"dc:creator":["Russell, Roberta S."],"dc:date.accessioned":["2017-01-30T21:23:43Z"],"dc:date.available":["2017-01-30T21:23:43Z"],"dc:date.issued":["1983"],"dc:description.abstract":["Research in job shop scheduling has concentrated on sequencing simple, single component jobs that require no coordination of multiple parts for assembly. However, since most jobs in reality involve some assembly work, scheduling multiple component jobs through an assembly shop, where both serial and parallel operations take place, represents a more realistic and practical problem. The scheduling environment for multiple component jobs in terms of routing, sequencing, and the pacing of common components may be quite complex, and, as such, requires special scheduling considerations. The purpose of this research is to evaluate scheduling policies for the production of assembled products in a job shop environment, termed \"assembly shop\". The specific scheduling policies examined include duedate assignment procedures, labor assignment procedures, and item sequencing rules. The sensitivity of these policies to product structure is also addressed."],"dc:description.degree":["Ph. D."],"dc:format.extent":["xi, 234 leaves"],"dc:format.mimetype":["application/pdf"],"dc:identifier.uri":["http://hdl.handle.net/10919/74678"],"dc:language.iso":["en_US"],"dc:publisher":["Virginia Polytechnic Institute and State University"],"dc:relation.isformatof":["OCLC# 10656739"],"dc:rights":["In Copyright"],"dc:rights.uri":["http://rightsstatements.org/vocab/InC/1.0/"],"dc:subject.lcc":["LD5655.V856 1983.R888"],"dc:subject.lcsh":["Production scheduling"],"dc:title":["An evaluation of scheduling policies in a dual resource constrained assembly shop"],"dc:type":["Dissertation"],"dc:type.dcmitype":["Text"],"thesis:degree_discipline":["Business"],"thesis:degree_level":["doctoral"],"thesis:degree_name":["Ph. D."],"thesis:institution_name":["Virginia Polytechnic Institute and State University"]},"updated_at":"2026-11-18T20:12:57Z"}