{"id":{"repo_id":"wayne-thes","oai_identifier":"oai:digitalcommons.wayne.edu:oa_dissertations-3172"},"canonical_url":"https://search.ndltd.org/etd/wayne-thes/oai:digitalcommons.wayne.edu:oa_dissertations-3172","repository":{"repo_id":"wayne-thes","name":"Wayne State University","base_url":"https://digitalcommons.wayne.edu/do/oai/"},"display":{"title":"Analysis Of Factors Influencing Return On Investment (roi) For Building Information Modeling (bim) Implementation","abstract":"A research study was conducted to investigate and understand factors influencing Return on Investment of Building Information Modeling (BIM). Research data was collected from 182 industry professionals (design firms, contractors and owners) using a survey instrument. The research data were evaluated by examining frequency distributions and running statistical analyses including an analysis of variance with post hoc tests and a multiple linear regression analysis. Furthermore, a simulation study was conducted to infer conclusions about the larger population from which the repeated samples were taken. The research findings revealed that the factors contributing to Return on Investment of BIM implementation were: project type, project sector, project team members, project budget, project delivery systems, interoperability, and BIM maturity level.","abstract_html":"A research study was conducted to investigate and understand factors influencing Return on Investment of Building Information Modeling (BIM). Research data was collected from 182 industry professionals (design firms, contractors and owners) using a survey instrument. The research data were evaluated by examining frequency distributions and running statistical analyses including an analysis of variance with post hoc tests and a multiple linear regression analysis. Furthermore, a simulation study was conducted to infer conclusions about the larger population from which the repeated samples were taken. The research findings revealed that the factors contributing to Return on Investment of BIM implementation were: project type, project sector, project team members, project budget, project delivery systems, interoperability, and BIM maturity level.","abstract_has_math":false,"creators":["Kulaksiz, Tugce"],"institution":null,"degree_name":"Ph.D.","degree_level":"Open Access Dissertation","degree_discipline":"Civil and Environmental Engineering","degree_department":null,"school":null,"contributors":["Mumtaz Usmen"],"advisors":[],"committee_chairs":[],"committee_members":[],"year":null,"date_issued":"","date_published":null,"updated_at":"2026-11-19T09:12:45Z","subjects":["BIM","Building Information Modeling","Return on Investment","ROI","Civil Engineering"],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://digitalcommons.wayne.edu/oa_dissertations/2173","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"https://digitalcommons.wayne.edu/oa_dissertations/2173","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://digitalcommons.wayne.edu/do/oai/?verb=GetRecord&metadataPrefix=oai_etdms&identifier=oai%3Adigitalcommons.wayne.edu%3Aoa_dissertations-3172","prefix":"oai_etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["Mumtaz Usmen"]},{"key":"dc:creator","label":"Author","values":["Kulaksiz, Tugce"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.available","label":"Dc Date Available","values":["2018-01-01T08:00:00Z"]},{"key":"dc:date.created","label":"Dc Date Created","values":["2019-01-01T08:00:00Z"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Civil and Environmental Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Open Access Dissertation"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Ph.D."]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["BIM","Building Information Modeling","Return on Investment","ROI","Civil Engineering"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["https://digitalcommons.wayne.edu/oa_dissertations/2173"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["A research study was conducted to investigate and understand factors influencing Return on Investment of Building Information Modeling (BIM). Research data was collected from 182 industry professionals (design firms, contractors and owners) using a survey instrument. The research data were evaluated by examining frequency distributions and running statistical analyses including an analysis of variance with post hoc tests and a multiple linear regression analysis. Furthermore, a simulation study was conducted to infer conclusions about the larger population from which the repeated samples were taken. The research findings revealed that the factors contributing to Return on Investment of BIM implementation were: project type, project sector, project team members, project budget, project delivery systems, interoperability, and BIM maturity level."]},{"key":"dc:title","label":"Title","values":["Analysis Of Factors Influencing Return On Investment (roi) For Building Information Modeling (bim) Implementation"]}]}],"canonical_facts":{"dc:contributor":["Mumtaz Usmen"],"dc:creator":["Kulaksiz, Tugce"],"dc:date.available":["2018-01-01T08:00:00Z"],"dc:date.created":["2019-01-01T08:00:00Z"],"dc:description.abstract":["A research study was conducted to investigate and understand factors influencing Return on Investment of Building Information Modeling (BIM). Research data was collected from 182 industry professionals (design firms, contractors and owners) using a survey instrument. The research data were evaluated by examining frequency distributions and running statistical analyses including an analysis of variance with post hoc tests and a multiple linear regression analysis. Furthermore, a simulation study was conducted to infer conclusions about the larger population from which the repeated samples were taken. The research findings revealed that the factors contributing to Return on Investment of BIM implementation were: project type, project sector, project team members, project budget, project delivery systems, interoperability, and BIM maturity level."],"dc:identifier":["https://digitalcommons.wayne.edu/oa_dissertations/2173"],"dc:subject":["BIM","Building Information Modeling","Return on Investment","ROI","Civil Engineering"],"dc:title":["Analysis Of Factors Influencing Return On Investment (roi) For Building Information Modeling (bim) Implementation"],"thesis:degree_discipline":["Civil and Environmental Engineering"],"thesis:degree_level":["Open Access Dissertation"],"thesis:degree_name":["Ph.D."]},"updated_at":"2026-11-19T09:12:45Z"}