{"id":{"repo_id":"washington","oai_identifier":"oai:digital.lib.washington.edu:1773/44929"},"canonical_url":"https://search.ndltd.org/etd/washington/oai:digital.lib.washington.edu:1773/44929","repository":{"repo_id":"washington","name":"University of Washington","base_url":"https://digital.lib.washington.edu/server/oai/request"},"display":{"title":"Incorporating Social Equity in Transit Service and Capital Planning: A Preemptive Analysis of Preliminary Bus Rapid Transit Corridor Design in King County, Washington","abstract":"This study presents an approach for the evaluation of the equity of transportation investments in King County, Washington, with attention to upgrades of existing routes to new “bus rapid transit” service. A review of philosophical and economic literature provides a theoretical foundation, while existing policy and law establishes a regulatory and practical framework that bounds this work. The author is particularly concerned with the extent to which service and capital investments for bus rapid transit expansion in southern King County can be integrated and evaluated across socioeconomic user groups. This study attempts to answer this question by employing a series of quantitative models that include network analysis, transportation gap analysis, and life-cycle cost analysis to evaluate transit equity in southern King County, and specifically along the proposed RapidRide I Line bus rapid transit corridor. Ultimately, the study seeks to balance the ever-competing dimensions of efficiency and equity as they manifest in transit service implementation and offer a novel measurement tool that can ultimately inform route alignment.","abstract_html":"This study presents an approach for the evaluation of the equity of transportation investments in King County, Washington, with attention to upgrades of existing routes to new “bus rapid transit” service. A review of philosophical and economic literature provides a theoretical foundation, while existing policy and law establishes a regulatory and practical framework that bounds this work. The author is particularly concerned with the extent to which service and capital investments for bus rapid transit expansion in southern King County can be integrated and evaluated across socioeconomic user groups. This study attempts to answer this question by employing a series of quantitative models that include network analysis, transportation gap analysis, and life-cycle cost analysis to evaluate transit equity in southern King County, and specifically along the proposed RapidRide I Line bus rapid transit corridor. Ultimately, the study seeks to balance the ever-competing dimensions of efficiency and equity as they manifest in transit service implementation and offer a novel measurement tool that can ultimately inform route alignment.","abstract_has_math":false,"creators":["Kowalski, Ian Andrew"],"institution":null,"degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":["Whittington, Jan"],"committee_chairs":[],"committee_members":[],"year":2019,"date_issued":"2019-10-15","date_published":"2019-10-15","updated_at":"2026-11-18T20:05:47Z","subjects":["Access","Bus Rapid Transit","Capital Planning","Infrastructure","Social Equity","Urban planning","Public administration"],"languages":["en_US"],"rights":["none"],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/1773/44929","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"http://hdl.handle.net/1773/44929","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://digital.lib.washington.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Adigital.lib.washington.edu%3A1773%2F44929","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Whittington, Jan"]},{"key":"dc:creator","label":"Author","values":["Kowalski, Ian Andrew"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2019-10-15T23:02:38Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2019-10-15T23:02:38Z"]},{"key":"dc:date.issued","label":"Date","values":["2019-10-15"]},{"key":"dc:date.submitted","label":"Dc Date Submitted","values":["2019"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Access","Bus Rapid Transit","Capital Planning","Infrastructure","Social Equity","Urban planning","Public administration"]},{"key":"dc:subject.other","label":"Dc Subject Other","values":["Urban planning"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en_US"]},{"key":"dc:rights","label":"Dc Rights","values":["none"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["Kowalski_washington_0250O_20531.pdf"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1773/44929"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["Thesis (Master's)--University of Washington, 2019"]},{"key":"dc:description.abstract","label":"Abstract","values":["This study presents an approach for the evaluation of the equity of transportation investments in King County, Washington, with attention to upgrades of existing routes to new “bus rapid transit” service. A review of philosophical and economic literature provides a theoretical foundation, while existing policy and law establishes a regulatory and practical framework that bounds this work. The author is particularly concerned with the extent to which service and capital investments for bus rapid transit expansion in southern King County can be integrated and evaluated across socioeconomic user groups. This study attempts to answer this question by employing a series of quantitative models that include network analysis, transportation gap analysis, and life-cycle cost analysis to evaluate transit equity in southern King County, and specifically along the proposed RapidRide I Line bus rapid transit corridor. Ultimately, the study seeks to balance the ever-competing dimensions of efficiency and equity as they manifest in transit service implementation and offer a novel measurement tool that can ultimately inform route alignment."]},{"key":"dc:embargo.terms","label":"Dc Embargo Terms","values":["Open Access"]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Incorporating Social Equity in Transit Service and Capital Planning: A Preemptive Analysis of Preliminary Bus Rapid Transit Corridor Design in King County, Washington"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"dc:contributor.advisor":["Whittington, Jan"],"dc:creator":["Kowalski, Ian Andrew"],"dc:date.accessioned":["2019-10-15T23:02:38Z"],"dc:date.available":["2019-10-15T23:02:38Z"],"dc:date.issued":["2019-10-15"],"dc:date.submitted":["2019"],"dc:description":["Thesis (Master's)--University of Washington, 2019"],"dc:description.abstract":["This study presents an approach for the evaluation of the equity of transportation investments in King County, Washington, with attention to upgrades of existing routes to new “bus rapid transit” service. A review of philosophical and economic literature provides a theoretical foundation, while existing policy and law establishes a regulatory and practical framework that bounds this work. The author is particularly concerned with the extent to which service and capital investments for bus rapid transit expansion in southern King County can be integrated and evaluated across socioeconomic user groups. This study attempts to answer this question by employing a series of quantitative models that include network analysis, transportation gap analysis, and life-cycle cost analysis to evaluate transit equity in southern King County, and specifically along the proposed RapidRide I Line bus rapid transit corridor. Ultimately, the study seeks to balance the ever-competing dimensions of efficiency and equity as they manifest in transit service implementation and offer a novel measurement tool that can ultimately inform route alignment."],"dc:embargo.terms":["Open Access"],"dc:format.mimetype":["application/pdf"],"dc:identifier.other":["Kowalski_washington_0250O_20531.pdf"],"dc:identifier.uri":["http://hdl.handle.net/1773/44929"],"dc:language.iso":["en_US"],"dc:rights":["none"],"dc:subject":["Access","Bus Rapid Transit","Capital Planning","Infrastructure","Social Equity","Urban planning","Public administration"],"dc:subject.other":["Urban planning"],"dc:title":["Incorporating Social Equity in Transit Service and Capital Planning: A Preemptive Analysis of Preliminary Bus Rapid Transit Corridor Design in King County, Washington"],"dc:type":["Thesis"],"others:access_status":["open.access"]},"updated_at":"2026-11-18T20:05:47Z"}