{"id":{"repo_id":"washington","oai_identifier":"oai:digital.lib.washington.edu:1773/51664"},"canonical_url":"https://search.ndltd.org/etd/washington/oai:digital.lib.washington.edu:1773/51664","repository":{"repo_id":"washington","name":"University of Washington","base_url":"https://digital.lib.washington.edu/server/oai/request"},"display":{"title":"The BIM in Practice in the Real World","abstract":"The construction industry is undergoing rapid technological advancements with the introduction of Building Information Modeling (BIM) which has the potential to revolutionize building design, construction, and operation. Despite their potential, these technologies are not yet put into practice to the maximum potential by all the users around the world. This research explores the current state of BIM in the construction industry and the different types of processes undertaken by BIM professionals to enhance the efficiency and productivity of a project. The study revolves around some of the parameters such as accuracy, efficiency, quality, and time. This is done through several different case studies across different verticals of construction. The journey shows us a unique perspective that the BIM teams have adopted to take the project to a higher level. It also depicts the need to usage of automation although there is a need to have a balance and there should be a clear understanding of when to rely on automation.","abstract_html":"The construction industry is undergoing rapid technological advancements with the introduction of Building Information Modeling (BIM) which has the potential to revolutionize building design, construction, and operation. Despite their potential, these technologies are not yet put into practice to the maximum potential by all the users around the world. This research explores the current state of BIM in the construction industry and the different types of processes undertaken by BIM professionals to enhance the efficiency and productivity of a project. The study revolves around some of the parameters such as accuracy, efficiency, quality, and time. This is done through several different case studies across different verticals of construction. The journey shows us a unique perspective that the BIM teams have adopted to take the project to a higher level. It also depicts the need to usage of automation although there is a need to have a balance and there should be a clear understanding of when to rely on automation.","abstract_has_math":false,"creators":["Das, Anik"],"institution":null,"degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":["Dossick, Carrie Sturts"],"committee_chairs":[],"committee_members":[],"year":2024,"date_issued":"2024-09-09","date_published":"2024-09-09","updated_at":"2026-11-19T10:20:22Z","subjects":["Architecture","Automation","Building Information Modelling","Design","Engineering","Civil engineering","Construction management"],"languages":["en_US"],"rights":["CC BY-NC-SA"],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/1773/51664","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/1773/51664","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://digital.lib.washington.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Adigital.lib.washington.edu%3A1773%2F51664","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Dossick, Carrie Sturts"]},{"key":"dc:creator","label":"Author","values":["Das, Anik"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2024-09-09T23:00:18Z"]},{"key":"dc:date.issued","label":"Date","values":["2024-09-09"]},{"key":"dc:date.liftdate","label":"Dc Date Liftdate","values":["2026-08-30T23:00:18Z"]},{"key":"dc:date.submitted","label":"Dc Date Submitted","values":["2024"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Architecture","Automation","Building Information Modelling","Design","Engineering","Civil engineering"]},{"key":"dc:subject.other","label":"Dc Subject Other","values":["Construction management"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en_US"]},{"key":"dc:rights","label":"Dc Rights","values":["CC BY-NC-SA"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["Das_washington_0250O_27224.pdf"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/1773/51664"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["Thesis (Master's)--University of Washington, 2024"]},{"key":"dc:description.abstract","label":"Abstract","values":["The construction industry is undergoing rapid technological advancements with the introduction of Building Information Modeling (BIM) which has the potential to revolutionize building design, construction, and operation. Despite their potential, these technologies are not yet put into practice to the maximum potential by all the users around the world. This research explores the current state of BIM in the construction industry and the different types of processes undertaken by BIM professionals to enhance the efficiency and productivity of a project. The study revolves around some of the parameters such as accuracy, efficiency, quality, and time. This is done through several different case studies across different verticals of construction. The journey shows us a unique perspective that the BIM teams have adopted to take the project to a higher level. It also depicts the need to usage of automation although there is a need to have a balance and there should be a clear understanding of when to rely on automation."]},{"key":"dc:embargo.terms","label":"Dc Embargo Terms","values":["Restrict to UW for 2 years -- then make Open Access"]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["The BIM in Practice in the Real World"]},{"key":"others:access_status","label":"Others Access Status","values":["embargo"]}]}],"canonical_facts":{"dc:contributor.advisor":["Dossick, Carrie Sturts"],"dc:creator":["Das, Anik"],"dc:date.accessioned":["2024-09-09T23:00:18Z"],"dc:date.issued":["2024-09-09"],"dc:date.liftdate":["2026-08-30T23:00:18Z"],"dc:date.submitted":["2024"],"dc:description":["Thesis (Master's)--University of Washington, 2024"],"dc:description.abstract":["The construction industry is undergoing rapid technological advancements with the introduction of Building Information Modeling (BIM) which has the potential to revolutionize building design, construction, and operation. Despite their potential, these technologies are not yet put into practice to the maximum potential by all the users around the world. This research explores the current state of BIM in the construction industry and the different types of processes undertaken by BIM professionals to enhance the efficiency and productivity of a project. The study revolves around some of the parameters such as accuracy, efficiency, quality, and time. This is done through several different case studies across different verticals of construction. The journey shows us a unique perspective that the BIM teams have adopted to take the project to a higher level. It also depicts the need to usage of automation although there is a need to have a balance and there should be a clear understanding of when to rely on automation."],"dc:embargo.terms":["Restrict to UW for 2 years -- then make Open Access"],"dc:format.mimetype":["application/pdf"],"dc:identifier.other":["Das_washington_0250O_27224.pdf"],"dc:identifier.uri":["https://hdl.handle.net/1773/51664"],"dc:language.iso":["en_US"],"dc:rights":["CC BY-NC-SA"],"dc:subject":["Architecture","Automation","Building Information Modelling","Design","Engineering","Civil engineering"],"dc:subject.other":["Construction management"],"dc:title":["The BIM in Practice in the Real World"],"dc:type":["Thesis"],"others:access_status":["embargo"]},"updated_at":"2026-11-19T10:20:22Z"}