{"id":{"repo_id":"waterloo","oai_identifier":"oai:uwspace.uwaterloo.ca:10012/7914"},"canonical_url":"https://search.ndltd.org/etd/waterloo/oai:uwspace.uwaterloo.ca:10012/7914","repository":{"repo_id":"waterloo","name":"University of Waterloo","base_url":"https://dspacemainprd01.lib.uwaterloo.ca/server/oai/request"},"display":{"title":"Two-Echelon Supply Chain Design for Spare Parts with Time Constraints","abstract":"We consider a single-part, two-echelon supply chain problem for spare parts. The network consists of a single manufacturing plant, a set of service centers (SCs) and a set of customers. Both echelons keep spare parts using the base-stock replenishment policy. The plant behaves as an M/M/1 queueing system and has limited production and storage capacity. Demand faced by each SC follows an independent Poisson process. The problem is to determine optimal location-allocation and optimal base-stock levels at both echelons while satisfying the target service levels and customer preferences of SCs. We develop a mixed integer non-linear programming model and use cutting-plane method to optimize the inventory-location decisions. We present an exact solution procedure for the inventory stocking problem and demonstrate the limitations of using traditional inventory models like METRIC-like and Approximate in case of high utilization rates. We show the effectiveness of our proposed cutting-plane algorithm and provide important managerial insights for spare parts management.","abstract_html":"We consider a single-part, two-echelon supply chain problem for spare parts. The network consists of a single manufacturing plant, a set of service centers (SCs) and a set of customers. Both echelons keep spare parts using the base-stock replenishment policy. The plant behaves as an M/M/1 queueing system and has limited production and storage capacity. Demand faced by each SC follows an independent Poisson process. The problem is to determine optimal location-allocation and optimal base-stock levels at both echelons while satisfying the target service levels and customer preferences of SCs. We develop a mixed integer non-linear programming model and use cutting-plane method to optimize the inventory-location decisions. We present an exact solution procedure for the inventory stocking problem and demonstrate the limitations of using traditional inventory models like METRIC-like and Approximate in case of high utilization rates. We show the effectiveness of our proposed cutting-plane algorithm and provide important managerial insights for spare parts management.","abstract_has_math":false,"creators":["Riaz, Muhammad Waqas"],"institution":"University of Waterloo","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2013,"date_issued":"2013-09-25T17:35:07Z","date_published":"2013-09-25T17:35:07Z","updated_at":"2026-11-19T10:48:31Z","subjects":["supply chain design","spare parts management","response time requirements","base-stock replenishment policy","cutting-planes","queueing","inventory-location","facility location","inventory stocking","mixed-integer programming"],"languages":["en"],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/10012/7914","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"http://hdl.handle.net/10012/7914","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://dspacemainprd01.lib.uwaterloo.ca/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Auwspace.uwaterloo.ca%3A10012%2F7914","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:creator","label":"Author","values":["Riaz, Muhammad Waqas"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-09-25T17:35:07Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-09-25T17:35:07Z"]},{"key":"dc:date.issued","label":"Date","values":["2013-09-25T17:35:07Z"]},{"key":"dc:date.submitted","label":"Dc Date Submitted","values":["2013"]},{"key":"dc:publisher","label":"Institution","values":["University of Waterloo"]},{"key":"dc:type","label":"Dc Type","values":["Master Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["supply chain design","spare parts management","response time requirements","base-stock replenishment policy","cutting-planes","queueing","inventory-location","facility location","inventory stocking","mixed-integer programming"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/10012/7914"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["We consider a single-part, two-echelon supply chain problem for spare parts. The network consists of a single manufacturing plant, a set of service centers (SCs) and a set of customers. Both echelons keep spare parts using the base-stock replenishment policy. The plant behaves as an M/M/1 queueing system and has limited production and storage capacity. Demand faced by each SC follows an independent Poisson process. The problem is to determine optimal location-allocation and optimal base-stock levels at both echelons while satisfying the target service levels and customer preferences of SCs. We develop a mixed integer non-linear programming model and use cutting-plane method to optimize the inventory-location decisions. We present an exact solution procedure for the inventory stocking problem and demonstrate the limitations of using traditional inventory models like METRIC-like and Approximate in case of high utilization rates. We show the effectiveness of our proposed cutting-plane algorithm and provide important managerial insights for spare parts management."]},{"key":"dc:title","label":"Title","values":["Two-Echelon Supply Chain Design for Spare Parts with Time Constraints"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"dc:creator":["Riaz, Muhammad Waqas"],"dc:date.accessioned":["2013-09-25T17:35:07Z"],"dc:date.available":["2013-09-25T17:35:07Z"],"dc:date.issued":["2013-09-25T17:35:07Z"],"dc:date.submitted":["2013"],"dc:description.abstract":["We consider a single-part, two-echelon supply chain problem for spare parts. The network consists of a single manufacturing plant, a set of service centers (SCs) and a set of customers. Both echelons keep spare parts using the base-stock replenishment policy. The plant behaves as an M/M/1 queueing system and has limited production and storage capacity. Demand faced by each SC follows an independent Poisson process. The problem is to determine optimal location-allocation and optimal base-stock levels at both echelons while satisfying the target service levels and customer preferences of SCs. We develop a mixed integer non-linear programming model and use cutting-plane method to optimize the inventory-location decisions. We present an exact solution procedure for the inventory stocking problem and demonstrate the limitations of using traditional inventory models like METRIC-like and Approximate in case of high utilization rates. We show the effectiveness of our proposed cutting-plane algorithm and provide important managerial insights for spare parts management."],"dc:identifier.uri":["http://hdl.handle.net/10012/7914"],"dc:language.iso":["en"],"dc:publisher":["University of Waterloo"],"dc:subject":["supply chain design","spare parts management","response time requirements","base-stock replenishment policy","cutting-planes","queueing","inventory-location","facility location","inventory stocking","mixed-integer programming"],"dc:title":["Two-Echelon Supply Chain Design for Spare Parts with Time Constraints"],"dc:type":["Master Thesis"],"others:access_status":["open.access"]},"updated_at":"2026-11-19T10:48:31Z"}