{"id":{"repo_id":"vt","oai_identifier":"oai:vtechworks.lib.vt.edu:10919/94487"},"canonical_url":"https://search.ndltd.org/etd/vt/oai:vtechworks.lib.vt.edu:10919/94487","repository":{"repo_id":"vt","name":"Virginia Tech","base_url":"https://vtechworks.lib.vt.edu/oai/request"},"display":{"title":"Determining the most appropiate [sic] sampling interval for a Shewhart X-chart","abstract":"A common problem encountered in practice is determining when it is appropriate to change the sampling interval for control charts. This thesis examines this problem for Shewhart X̅ charts. Duncan's economic model (1956) is used to develop a relationship between the most appropriate sampling interval and the present rate of\"disturbances,” where a disturbance is a shift to an out of control state. A procedure is proposed which switches the interval to convenient values whenever a shift in the rate of disturbances is detected. An example using simulation demonstrates the procedure.","abstract_html":"A common problem encountered in practice is determining when it is appropriate to change the sampling interval for control charts. This thesis examines this problem for Shewhart X̅ charts. Duncan&#x27;s economic model (1956) is used to develop a relationship between the most appropriate sampling interval and the present rate of&quot;disturbances,” where a disturbance is a shift to an out of control state. A procedure is proposed which switches the interval to convenient values whenever a shift in the rate of disturbances is detected. An example using simulation demonstrates the procedure.","abstract_has_math":false,"creators":["Vining, G. Geoffrey"],"institution":"Virginia Polytechnic Institute and State University","degree_name":"M.S.","degree_level":"masters","degree_discipline":"Statistics","degree_department":"Statistics","school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":1986,"date_issued":"1986","date_published":"1986","updated_at":"2026-11-18T20:10:58Z","subjects":["Quality control -- Charts, diagrams, etc","Quality control -- Statistical methods","Sampling (Statistics)","Statistics -- Charts, diagrams, etc"],"languages":["en"],"rights":["In Copyright"],"rights_urls":["http://rightsstatements.org/vocab/InC/1.0/"],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/10919/94487","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"http://hdl.handle.net/10919/94487","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://vtechworks.lib.vt.edu/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Avtechworks.lib.vt.edu%3A10919%2F94487","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.department","label":"Department","values":["Statistics"]},{"key":"dc:creator","label":"Author","values":["Vining, G. Geoffrey"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2019-10-10T19:12:03Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2019-10-10T19:12:03Z"]},{"key":"dc:date.issued","label":"Date","values":["1986"]},{"key":"dc:publisher","label":"Institution","values":["Virginia Polytechnic Institute and State University"]},{"key":"dc:relation.isformatof","label":"Dc Relation Isformatof","values":["OCLC# 15715962"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"dc:type.dcmitype","label":"Dc Type Dcmitype","values":["Text"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Statistics"]},{"key":"thesis:degree_level","label":"Degree Level","values":["masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S."]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Virginia Polytechnic Institute and State University"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.lcc","label":"Dc Subject Lcc","values":["LD5655.V855 1986.V564"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Quality control -- Charts, diagrams, etc","Quality control -- Statistical methods","Sampling (Statistics)","Statistics -- Charts, diagrams, etc"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["In Copyright"]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://rightsstatements.org/vocab/InC/1.0/"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/10919/94487"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["A common problem encountered in practice is determining when it is appropriate to change the sampling interval for control charts. This thesis examines this problem for Shewhart X̅ charts. Duncan's economic model (1956) is used to develop a relationship between the most appropriate sampling interval and the present rate of\"disturbances,” where a disturbance is a shift to an out of control state. A procedure is proposed which switches the interval to convenient values whenever a shift in the rate of disturbances is detected. An example using simulation demonstrates the procedure."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["M.S."]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["vii, 66 leaves"]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Determining the most appropiate [sic] sampling interval for a Shewhart X-chart"]}]}],"canonical_facts":{"dc:contributor.department":["Statistics"],"dc:creator":["Vining, G. Geoffrey"],"dc:date.accessioned":["2019-10-10T19:12:03Z"],"dc:date.available":["2019-10-10T19:12:03Z"],"dc:date.issued":["1986"],"dc:description.abstract":["A common problem encountered in practice is determining when it is appropriate to change the sampling interval for control charts. This thesis examines this problem for Shewhart X̅ charts. Duncan's economic model (1956) is used to develop a relationship between the most appropriate sampling interval and the present rate of\"disturbances,” where a disturbance is a shift to an out of control state. A procedure is proposed which switches the interval to convenient values whenever a shift in the rate of disturbances is detected. An example using simulation demonstrates the procedure."],"dc:description.degree":["M.S."],"dc:format.extent":["vii, 66 leaves"],"dc:format.mimetype":["application/pdf"],"dc:identifier.uri":["http://hdl.handle.net/10919/94487"],"dc:language.iso":["en"],"dc:publisher":["Virginia Polytechnic Institute and State University"],"dc:relation.isformatof":["OCLC# 15715962"],"dc:rights":["In Copyright"],"dc:rights.uri":["http://rightsstatements.org/vocab/InC/1.0/"],"dc:subject.lcc":["LD5655.V855 1986.V564"],"dc:subject.lcsh":["Quality control -- Charts, diagrams, etc","Quality control -- Statistical methods","Sampling (Statistics)","Statistics -- Charts, diagrams, etc"],"dc:title":["Determining the most appropiate [sic] sampling interval for a Shewhart X-chart"],"dc:type":["Thesis"],"dc:type.dcmitype":["Text"],"thesis:degree_discipline":["Statistics"],"thesis:degree_level":["masters"],"thesis:degree_name":["M.S."],"thesis:institution_name":["Virginia Polytechnic Institute and State University"]},"updated_at":"2026-11-18T20:10:58Z"}