{"id":{"repo_id":"whiterose","oai_identifier":"oai:etheses.whiterose.ac.uk:13531"},"canonical_url":"https://search.ndltd.org/etd/whiterose/oai:etheses.whiterose.ac.uk:13531","repository":{"repo_id":"whiterose","name":"White Rose University Consortium","base_url":"https://etheses.whiterose.ac.uk/cgi/oai2"},"display":{"title":"Develop a framework for successfully managing public transport development projects in Vietnam","abstract":"Despite having incentives and generous investments from the government, many public infrastructure projects in Vietnam have been poorly finished with time delays, cost overruns and improper quality standard. These adversely influence the country’s socioeconomic development and modernisation process. However, there has not been an appropriate strategy to cope with and a lack of research into how to do so. The aim of this thesis is to develop and propose a sound solution to manage and deliver public transport development projects in Vietnam more successfully. There are five main elements which have very strong influences on the achievement of project success, namely: Critical Success Factors, Success Criteria, Key Stakeholders, Project Process and Severe Problems. Nevertheless, previous studies looked at them individually or as a pair only, while discretely recognised their connections during the management and implementation process. This research argues that those elements and their links should be viewed holistically and combined together in order to achieve a complete picture of project success. Having established this, a lifecycle based framework is developed and used to serve as a lens for the empirical analysis. The thesis has found out that traditional delivery route is still widely used and favoured in Vietnamese public transport development projects with complicated involvements of many parties. The government still plays a dominant role which has the greatest influences on project outcomes. Meanwhile, the most severe problems which project participants in the VCI have been struggling to deal with relate to finance and human. As a result, the most critical factors which can cope with those problems and achieve success also relate to finance and human. On another hand, a set of criteria for measuring overall performance and result of those projects are binding to the success of the final product and project management. In this thesis, it is the first time a framework, which simultaneously encompasses all elements of project success, has been developed. As an obvious result, it changes the way people perceive project success and how to achieve. The framework helps to fill the knowledge gaps in the literature of project management in transitional and emerging markets. It provides a clear picture of the key stakeholders involved with related activities which need to be carried out across the different phases of the project process, identifies the severe problems which need to be addressed, and provides a better understanding of the standards which are required in safeguarding project success. The validity of the framework and empirical findings of this research contribute new insights into the developing world as Vietnam is the case study. Therefore, the thesis significantly contributes to the body of knowledge of project success and construction project management.","abstract_html":"Despite having incentives and generous investments from the government, many public infrastructure projects in Vietnam have been poorly finished with time delays, cost overruns and improper quality standard. These adversely influence the country’s socioeconomic development and modernisation process. However, there has not been an appropriate strategy to cope with and a lack of research into how to do so. The aim of this thesis is to develop and propose a sound solution to manage and deliver public transport development projects in Vietnam more successfully. There are five main elements which have very strong influences on the achievement of project success, namely: Critical Success Factors, Success Criteria, Key Stakeholders, Project Process and Severe Problems. Nevertheless, previous studies looked at them individually or as a pair only, while discretely recognised their connections during the management and implementation process. This research argues that those elements and their links should be viewed holistically and combined together in order to achieve a complete picture of project success. Having established this, a lifecycle based framework is developed and used to serve as a lens for the empirical analysis. The thesis has found out that traditional delivery route is still widely used and favoured in Vietnamese public transport development projects with complicated involvements of many parties. The government still plays a dominant role which has the greatest influences on project outcomes. Meanwhile, the most severe problems which project participants in the VCI have been struggling to deal with relate to finance and human. As a result, the most critical factors which can cope with those problems and achieve success also relate to finance and human. On another hand, a set of criteria for measuring overall performance and result of those projects are binding to the success of the final product and project management. In this thesis, it is the first time a framework, which simultaneously encompasses all elements of project success, has been developed. As an obvious result, it changes the way people perceive project success and how to achieve. The framework helps to fill the knowledge gaps in the literature of project management in transitional and emerging markets. It provides a clear picture of the key stakeholders involved with related activities which need to be carried out across the different phases of the project process, identifies the severe problems which need to be addressed, and provides a better understanding of the standards which are required in safeguarding project success. The validity of the framework and empirical findings of this research contribute new insights into the developing world as Vietnam is the case study. Therefore, the thesis significantly contributes to the body of knowledge of project success and construction project management.","abstract_has_math":false,"creators":["Vu, Thanh-Son"],"institution":"University of Leeds","degree_name":"Ph.D","degree_level":"doctoral","degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":["Moodley, Krisen"],"committee_chairs":[],"committee_members":[],"year":2016,"date_issued":"2016-03","date_published":"2016-03","updated_at":"2026-11-18T21:42:33Z","subjects":[],"languages":["eng"],"rights":[],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier","label":"Identifier","values":["uk.bl.ethos.689300"],"render_values":[{"text":"uk.bl.ethos.689300","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":null,"outbound_label":null,"outbound_source":null,"record_url":null,"record_label":null,"record_kind":null,"record_source":null,"download_url":"https://etheses.whiterose.ac.uk/id/eprint/13531/2/The%20Thesis%20.pdf","download_label":"Download PDF","download_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://etheses.whiterose.ac.uk/cgi/oai2?verb=GetRecord&metadataPrefix=uketd_dc&identifier=oai%3Aetheses.whiterose.ac.uk%3A13531","prefix":"uketd_dc"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Moodley, Krisen"]},{"key":"dc:creator","label":"Author","values":["Vu, Thanh-Son"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2016-03"]},{"key":"dc:date.issued","label":"Date","values":["2016-03"]},{"key":"dc:publisher.commercial","label":"Dc Publisher Commercial","values":["University of Leeds"]},{"key":"dc:publisher.department","label":"Dc Publisher Department","values":["School of Civil Engineering (Leeds)"]},{"key":"dc:publisher.institution","label":"Dc Publisher Institution","values":["University of Leeds"]},{"key":"dc:relation.isreferencedby","label":"Dc Relation Isreferencedby","values":["https://etheses.whiterose.ac.uk/id/eprint/13531/"]},{"key":"dc:relation.references","label":"Dc Relation References","values":["References Adler, N.J. (1983), ‘A Typology of Management Studies Involving Culture’, Journal of International Business Studies, vol. 14, no. 2, pp. 29-47. Ahmad, I.U. and Sein, M.K. (1997),’Construction project teams for TQM: a factor-element impact model’, Construction Management and Economics, vol., 15, pp. 457-467. Akintoye, A. S. and MacLeod, M. J. (1997), ‘Risk analysis and management in construction’, International Journal of Project Management1, vol. 5, no. 1, pp. 31-38. Al-Sudairi, A. A., Dielanann, J. E., Songer, A. D. and Brown, H. M. (1999), ‘Production System Design in Construction’, Proceedings Seventh Annual Conference of the International Groupfor Lean Construction, IGLC-7, Berkeley, CA Arditi, D. and Gunaydin, H.M. (1997), ‘Total quality management in the construction process’, International Journal of Project Management, vol. 15, no. 4, pp. 235-243. Ashley, D.B., Lurie, C.S. and Jaselskis, E.J. (1987), ‘Determinants of construction project success’, Project Management Journal, vol. 18, no. 2, pp. 69-79. Assaf, A.A. and Al-Hejji, S. (2006), ‘Causes of delay in large construction projects’, International Journal of Project Management, vol. 24, pp. 349-357. Atkinson, A.A, Waterhouse, J.H. and Wells, R.B. (1997); “A Stakeholder Approach to Strategic Performance Measurement”, MIT/Sloan, Management Review, vol. 38, no. 3, pp. 25-37. Atkinson, R. (1999), ‘Project management: cost, time and quality, two best guesses and a phenomenon, it is time to accept other success criteria’, International Journal of Project Management, vol. 17, no. 6, pp. 337-342. Analytic Tech (AT) (2011) [online], ‘Elements of a theoretical framework’, available at: http://www.analytictech.com/mb313/elements.htm, [accessed: 18/02/2011]. Avison, D., Lau, F., Myers, M. and Nielsen, P.A. (1999), ‘Action Research’, Communications of the ACM, vol. 42, no. 1, pp. 94-97. Baccarini, D. (1999), ‘The Logical Framework Method for Defining Project Success’, Project Management Journal, vol. 30, no. 4, pp. 25-32. Ballard, G. and Howell, G. A. (2004), ‘Competing construction Management Paradigms’, Lean construction Journal, vol. 1, pp. 38-45. Ballard, G., Harper, N. and Zabelle, T. (2003), ‘Learning to see work flow: an application of lean concepts to precast concrete fabrication’, Engineering, Construction and Architectural Management, vol. 10, no. 1, pp. 6-14. Barry, Z.P. and Randolph, W.A. (1988), “Effective project planning and management: Getting the job done”, New Jersey: Prentice Hall. Bassioni, H.A., Prince, A.D.F. and Hassan, T.M. (2005), ‘Building a conceptual framework for measuring business performance in construction: an empirical evaluation’, Construction Management and Economics, vol. 23, pp. 495-507. Baxendale, T. and Jones, 0. (2000), ‘Construction design and management safety regulations in practice-progress on implementation’, International Journal of Project Management, vol. 18, no. 1, pp. 33-40. Bedingfield, J.D. and Thal, A.E.Jr. (2008), ‘Project Manager Personality as a Factor for success’, Portland International Conference on Management of Project, IEEE Transactions on Power Apparatus and Systems, pp. 27-31. Belassi, W. and Tukel, O.I. (1996), ‘A new framework for determining critical success/ failure factors in projects’, International Journal of Project Management, vol. 14, no. 3, pp. 141-151. Bellamy, T., William, A., Sher, W., Sherrat, D. and Gameson, R. (2008), “Preliminary examination of ICT collaborative design and management in the construction industry”, RICS. Bell, K. (1994), ‘The strategic management of projects to enhance value for money’, for BAA PLC. PhD thesis, Heriot Watt University. Belout, A. (1998), ‘Effects of human resource management on project effectiveness and success: toward a new conceptual framework’, International Journal of Project Management, vol. 16, no. 1, pp. 21-26. Belout, A. and Gauvreau, C. (2003), ‘Factors influencing project success: the impact of human resource management’, International Journal of Project Management, vol. 22, pp. 1-11. Bertelsen, S. (2004), ‘Construction Management in a Complexity Perspective’, 1st International SCRI Symposium. University of Salford, Manchester. Boussabaine, A. (2007), “Cost Planning of PFI and PPP Building Projects”, Abingdon: Taylor & Francis. Bloomberg news (2003), ‘Vietnam growth hits 7%, fastest in Southeast Asia’, International Herald Tribune, cited in Truong et al. (2004) Bloomberg news (2008), ‘Vietnam’s economy grew by a decade high in 2007’, Bloomberg, cited in Ling and Bui (2010). BOND (2003) [online], ‘Logical Framework Analysis’, available at: http://www.gdrc.org/ngo/logical-fa.pdf, [accessed: 11/03/2010]. Bourne, L. (2007), ‘Avoiding the Successful Failure’, PMI Global Congress Proceedings - Hong Kong Bourne, M., Neely, A., Platts, K. and Mills, J. (2002), ‘The Success and failure of performance measurement initiatives, Perceptions of participating managers’, International Journal of Operations and Production Management, vol. 22, no. 11, pp. 1288 – 1310. Bourne, L. and Walker, D. (2004), ‘Advancing project management in learning organizations’, The Learning Organization, vol. 11, no. 3, pp. 226–43. Boynton, A.C. and Zmud, R.W. (1984), ‘An Assessment of Critical Success Factors’, Sloan Management Review, vol. 25, no. 4, pp. 17-27. Bower, D., Ashby, G., Gerald, K. and Smyk, W. (2002), ‘Incentive Mechanisms for Project Success’, Journal of Management in Engineering, vol. 18, no. 1, pp. 37 – 43. Brown, M. (2008) [online], ‘Real Estate and Construction in Vietnam’, available at: www.mayerbrownjsm.com, [accessed: 20/02/2010] Bryde, D. (2008), ‘Perceptions of the impact of project sponsorship practices on project success’, International Journal of Project Management, vol. 26, pp. 800-809. Bryman, A. and Bell, E. (2003), ‘business research methods’, Oxford, Oxford University Press Bryman, A. and Bell, E. (2007), ‘business research methods’, Oxford, Oxford University Press Carl, H. (1994), ‘Developing and implementing a contractor safety program’, Professional Safety, vol. 39, no. 8, pp. 31-35 Castella, J.C., Kam, S.P., Dang, D.Q., Verburg, P.H. and Chu, T.H. (2007), ‘Combining top-down and bottom-up modelling approaches of land use/cover change to support public policies: Application to sustainable management of natural resources in northern Vietnam’, Land Use Policy, vol. 24, pp. 531-545. Chan, A.P.C. and Chan, A.P.L. (2004), ‘Key performance indicators for measuring construction success’, International Journal of Project Management, vol. 11, no. 2, pp. 203-221 Chan, A.P.C., Scott, D. and Chan, A.P.L. (2004a), ‘Factors Affecting the Success of a Construction Project’, Journal of Construction Engineering and Management, vol. 130, no. 1, pp. 153-155 Chan, A.P.C., Chan, D.W.M., Chiang, Y.H., Tang, B.S., Chan, E.H.W. and Ho, S.K. (2004b), ‘Exploring Critical Success Factors for Partnering in Construction Project’, Journal of Construction Engineering and Management, vol. 130, no. 2, pp. 188-198 Chan, A.P.C., Ho, D.C.K., and Tam, C.M. (2001), ‘Design and Build Project Success Factors: Multivariate Analysis’, Journal of Construction Engineering and Management, vol. 127, no. 2, pp. 93-100 Chan, A.P.C., Scott, D. and Lam, E.W.M. (2002), ‘Framework of Success Criteria for Design/Build Projects’, Journal of Management in Engineering, vol. 18, no. 3, pp. 120-128 Charmaz, K. (2001), ‘Qualitative interviewing and grounded theory analysis’, in ‘Handbook of Interview Research: Context and Method’, Sage Publication, New York. Cheah, C. Y. J. and Garvin, M. J. (2004), ‘An open framework for corporate strategy in construction’, Engineering Construction and Architectural Management, vol. 11, no. 3, pp. 176–188. Cheng, E.W.L., Li, H. And Love, P.E.D. (2000), ‘establishment of critical success factors for construction partnering’, Journal of Management in Engineering, vol. 16, no. 2, pp.84-92 Child, J. and Faulkner, D. (1998), ‘Strategic of Co-operation: Managing Alliances, Networks, and Joint Venture’, Oxford: University Press. Chinowsky, P.S. and Meredith, E.M (2000), ‘Strategic Management in Construction’, Journal of Construction Engineering and Management, vol. 126, no. 1, pp. 1-9. Chua, D.K.H., Kog, Y.C. and Loh, P.K. (1999), ‘Critical Success Factors for Different Project Objectives’, Journal of Construction Engineering and Management, vol. 125, no. 3, pp. 142-150. Chua, D.K.H, Wang, Y. and Tan, W.T. (2003), ‘Impacts of Obstacles in East Asian Cross-Border Construction’, Journal of Construction Engineering and Management, vol. 129, no. 2, pp. 131-141. Clarke, A. (1999), ‘A practical use of key success factors to improve the effectiveness of project management’, International Journal of Project Management, vol. 17, no. 3, pp. 139-145 Crawford, L. (2000), ‘Profiling the Competent Project Manager’, in: Project Management Research at the Turn of the Millennium: Proceedings of PMI Research Conference, 21-24 June, 2000, Paris, France, pp. 3-15. Sylva, NC: Project Management Institute. Creswell, J.W. (2009), ‘Research Design: Qualitative, Quantitative, and Mixed Methods Approaches’, California: Sage publications, Inc. Collins, A. and Baccarini, D. (2004), ‘Project Success – A Survey’, Journal of Construction Research, vol. 5, no. 2, pp. 211-231. Constructing Excellent (2014) [online], ‘Value Management’, available at: http://www.constructingexcellence.org.uk/pdf/fact_sheet/value.pdf, [accessed: 05/01/2014] Constructing Excellent (2014) [online], ‘Lean Construction’, available at: http://www.constructingexcellence.org.uk/pdf/fact_sheet/lean.pdf, [accessed: 05/01/2014] Constructing Excellent (2014) [online], ‘Supply Chain Management’, available at: http://www.constructingexcellence.org.uk/pdf/fact_sheet/supplychain.pdf, [accessed: 05/01/2014] Cooper, R.G. and Kleinschmidt, E.J. (1987), ‘Success factors in product innovation’, Journal of Industrial Marketing Management, vol. 16, no. 3, pp. 215-224 Dainty, A. R. J., Briscoe, G.H. and Millett, S.J. (2001), ‘Subcontractor perspectives on supply chain alliances’, Construction Management and Economics, vol.19, no. 8, pp. 841-848. Dainty, A.R.J., Cheng, M.I. and Moore, D.R. (2003), ‘Redefining performance measures for construction project managers: an empirical evaluation’, Construction Management and Economics, vol. 21, pp. 209 – 218. Dainty, A. (2008), ‘Methodological pluralism in construction management research’, in Knight, A. and Ruddock, L. (2008), ‘Advanced research methods in the Built Environment’, Chichester, John Wiley & Sons Ltd. Dallas, M.F. (2006), ‘Value & Risk Management: A Guide to Best Practice’, Blackwell Publishing Inc, Oxford, UK. Davies, T.C. (2002), ‘The “real” success factors on projects’, International Journal of Project Management, vol. 20, pp. 185-190. DBS Group Research (2008) [online], ‘Economics Vietnam: Inflation challenge ahead’, available at: https://www.dbsvresearch.com/research%5Cdbs%5Cresearch.nsf/(vwAllDocs)/6E40FB0AFC50E41B4825740B0028A1DB/$FILE/vn_2008mar13.pdf, [accessed: 20/02/2010] De Wit, A. (1988), ‘Measurement of project success’, International Journal of Project Management, vol. 6, no. 3, pp. 164-170. Department of Trade and Industry (DTI) (2004), ‘Constructing Excellence- Demonstrating Excellence-An Evolution of the Programme of Demonstrations’, available at: [http://www/.Constructingexcellence.org.uk], [accessed: 02/01/2014] Diallo, A. and Thuillier, D. (2004), ‘The success of international development projects: the perceptions of African project coordinators’, International Journal of Project Management, vol. 22, pp. 19-31. Diallo, A. and Thuillier, D. (2005), ‘The success of international development projects, trust and communication: an African perspective’, International Journal of Project Management, vol. 23, pp. 237-252. Dissanayaka, S.M. and Kumaraswamy, M.M. (1999), ‘Comparing contributors to time and cost performance in building projects’, Building and Environment, vol. 34, pp. 31-42. Dlakwa, M.M. and Culpin, M.F. (1990), ‘Reasons for overrun in public sector construction projects in Nigeria’, International Journal of Project Management, vol. 8, no. 4, pp. 237-241. Do, B.K. and Tun, L.M. (2008), ‘Success Criteria and Factors for international Development Projects: A Life-Cycle-Based Framework’, Project Management Journal, vol. 39, no. 1, pp. 72-84. Dtinews (2013) [online], ‘Hanoi to speed up construction on world most expensive road’, available at: http://www.dtinews.vn/en/news/017004/28840/hanoi-to-speed-up-construction-on-world-s-most-expensive-road.html, [accessed: 16/01/2014] Dulami, M.F., Ling, F.Y.Y. and Bajracharya, A. (2003), ‘Organisational motivation and inter-organisational interaction in construction innovation in Singapore’, Construction Management and Economics, vol. 21, pp. 307–318. Duncan, G.L. and Gorsha, R.A. (1983), ‘Project Management, A Major Factor In Project Success’, IEEE Transactions on Power Apparatus and Systems, vol. 102, no. 11, pp. 3701-3705. Dvir, D. and Lechler, T. (2004), ‘Plans are nothing, changing plans is everything: the impact of changes on project success’, Research Policy, vol. 33, pp. 1-15. Dvir, D., Lipovetsky, S., Shenhar, A. and Tishler, A. (1998), ‘In search of project classification: a non-universal approach to project success factors’, Research Policy, vol. 27, pp. 915-935. Dvir, D., Raz, T. and Shenhar, A. (2003), ‘An empirical analysis of the relationship between project planning and project success’, International Journal of Project Management, vol. 21, pp. 89-95. Dvir, D., Sadeh, A., and Pines, A.M. (2006), ‘Project and project managers: the relationship between project manager’s personality, project types, and project success’, Project Management Journal, vol. 37, no. 5, pp. 36-48. E-Finance (2009) [online], ‘ADB President: Vietnam has get out of the bottom of financial crisis’, available at: http://www.taichinhdientu.vn/Home/Chu-tich-ADB-Viet-Nam-da-thoat-day-khung-hoang/20099/63973.dfis, [accessed: 20/02/2010] Eriksson, P.E. and Westerberg, M. (2011), ‘Effects of Cooperative Procurement Procedures on Construction Project Performance: A Conceptual Framework’, International Journal of Project Management, Vol. 29, pp. 197-208. Fang, D.P., Xie, F., Huang, X.Y. and Li, H. (2004), ‘Factor analysis-based studies on construction workplace safety management in China’, International Journal of Project Management, vol. 22, no. 1, pp. 43-49. Farrar, J.M., AbouRizk, S.M. and Mao, X. (2004), ‘Generic Implementation of Lean Concepts in Simulation Models’, Lean construction Journal, vol. 1, pp.1-23. Fellows, R. and Liu, A. (2008), ‘Research Methods for Construction’, Chichester: John Wiley & Sons Ltd, Blackwell Publishing Ltd, UK. Flyvbjerg, B., Holm, M.K.S and Buhl, S.L. (2003), ‘How common and how large are cost overruns in transport infrastructure projects’, Transport Reviews, vol. 23, no. 1, pp. 71-88. Freeman, M. and Beale, P. (1992), ‘Measuring Project Success’, Project Management Journal, vol. 23, no. 1, pp. 8-17. Frimpong, Y., Oluwoye, J. and Crawford, L. (2003), ‘Causes of delay and cost overruns in construction groundwater projects in a developing countries; Ghana as a case study’, International Journal of Project Management, vol. 21, pp. 321-326. Fortune, J. and White, D. (2006), ‘framing of project critical success factors by a systems model’, International Journal of Project Management, vol. 4, pp. 53-65 Gameson, R.N. (1991), ‘Clients and Professionals: the interface’, cited in: Barret, P. and Males, R. (1991), ‘Practice Management’, London: E & FN SPON. Gill, J. and Johnson, P. (2010), ‘Research Methods for Managers’, Thousand Oaks, California, SAGE Publication.. Glass, R.L. (1999), ‘Evolving a New Theory of Project Success’, Communications of the ACM, vol. 42, no. 11, pp. 17-19. Green, S.D. (1999), ‘The missing arguments of lean construction’, Construction Management and Economics, vol. 17, no. 2, pp. 133-137. Griffin, A. and Page, A.L. (1996), ‘PDMA Success Measurement Project: Recommended Measures for Product Development Success and Failure’, Journal of Product Innovative Management, vol. 13, pp. 478-496. GTKP (2013), ‘Road projects: How does construction occur?’, available at: http://www.gtkp.com/themepage.php&themepgid=265, [accessed: 05/07/2013] Hallgren, M. and Wilson, T.L. (2008), ‘The nature and management of crises in construction projects: Project-as-practice observations’, International Journal of Project Management, vol. 26, pp. 830-838. Hamilton, A. (2002), ‘considering value during early project development: a product case study’, International Journal of Project Management, vol. 20, pp. 131-136. Harris, F. and McCaffer, R. (2006), “Modern Construction Management”, Oxford, Blackwell Hertford, R.D. (2008), “Innovative ICT Projects, Web Based Learning and Support for the Construction Industry”, Hertford Regional College. Hill, R.C. and Bowen, P.A. (1997), ‘Sustainable construction: principles and a framework for attainment’, Construction Management and Economics, vol. 15, pp. 223-239. Holti, R., Nicolini, D. and Smalley, M. (2002), ‘Building Down Barriers: The handbook of supply chain management’, The Essentials, CIRM, London. Hughes, S.W., Tippett, D.D, and Thomas, W.K. (2004), ‘Measuring Project Success in the Construction Industry’, Engineering Management Journal, vol. 16, no. 3, pp. 31-37. Huang, Z., Poli, M. and Mithiborwala, H.S. (2009), ‘Project Strategy: Success Themes for Strategic Projects’, Management of Engineering and Technology, PICMET, pp. 1282-1289. Iizuka, Y. (2004) [online], “A New QMS Model and Its Application”, available at: http://www.inlac.org.co/web/images/stories/biblioteca/presentacionmexico.pdf?php.. [accessed: 19.10.2013] International Business (2008) [online], ‘International Business Vietnam, Market Report 2007/2008’, available at: org.ntnu.no/internationalbusiness/Former/Vietnam_Raport.pdf, [accessed: 20/02/2010] Iskandar, B.Y., Kurokawa, S. and LeBlanc, L. J. (2001), ‘Adoption of electronic data interchange: the role of buyer-supplier relationships’, IEEE Transactions on Engineering Management, vol. 48, no. 4, pp. 505-517. Jeffrey, J.R. (2004), “Strategic Alliances”, Oxford: University Press. Jill Wells. (2014), ‘Corruption and Collusion in Construction: A view from the industry’, In T. Søreide and A. Williams (Eds.) ‘Corruption, Grabbing and Development: Real World Challenges’, Cheltenham, UK and Northampton, MA, USA: Edward Elgar Publishing. John, C. and David, F. (1998), “Strategic of Co-operation: Managing Alliances, Networks, and Joint Venture”, Oxford: University Press. Johnson, R.B., Onwuebuzie, A.J. and Turner L.A. (2007), ‘Toward a definition of Mixed Methods Research’, Journal of Mixed Methods Research, vol. 1, no. 2., pp. 112-133. Johnson, G., School, K. and Whittington, R. (2005), “Exploring Corporate Strategy”, Prentice Hall. Kagioglou, M., Cooper, R. and Aoad, G. (2001), ‘Performance management in construction: a conceptual framework’, Construction Management and Economics, vol. 19, pp. 85-95. Kamata, M.I. and Tamai, T. (2007), ‘How does requirements quality relate to project success or failure’, 15th IEEE International Requirements Engineering Conference. Kelly, J., Male, S. and Graham, D. (2004), ‘Value management of construction projects’, Blackwell Science Ltd, Oxford, UK Kendra, K. and Taplin, L.J. (2004), ‘Project Success: A Cultural Framework’, Project Management Journal, vol. 35, no. 1, pp. 30-45. Keng, T.C. and Hamzah, A.R. (2011), ‘Study of Quality Management in Construction projects’, Chinese Business Reviews, ISSN 1537-1506, vol. 10, no. 7, pp. 542-552. Kinsey, J. (2000), ‘A faster, learner, supply chain: new uses of information technology’, Am Agric Economic, vol. 82, no. 5, pp. 1123-1129. Koelmans, R.G. (2004), ‘Project success and performance evaluation’, International Platinum Conference ‘Platinum Adding Value’, pp. 229-236. Kometa, S.T., Olomolaiye, P.0. and Harris, F. C (1994), ‘Attributes of UK construction clients influencing project consultants' performance’, Journal of Construction Management and Economics, vol. 12, pp 433-443. Koskela, L. (1992), ‘Application of the New Production Philosophy to Construction’, Technical Report No. 72, Centre for Integrated Facility Engineering, Standford University, CA. Koskela, L. (2000), ‘An exploring towards a production theory and its application to construction’, VTT Building Technology. Espoo: VTT Publications. Koskela, L. (2004), ‘Moving-on - beyond lean thinking’, Lean construction Journal, vol. 1, pp. 24-37. Koskela, L. and G. Howell (2002), ‘The underlying theory of Project Management is obsolete’. PMI Research Conference: 293-302. Koskela, L. and G. A. Howell (2002), ‘The theory of project management - Explanation to Novel Methods’, 10th International Group for Lean Construction Conference. Gramada, Brazil. Kulatunga, U., Amaratunga, D. and Haigh, R. (2009), ‘Critical success factors of construction research and development’, Construction Management and Economics, vol. 27, pp. 891-900. Kumaraswamy, M.M. and Dissanayaka, S.M. (2001), ‘Developing a decision support system for building project procurement’, Building and Environment, vol. 36, pp. 337-349. Kumaraswamy, M.M. and Zhang, X.Q. (2001), ‘Governmental role in BOT-led infrastructure development’, International Journal of Project Management, vol. 19, pp. 195-205. Kumaraswamy, M.M. and Dissanayaka, S.M. (1998), \"Linking procurement systems to project priorities\", Building Research and Information, vol. 26, no. 4, pp. 223-38. Kumaraswamy, M.M., Love, P.E.D., Dulaimi, M. and Rahman, M. (2004), ‘Integrating procurement and operational innovations for construction industry development’, Engineering, Construction and Architectural Management, vol. 11, no. 5, pp. 323–334 Kuruoglu, M. and Ergen, E. (2000), ‘The effects of economic development on project management in developing countries’, 2nd International Conference on Construction in Developing Countries: Challenges facing the construction industry in developing countries, November 15-17, Gabarone, Botswana, available at: http://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.202.9573&rep=rep1&type=pdf, [accessed: 02/08/2011] Kwak, Y.H. (2002), ‘Critical Success Factors in International Development Project Management’, CIB 10th International Symposium Construction Innovations & Global Competitiveness, Cincinnati, Ohio, USA. Lamming, R. (1996), ‘Squaring the lean supply with supply chain management’, International Journal of Operations and Production Management, vol. 16, no. 2, pp. 183-196. Langford, D. and Male, S. (2001), “Strategic management in Construction”, Oxford: Blackwell Science. Langford, D., Fellows, R. and Newcombe, R. (2001), “Construction Management in Practice”, Sydney Urry: Blackwell Publishing. Laufer, A., Denker, G.R. and Shenhar, A.J. (1996), “Simultaneous management: the key to excellence in capital projects”, International Journal of Project Management, Vol. 14 No. 4, pp. 189-99, cited in Nguyen et al. (2004). Larson, E. (1997), ‘Partnering on Construction Projects: A Study of the Relationship Between Partnering Activities and Project Success’, IEEE Transactions on Engineering Management, vol. 44, no. 2, pp. 188-195. Le, H.L., Lee, Y.D. and Lee, J.Y (2008), ‘Delay and Cost Overruns in Vietnam Large Construction Projects: A Comparison with Other Selected Countries’, Journal of Civil Engineering, December 2008, Volume 12, Number 6, pp. 367 – 377. Le, H.Q. and Ruppel, U. (2009), ‘Multi-site construction project scheduling considering resource moving time in developing countries’, 18th International Conference of the Application of Computer Science and Mathematics in Architecture and Civil Engineering, Weimar, Germany. Lee, S.M and Peterson, S.J (2000), ‘Culture, entrepreneurial orientation, and global competitiveness’, Journal of World Business, vol. 35, issue. 4, pp. 401-416. Leshem, S. and Trafford, V. (2007), ‘Overlooking the conceptual framework’, Innovations in Education and Teaching International, vol. 44, no. 1, pp. 93-105. Leung, M.Y. and Liu, A.M.M. (2003), ‘Analysis of value and project goal specificity in value management’, Construction Management and Economics, vol. 21, pp. 11-19. Levy, P., Bessant, J., Sang, B. and Lamming, R. (1995), ‘Developing integration through total quality supply chain management’, Integrated Manufacturing Systems, vol. 6, no. 3, pp. 4-12. Levy, S.M. (2002), ‘Project Management in Construction’, New York: McGraw-Hill. Lim, C.S and Mohamed, M.Z (1999), ‘Criteria of project success: an exploratory re-examination’, International Journal of Project Management, vol. 17, no. 4, pp. 243-248. Ling, Y.Y. and Bui, T.T.D. (2010), ‘Factors Affecting Construction Project Outcomes: Case Study of Vietnam’, Journal of Professional Issues in Engineering Education and Practice, vol 136, no. 3, pp. 148-155. Lipovetsky, S., Tishler, A., Dvir, D. and Shenhar, A. (1997), ‘The relative importance of project success dimensions’, R&D Management, vol. 27, no. 2, pp. 97-106. Liu, A.M.M. and Walker, A. (1998), ‘Evaluation of project outcomes’, Construction Management and Economics, vol. 16, pp. 209 – 219. London, K. (2008), “Construction Supply Chain Economics”, Abingdon: Taylor & Francis. Loraine, R.K. (1992) “Construction management in developing countries”, Heron Quay, London: Thomas Telford. Louzolo-Kimbembe, P. and Pettang, C. (2006), ‘A new approach for construction planning in the developing countries: the sub-structure chaining diagram (sscd)’, Journal of Construction Research, vol. 7, no. 1&2, pp. 159-176. Love, P.E.D., Skitmore, R.M. and Earl, G. (1998), ‘Selecting a suitable procurement method for a building project’, Construction Management and Economics, vol. 16, no. 2, pp. 221-233. Love, P.E.D., Li, H., Irani, Z. and Faninan, O. (2000), ‘Total quality management and the learning organisation: a dialogue for change in construction’, Construction Management and Economics, vol. 18, pp. 321-331. Love, P.E.D., Holt, G.D. and Li, H. (2002), ‘Triangulation in construction management research’, Engineering, Construction and Architectural Management, vol. 9, no. 2, pp. 294-303 Low, S. P. and Omar, H. F. (1997), “The effective maintenance of quality management systems in the construction industry”, International Journal of Quality & Reliability Management, vol. 14, issue: 8, pp. 768-790. Lowery, C. (2001), ‘Ethnography Research Methods’, in Thyer, B.A. (2001), ‘The handbook of social work research methods’, Thousand Oaks, California, SAGE Publication. Luu, D.T. and Ng, S.T. and Chen, S.E. (2003), ‘A case-based procurement advisory system for construction’, Journal of Advances in Engineering Software, vol. 34, pp. 429-438. Marco, A.D., Briccarello, D. and Rafele, C. (2009), ‘Cost and Schedule Monitoring of Industrial Building Projects: Case Study’, Journal of Construction Engineering and Management, vol. 135, no. 9, pp. 853-862. Marwanga, R.O., Nyangara, F.M. and Deleveaux, V.J. (2006), ‘An Investigation of Project Success for Engineering and Technology-Based Projects in Developing Countries’, Technology Management for the Global Future, PICMET, pp. 2311-2321. McElroy, B. and Mills, C. (2000), ‘Managing stakeholders’, cited in Turner, J.R. and Simister, J.S. (2000), ‘Gower Handbook of Project Management’, Gower Publishing Limited, Hampshire, pp. 757–775. MGI (McKinsey Global Institute) (2012) [online], ‘Sustaining Vietnam’s growth: The productivity challenge’, available at: http://www.mckinsey.com/insights/asia-pacific/sustaining_growth_in_vietnam, [accessed: 06/03/2014]. McQueen, R.A. and Knussen, C. (2002), ‘Research methods for social science: an introduction’, Edinburgh Gate, Pearson Education Limited. Meyer, A.D, Loch, C.H. and Pich, M.T. (2002), ‘managing project uncertainty: from variation to chaos’, MIT Sloan Management Review, vol. 43, no. 2, pp. 60-67 Morris, P.W.G. (1997), ‘The Management of Project’, 2nd eds, London: Thomas Telford. Mohamed, S. (2003), ‘Performance in International Construction Joint Ventures: Modelling Perspective’, Journal of Construction Engineering and Management, vol. 129, no. 6, pp. 619-626 Munns, A.K. and Bjeirmi, B.F. (1996), ‘The role of project management in achieving project success’, International Journal of Project Management, vol. 14, no. 2, pp. 81-87. Murray, M., Arif, A. and Lai, A. (2004), “Possibilities for ICT incorporation in a Construction Management course”, CIBWorld. Murray M. & Lai, A. (2001), “The management of construction projects using web sites”. 2nd Worldwide ECCE Symposium, Espoo, Finland, Symposium Report: Information and Communication Technology (ICT) in the Practice of Building and Civil Engineering, pp 163-168. Cited in Murray et al (2004). Naoum, S. G. (1998), ‘Dissertation Research and Writing for Construction Students’, Oxford: Butterworth-Heinemann Nguyen, D.L, Ogunlana, S.O and Do, T.X.L (2004), ‘A study on project success factors in large construction projects in Vietnam’, Engineering, Construction and Architectural Management, Volume 11, Number 6, 2004, pp 404 – 413. Nguyen, N.H., Skitmore, M. and Wong, J.K.W (2009), ‘Stakeholder impact analysis of infrastructure project management in developing countries: a study of perception of project managers in state-owned engineering firms in Vietnam’, Construction Management and Economics, Vol. 27, pp 1129 – 1140. Nguyen, H.V. and Meyer, K.E. (2005), ‘Foreign Investment Strategies and Sub-national Institutions in Emerging Markets: Evidence from Vietnam’, Journal of Management Studies, Vol. 42, Issues. 1, pp. 63-93. Nguyen, T.V. (2000), ‘Construction Process in Vietnam’, Reflection of ICM 2000. Nogales, A. (2004) [online], ‘Vietnam: transport sector brief’’, available at: www.worldbank.org/transport/transportresults/.../vietnam-tran-brief.pdf, [accessed: 20/02/2010] Ofori, G. (2007), ‘Guest Editorial Construction in Developing Countries’, Construction Management and Economics, vol. 25, pp.1-6. Ofori, G. (2000), ‘Challenges of Construction Industries in Developing Countries: Lessons from Various Countries’, in Ngowi, A.B. and Ssegawa, J. (eds), Challenges facing the construction industry in developing countries, Proceedings, Second International Conference of CIB Task Group 29, 15–17 November, National Construction Industry Council, University of Botswana, and CIB, Gaborone, pp. 1–11. Ofori, G. (1997), ‘Sustainable construction: principles and a framework for attainment – comment’, Construction Management and Economics, vol. 16, pp.141-145. Ofori, G., Dulaimi, M.F. and Ling, F.Y.Y. (2004), ‘Improving Performance of Construction Industry in Singapore: Motivators, Enablers and Lessons for Developing Countries’, Journal of Construction Research, vol. 5, no. 2, pp. 267-289. Office of Government Commerce (OGC) (2005) [online], ‘Common Causes of Project Failure’, available at: https://www.swan.ac.uk/media/cp0015.pdf, [accessed: 18/02/2011] OGN (2007), ‘Project procurement lifecycle, the integrated process’, Office of Government Commerce, Great Peter Street, London, UK Ogunlana, S.O., Promkuntong, K. and jearkjirm, V. (1996), ‘Construction delays in a fast-growing economy: comparing Thailand with other economies’, International Journal of Project Management, vol. 14, no. 1, pp. 37-45. Parfitt, M.K. and Sanvido, V.E. (1993), ‘Checklist of critical success factors for building projects’, Journal of Management in Engineering, vol. 9, pp. 243-249. Patton, M.Q. (2002), ‘Qualitative Research and Evaluation Methods’, Thousand Oaks, SAGE Publications Pesamaa, O., Eriksson, P.E. and Hair, J.F. (2009), ‘Validating a model of cooperative procurement in the construction industry’, International Journal of Project Management, vol. 27, pp. 552-559. Pham, V.B. (2008) [online], ‘Improvement of the productivity of the construction sector in Vietnam’, available at: www.asiaconst.com/past_conference/conference/.../03Vietnam.pdf, [accessed: 20/02/2010] Phan, T.M. and Luu, H.V. (2012) [online], ‘Vietnam Country Report’, available at: http://www.asiaconst.com/past_conference/conference/18th/Vietnam.pdf, [accessed: 06/03/2014]. Phelan, T.M. (2004), ‘The Impact of Effectiveness and Efficiency on Project Success’, Steven Institute of Technology, Hoboken, NJ, USA, pp. 381-391. Piercy, N. F. and Morgan, N. A. (1997), ‘the impact of lean thinking and lean enterprise on marketing: threat or synergy?’ Journal of Marketing and Management, vol. 13, no. 7, pp. 679-694. Pietroforte, R. (1997), “Building International Construction Alliances: Successful Partnering for Construction Firms”, London: E & FN Spon. Pinto, J.K. and Covin, J.G. (1989), ‘critical factors in project implementation: a comparison of construction and R&D projects’, Technovation, vol. 9, pp. 49-62. Pinto, J.K. and Mantel, S.J. (1990), ‘The cause of project failure’, IEEE Transactions of Engineering Management EM, vol. 37, no. 4, pp. 269-276 Pinto, J.K. and Prescott, J.E. (1988), ‘Variations in Critical Success Factors Over the Stages in the Project Life Cycle’, Journal of Management, vol. 14, no. 1, pp. 5-18. Pinto, J. K. and Slevin, D. P. (1994), ‘the Project Implementation Profile: An International Perspective’, cited in Cleland, D.I. and Gareis, R. (1994), Global Project Management Handbook, Singapore: McGraw-Hill, pp. 27-1 - 27-27. Pinto, J.K. and Slevin, D.P. (1987), ‘Critical Success Factors in Effective Project Implementation’, cited in ‘Project Management Handbook’, edited by Cleland, D.I. and King, W.R. (1988), New York: Van Nostrand Reinhold, pp. 479-512. Pinto, J.K. and Slevin, D.P. (1987), ‘Critical factors in successful project implementation’, IEEE Transactions on Engineering Management, vol. 34, no. 1, pp. 22-27. Poli, M. and Shenhar, A.J. (2003), ‘Project Strategy: The Key to Project Success’, Management of Engineering and Technology, PICMET, pp. 231-235. Project Management Institute (PMI) (1996), ‘A Guide to the Project Management Body of Knowledge’, PA: Project Management Institute, USA. Project Management Institute (PMI) (2004), ‘A Guide to the Project Management Body of Knowledge’, 3rd Edition, PA: Project Management Institute, USA. Project Management Institute (PMI) (2008), ‘A Guide to the Project Management Body of Knowledge’, 4th Edition, PA: Project Management Institute, USA. Punch, K.F. (2000), ‘Developing effective research proposal’, London, Sage. Pylkas, L., Neal, S.R, Madni, K. I. (2002), ‘Smart Value Engineering’, AACE International Transactions, pp. 161-164. Qiao, L., Wang, S.Q., Tiong, R.L.K. and Chan, T.S. (2001), ‘Framework for Critical Success Factors of BOT Projects in China’, The Journal of Project Finance, vol. 7, no. 1, pp. 53 – 61. Rad, P.F. (2003), ‘Project Success Attributes’, Cost Engineering, vol. 45, no. 4, pp. 23-29. Radujkovic, M. (1996), ‘Risk management: maintaining programmed construction time in economics in transition. The Organisation and Management of Construction: Shaping theory and practice’ (Volume 2), London: F& FN Spon Raftery, J., Pasadilla, B., Chiang, Y.H., Hui, E.C.M. and Tang, B.S. (1998), ‘Globalisation and construction industry development: implications of recent developments in the construction sector in Asia’, Construction Management and Economics, vol. 16, pp. 729-737. Raz, T., Shenhar, A.J., and Dvir, D. (2002), ‘Risk management, project success, and technological uncertainty’, R & D Management, vol. 32, no. 2, pp. 101-109. Remenyi, D., Williams, B., Money, A. and Swartz, E. (1998), ‘Doing Research in Business and Management: An Introduction to Process and Method’, London: SAGE Publications Ltd. Riedel, J. and Turley, W.S. (1999), ‘The Politics and Economics of Transition to an Open Market Economy in Vietnam’, Major Regions and Large Countries, OECD Development Centre. RnR (ReportsnReports) (2013) [online], ‘Construction in Vietnam - Key trend and Opportunities to 2017’, available at: http://www.reportsnreports.com/reports/256112-construction-in-vietnam-key-trends-and-opportunities-to-2017.html, [accessed: 07/03/2014] Rockart, J. F. (1982), ‘The Changing Role of the Information Systems Executive: A Critical Success Factors Perspective’, Sloan Management Review, 24, pp. 3-13. Rosenau, Jr. M.D. and Githens, G.D. (2005), ‘Successful Project Management’, john Wiley & Sons, Inc., Hoboken, New Jersey. Rounds, J. and Chi, N. (1985), ‘Total Quality Management for Construction’, Journal of Construction Engineering and Management, vol. 111, no. 2, pp. 117–128. Runeson, G. and Skitmore, M. (2008), ‘Scientific Theories’, in Knight, A. and Ruddock, L. (2008), ‘Advanced Research Methods in the Built Environment’, Chichester, Blackwell Publishing Ltd. Sambasivan, M. and Soon, Y.W. (2007), ‘Causes and effects of delays in Malaysian construction industry’, International Journal of Project Management, vol. 25, pp. 517-526. Sanvido, V., Grobler, F., Parfitt, K., Guvenis, M. and Coyle, M. (1992), ‘Critical Success Factors for Construction Projects’, Journal of Construction Engineering and Management, vol. 118, no. 1, pp. 94-111. Sawacha, E., Naourn, S. and Fong, D. (1999), ‘Factors affecting safety performance on construction sites’, International Journal of Project Management, vol. 17, no. 5, pp. 309-315. Shenhar, A.J., Dvir, D., Levy, O. And Maltz, A.C. (2002), ‘Project Success: A Multidimensional Strategic Concept’, Long Range Planning Journal, vol. 34, pp. 699-725. Shenhar, A.J., Dvir, D. and Levy, O. (1997), ‘Mapping the dimensions of project success’, Project Management Journal, vol. 28, no. 2, pp. 5-13. Shenhar, A.J., Poli, M. and Lechler, T. (2000), ‘A new framework for strategic project management’, cited in ‘Management of Technology VIII’ by Khalil, T. (2000), University of Maimi, FL. Shenhar, A.J. and Wideman, R.M. (2002), ‘Optimizing Success by matching Management Style to Project Type’, AEW Services, Vancouver, available at: www.maxwideman.com/papers/success/success.pdf [accessed: 16/03/2010]. Shenhar, A.J., Renier, J.J. and Wideman, R.M. (1996), ‘Improving PM: Linking Success Criteria to Project Type’, paper presented to the Southern Alberta Chapter ‘Creating Canadian Advantage through Project Management’, Symposium Calgary, Project Management Institute. Shen, Q. and Liu, G. (2003), ‘Critical success factors for Value Management Studies in Construction’, Journal of Construction Engineering and Management, vol. 129, no. 5, pp. 485-491. Shenhu, Z. and Akintoye, A. (2010), ‘Major challenges to the successful implementation and practice of programme management in the construction environment: A critical analysis’, International Journal of Project Management, vol. 28, pp. 26-39. Slevin, D.P. and Pinto, J.K. (1986), ‘The project implementation profile: new tool for project managers’, Project Management Journal, vol. 18, pp. 57-71. Smyth, H. J. and Morris, P.W.G. (2007), ‘An epistemological evaluation of research into projects and their management: Methodological Issues’, International Journal of Project Management, vol. 25, pp. 423-436. Songer, A.D. and Molenaar, K.R. (1997), ‘Project Characteristics for Successful Public-Sector Design-Build’, Journal of Construction Engineering and Management, vol. 123, no. 1, pp. 34-40. Soy, S. K. (1997), ‘The Case Study as a Research Method’, Unpublished paper. Austin, University of Texas, Austin. Spekknink, D. (1995), ‘Architect’s and consultant’s quality management system: State of Art quality management in architectural and consulting engineering practices in the Netherland with highlight of some aspects in Norway, Finland and Sweden’, Building Research and Information, vol. 23, no. 2, pp. 97-105. Spekman, R.E., Kamauff Jr, J. W. and Myhr, N. (1998), ‘an empirical investigation into Supply chain management: a perspective on partnerships’, International Journal of Physical Distribution and Logistics Management, vol. 28, no. 8, pp. 630-650. Stannack, P. (1995), ‘Building organisational communities: the role of purchasing and supply chain management’, Cited in: Kemp, FLA. and Lamming, R. C. (eds), Proceedings for the First Worldwide Research Symposium on Purchasing and Supply Chain Management, Arizona State University, Tempe, USA Strauss, A. and Corbim, J. (1998), ‘Basics of Qualitative Research: Techniques and Procedures for Developing Grounded Theory’, Thousand Oaks, California, SAGE Publications. Stewart, R.A. and Mohamed, S. (2003), ‘Evaluating the value IT adds to the process of project information management in construction’, Journal of Automation in Construction, Elsevier Science, vol. 12, no. 4, pp. 407-417. Study Mode (SM) (2011) [online], ‘Logical Structure, Theoretical Framework’, available at: http://www.studymode.com/essays/Logical-Structure-Or-Theoretical-Framework-748230.html, [accessed: 18/02/2011]. Tam, C.M. (1999), ‘Build-operate-transfer model for infrastructure development in Asia: reasons for successes and failures’, International Journal of Project Management, vol. 17, no. 6, pp. 377-382. Takim, R. (2005), ‘A framework for successful construction performance’, PhD Thesis, Glasgow Caledonian University Takim, R. (2009), ‘The Management of Stakeholders’ Needs and Expectations in the Development of Construction Project in Malaysia’, Modern Applied Science, CCSE Journal, vol. 3, no. 5, pp. 167-175. Takim, R. and Adnan, H. (2008), ‘Analysis of Effectiveness Measures of Construction Project Success in Malaysia’, Asian Social Science, CCSE Journal, vol. 4, no. 7, pp. 74-89. Tashakkori, A. and Teddlie, C. (2003), ‘Handbook of Mixed Methods in Social and Behavioural Research’, Thousand Oaks, California, SAGE Publications Teo, E.A.L., Ling, F.Y.Y. and Chong, A.F.W. (2005), ‘Framework for project managers to manage construction safety’, International Journal of Project Management, vol. 23, pp. 329-341. Teare, R., Munro-Faure, L., Munro-Faure, M., Scheuing, E. and Bowen, J.T. (1999), ‘Modelling team structures: a grounded approach’, International Journal of Service Industry Management, vol. 10, no. 4, 1999, pp. 380-392. Thanhnien (2008) [online], ‘Vietnam inflation likely to ease, JPMorgan, HSBC say’, available at: http://www.thanhniennews.com/business/?catid=2&newsid=39778, [accessed: 20/02/2010] Thanhnien (2013) [online], ‘Crunch time as Vietnam set for education shakeup, again’, available at: http://www.thanhniennews.com/index/pages/20131114-crunch-time-as-vietnam-set-for-education-shakeup-again.aspx, [accessed: 02/12/2013] Thomas-Cain, C. (2004), “Profitable Partnering for Lean Construction”, Oxford: Blackwell. Thompson, A. A. and Strickland, A. J. (1990), “Strategic Management: Concept and Cases”, Irwin: Homewood Ill. Thorpe, B. and Sumner, P. (2004), ‘Quality Management in Construction’, Gower Publishing. Tiong, R.L.K., Yeo, K.T. and McCarthy, S.C. (1992), ‘Critical success factors in winning BOT contracts’, Journal of Construction Engineering and Management, vol. 118, no. 2, pp. 217-28. Truong, Q., Nguyen, D.L, Ogunlana, S. and Lam, K.C. (2004), ‘Large construction projects in developing countries: a case study from Vietnam’, International Journal of Project Management, Volume 22, pp 553 – 561. Truong, Q., Swierczek, F.W., and Dang, T.K.C. (1998), ‘Effective leadership in joint ventures in Vietnam: a cross-cultural perspective’, Journal of Organizational Change Management, vol. 11, no. 4, pp. 357-372. Truong, V.L., Kim, S.Y., and Huynh, T.A. (2008), ‘Improving project management performance of large contractors using benchmarking approach’, International Journal of Project Management, vol. 26, pp. 758-769 Truong, V.L., Kim, S.Y., Cao, H.L., and Park, Y.M. (2008), ‘Performance measurement of construction firms in developing countries’, Construction Management and Economics, vol. 26, pp. 373-386. Torrington, D. and Weightman, J. (1994), “Effective Management: People and Organization”, Hertfordshire: Prentice Hall. Toor, S.R. and Ogunlana, S.O. (2008), ‘Critical COMs of success in large-scale construction projects: Evidence from Thailand construction industry’, International Journal of Project Management, vol. 26, pp. 420-430. Toor, S.R. and Ogunlana, S.O. (2010), ‘Beyond the “iron triangle”: Stakeholder perception of key performance indicators (KPIs) for large scale public sector development projects’, International Journal of Project Management, vol. 28, pp. 228-236. Tse, R.Y.C. and Love, P.E.D. (2003), ‘An economic analysis of the effect of delays on project costs’, Journal of Construction Research, vol. 4, no. 2, pp. 155-160. Uyen, T. (2003) [online], ‘Construction losses headache’, Vietnamnet, available at: http://english.vietnamnet.vn/news/2003/11/18321, [accessed: 18/02/2010] Vardy, N. (2007) [online], ‘The next China: Five Emerging Markets to Watch’, Seeking Alpha, available at: http://seekingalpha.com/article/39198-the-next-china-five-emerging-markets-to-watch, [accessed: 20/02/2010] Vickridge, I. (2002), ‘Project Management in Developing Countries’, in N.J. Smith (2002), ‘Engineering Project Management’, Blackwell Publishing Ltd, Oxford, UK Vietbao (2007) [online], ‘World Bank President: Vietnam is a right place for investment’, available at: http://vietbao.vn/Chinh-Tri/Chu-tich-WB-Viet-Nam-la-mot-dia-chi-dau-tu-dung/20727223/96/, [accessed: 20/02/2010] Vietnamnet (2008) [online], ‘Goldman Sachs: high inflation the biggest problem now for Vietnam’, Vietnamnet Bridge, available at: http://english.vietnamnet.vn/biz/2008/05/784420/, [accessed: 20/02/2010] Wang, S.Q., Dulaimi, M.F. and Aguria, M.Y. (2004), ‘Risk management framework for construction projects in developing countries’, Construction Management and Economics, vol. 22, pp. 237-252. Ward, C., Curtis, B., and Chapman (1991), ‘Objective and performance in construction projects’, Journal of Construction Management and Economics, vol. 9, pp 343-353 Ward, S. C. and Chapman, C. B. (1995), ‘Risk-management perspective on the project life cycle’, International Journal of Project Management, vol. 13, no. 3, pp. 145-149 Watson, Farley and Williams (2009) [online], ‘Infrastructure Development in Vietnam’, available at: www.wfw.com, [accessed: 20/02/2010] Westerveld, E. (2003), ‘The Project Excellent Model: linking success criteria and critical success factors’, International Journal of Project Management, vol. 21, pp. 411-418. Westhuizen, V.D. and Fitzgerald, E.P. (2005), ‘Defining and measuring project success’, In: European Conference on IS Management, Leadership and Governance, 07-08 Jul 2005, Reading, United Kingdom. Winch, G.M (2001), ‘Governing the project process: a conceptual framework’, Construction Management and Economics, vol. 19, pp. 799-808. Winter, M., C. Smith, P. Morris and S. Cicmil (2006), ‘Directions for future research in project management: The main findings of a UK government-funded research network.’ International Journal of Project Management, vol. 24, no.8, pp. 638-649. Wong, A. and Fung, P. (1999), ‘Total quality management in the construction industry in Hong Kong: a supply chain management perspective’, Total Quality Management, vol. 10, no. 2, pp. 199-208. World Bank (2000) [online], ‘Fighting corruption in Vietnam report’, available at: www.worldbank.org.vn, [accessed: 10/11/2009] World Bank (2003) [online], ‘Issues and Dynamics: Urban Systems in Developing East Asia’, available at: http://siteresources.worldbank.org/INTEAPREGTOPURBDEV/Resources/Philippines-Urbanisation.pdf, [accessed: 29/10/2009] World Bank (2009) [online], ‘Improvement of social and economics of Vietnam report’, available at: www.worldbank.org.vn, [accessed: 10/11/2009] Yang, C.P (2006), ‘Factors affecting the performance of public projects in Taiwan’, Journal of Construction Research, vol. 17, no. 1&2, pp. 207-225. Yang, J., Shen, G.Q., Drew, D.S. and Ho, M. (2010), ‘Critical success factors for stakeholder management: construction practitioners’ perspectives’, Journal of Construction Engineering and Management, vol. 136, no. 7, pp. 778-786. Yeo, K.T. (1995), ‘Planning and learning in major infrastructure development: system perspectives’, International Journal of Project Management, Vol. 13, no. 5, pp. 287-293. Yu, A.G., Flett, P.D. and Bowers, J.A. (2005), ‘Developing a value-centred proposal for assessing project success’, International Journal of Project Management, vol. 23, pp. 428-436. Zee Pedia (ZP) (2011) [online], ‘Theoretical framework’, available at: http://www.zeepedia.com/read.php?theoretical_framework_make_an_inventory_of_variables_research_methods&b=71&c=10, [accessed: 18/02/2011]. Zhang, X. (2005), ‘Critical Success Factors for Public-Private Partnerships in Infrastructure Development’, Journal of Construction Engineering and Management, vol. 131, no. 1, pp. 3-14. Zwikael, O. and Globerson, S. (2006), ‘from critical success factors to critical success processes’, International Journal of Production Research, vol. 44, no. 17, pp. 3433-3449."]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"dc:type.qualificationlevel","label":"Dc Type Qualificationlevel","values":["doctoral"]},{"key":"dc:type.qualificationname","label":"Dc Type Qualificationname","values":["Ph.D"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.dcterms_iso639_2","label":"Language (ISO 639-2)","values":["eng"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["uk.bl.ethos.689300"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://etheses.whiterose.ac.uk/id/eprint/13531/2/The%20Thesis%20.pdf"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Despite having incentives and generous investments from the government, many public infrastructure projects in Vietnam have been poorly finished with time delays, cost overruns and improper quality standard. These adversely influence the country’s socioeconomic development and modernisation process. However, there has not been an appropriate strategy to cope with and a lack of research into how to do so. The aim of this thesis is to develop and propose a sound solution to manage and deliver public transport development projects in Vietnam more successfully. There are five main elements which have very strong influences on the achievement of project success, namely: Critical Success Factors, Success Criteria, Key Stakeholders, Project Process and Severe Problems. Nevertheless, previous studies looked at them individually or as a pair only, while discretely recognised their connections during the management and implementation process. This research argues that those elements and their links should be viewed holistically and combined together in order to achieve a complete picture of project success. Having established this, a lifecycle based framework is developed and used to serve as a lens for the empirical analysis. The thesis has found out that traditional delivery route is still widely used and favoured in Vietnamese public transport development projects with complicated involvements of many parties. The government still plays a dominant role which has the greatest influences on project outcomes. Meanwhile, the most severe problems which project participants in the VCI have been struggling to deal with relate to finance and human. As a result, the most critical factors which can cope with those problems and achieve success also relate to finance and human. On another hand, a set of criteria for measuring overall performance and result of those projects are binding to the success of the final product and project management. In this thesis, it is the first time a framework, which simultaneously encompasses all elements of project success, has been developed. As an obvious result, it changes the way people perceive project success and how to achieve. The framework helps to fill the knowledge gaps in the literature of project management in transitional and emerging markets. It provides a clear picture of the key stakeholders involved with related activities which need to be carried out across the different phases of the project process, identifies the severe problems which need to be addressed, and provides a better understanding of the standards which are required in safeguarding project success. The validity of the framework and empirical findings of this research contribute new insights into the developing world as Vietnam is the case study. Therefore, the thesis significantly contributes to the body of knowledge of project success and construction project management."]},{"key":"dc:format","label":"Dc Format","values":["text"]},{"key":"dcterms:accessrights","label":"Dcterms Accessrights","values":["public"]},{"key":"dc:title","label":"Title","values":["Develop a framework for successfully managing public transport development projects in Vietnam"]}]}],"canonical_facts":{"dc:contributor.advisor":["Moodley, Krisen"],"dc:creator":["Vu, Thanh-Son"],"dc:date":["2016-03"],"dc:date.issued":["2016-03"],"dc:description.abstract":["Despite having incentives and generous investments from the government, many public infrastructure projects in Vietnam have been poorly finished with time delays, cost overruns and improper quality standard. These adversely influence the country’s socioeconomic development and modernisation process. However, there has not been an appropriate strategy to cope with and a lack of research into how to do so. The aim of this thesis is to develop and propose a sound solution to manage and deliver public transport development projects in Vietnam more successfully. There are five main elements which have very strong influences on the achievement of project success, namely: Critical Success Factors, Success Criteria, Key Stakeholders, Project Process and Severe Problems. Nevertheless, previous studies looked at them individually or as a pair only, while discretely recognised their connections during the management and implementation process. This research argues that those elements and their links should be viewed holistically and combined together in order to achieve a complete picture of project success. Having established this, a lifecycle based framework is developed and used to serve as a lens for the empirical analysis. The thesis has found out that traditional delivery route is still widely used and favoured in Vietnamese public transport development projects with complicated involvements of many parties. The government still plays a dominant role which has the greatest influences on project outcomes. Meanwhile, the most severe problems which project participants in the VCI have been struggling to deal with relate to finance and human. As a result, the most critical factors which can cope with those problems and achieve success also relate to finance and human. On another hand, a set of criteria for measuring overall performance and result of those projects are binding to the success of the final product and project management. In this thesis, it is the first time a framework, which simultaneously encompasses all elements of project success, has been developed. As an obvious result, it changes the way people perceive project success and how to achieve. The framework helps to fill the knowledge gaps in the literature of project management in transitional and emerging markets. It provides a clear picture of the key stakeholders involved with related activities which need to be carried out across the different phases of the project process, identifies the severe problems which need to be addressed, and provides a better understanding of the standards which are required in safeguarding project success. The validity of the framework and empirical findings of this research contribute new insights into the developing world as Vietnam is the case study. Therefore, the thesis significantly contributes to the body of knowledge of project success and construction project management."],"dc:format":["text"],"dc:identifier":["uk.bl.ethos.689300"],"dc:identifier.uri":["https://etheses.whiterose.ac.uk/id/eprint/13531/2/The%20Thesis%20.pdf"],"dc:language.dcterms_iso639_2":["eng"],"dc:publisher.commercial":["University of Leeds"],"dc:publisher.department":["School of Civil Engineering (Leeds)"],"dc:publisher.institution":["University of Leeds"],"dc:relation.isreferencedby":["https://etheses.whiterose.ac.uk/id/eprint/13531/"],"dc:relation.references":["References Adler, N.J. (1983), ‘A Typology of Management Studies Involving Culture’, Journal of International Business Studies, vol. 14, no. 2, pp. 29-47. Ahmad, I.U. and Sein, M.K. (1997),’Construction project teams for TQM: a factor-element impact model’, Construction Management and Economics, vol., 15, pp. 457-467. Akintoye, A. S. and MacLeod, M. J. (1997), ‘Risk analysis and management in construction’, International Journal of Project Management1, vol. 5, no. 1, pp. 31-38. Al-Sudairi, A. A., Dielanann, J. E., Songer, A. D. and Brown, H. M. (1999), ‘Production System Design in Construction’, Proceedings Seventh Annual Conference of the International Groupfor Lean Construction, IGLC-7, Berkeley, CA Arditi, D. and Gunaydin, H.M. (1997), ‘Total quality management in the construction process’, International Journal of Project Management, vol. 15, no. 4, pp. 235-243. Ashley, D.B., Lurie, C.S. and Jaselskis, E.J. (1987), ‘Determinants of construction project success’, Project Management Journal, vol. 18, no. 2, pp. 69-79. Assaf, A.A. and Al-Hejji, S. (2006), ‘Causes of delay in large construction projects’, International Journal of Project Management, vol. 24, pp. 349-357. Atkinson, A.A, Waterhouse, J.H. and Wells, R.B. (1997); “A Stakeholder Approach to Strategic Performance Measurement”, MIT/Sloan, Management Review, vol. 38, no. 3, pp. 25-37. Atkinson, R. (1999), ‘Project management: cost, time and quality, two best guesses and a phenomenon, it is time to accept other success criteria’, International Journal of Project Management, vol. 17, no. 6, pp. 337-342. Analytic Tech (AT) (2011) [online], ‘Elements of a theoretical framework’, available at: http://www.analytictech.com/mb313/elements.htm, [accessed: 18/02/2011]. Avison, D., Lau, F., Myers, M. and Nielsen, P.A. (1999), ‘Action Research’, Communications of the ACM, vol. 42, no. 1, pp. 94-97. Baccarini, D. (1999), ‘The Logical Framework Method for Defining Project Success’, Project Management Journal, vol. 30, no. 4, pp. 25-32. Ballard, G. and Howell, G. A. (2004), ‘Competing construction Management Paradigms’, Lean construction Journal, vol. 1, pp. 38-45. Ballard, G., Harper, N. and Zabelle, T. (2003), ‘Learning to see work flow: an application of lean concepts to precast concrete fabrication’, Engineering, Construction and Architectural Management, vol. 10, no. 1, pp. 6-14. Barry, Z.P. and Randolph, W.A. (1988), “Effective project planning and management: Getting the job done”, New Jersey: Prentice Hall. Bassioni, H.A., Prince, A.D.F. and Hassan, T.M. (2005), ‘Building a conceptual framework for measuring business performance in construction: an empirical evaluation’, Construction Management and Economics, vol. 23, pp. 495-507. Baxendale, T. and Jones, 0. (2000), ‘Construction design and management safety regulations in practice-progress on implementation’, International Journal of Project Management, vol. 18, no. 1, pp. 33-40. Bedingfield, J.D. and Thal, A.E.Jr. (2008), ‘Project Manager Personality as a Factor for success’, Portland International Conference on Management of Project, IEEE Transactions on Power Apparatus and Systems, pp. 27-31. Belassi, W. and Tukel, O.I. (1996), ‘A new framework for determining critical success/ failure factors in projects’, International Journal of Project Management, vol. 14, no. 3, pp. 141-151. Bellamy, T., William, A., Sher, W., Sherrat, D. and Gameson, R. (2008), “Preliminary examination of ICT collaborative design and management in the construction industry”, RICS. Bell, K. (1994), ‘The strategic management of projects to enhance value for money’, for BAA PLC. PhD thesis, Heriot Watt University. Belout, A. (1998), ‘Effects of human resource management on project effectiveness and success: toward a new conceptual framework’, International Journal of Project Management, vol. 16, no. 1, pp. 21-26. Belout, A. and Gauvreau, C. (2003), ‘Factors influencing project success: the impact of human resource management’, International Journal of Project Management, vol. 22, pp. 1-11. Bertelsen, S. (2004), ‘Construction Management in a Complexity Perspective’, 1st International SCRI Symposium. University of Salford, Manchester. Boussabaine, A. (2007), “Cost Planning of PFI and PPP Building Projects”, Abingdon: Taylor & Francis. Bloomberg news (2003), ‘Vietnam growth hits 7%, fastest in Southeast Asia’, International Herald Tribune, cited in Truong et al. (2004) Bloomberg news (2008), ‘Vietnam’s economy grew by a decade high in 2007’, Bloomberg, cited in Ling and Bui (2010). BOND (2003) [online], ‘Logical Framework Analysis’, available at: http://www.gdrc.org/ngo/logical-fa.pdf, [accessed: 11/03/2010]. Bourne, L. (2007), ‘Avoiding the Successful Failure’, PMI Global Congress Proceedings - Hong Kong Bourne, M., Neely, A., Platts, K. and Mills, J. (2002), ‘The Success and failure of performance measurement initiatives, Perceptions of participating managers’, International Journal of Operations and Production Management, vol. 22, no. 11, pp. 1288 – 1310. Bourne, L. and Walker, D. (2004), ‘Advancing project management in learning organizations’, The Learning Organization, vol. 11, no. 3, pp. 226–43. Boynton, A.C. and Zmud, R.W. (1984), ‘An Assessment of Critical Success Factors’, Sloan Management Review, vol. 25, no. 4, pp. 17-27. Bower, D., Ashby, G., Gerald, K. and Smyk, W. (2002), ‘Incentive Mechanisms for Project Success’, Journal of Management in Engineering, vol. 18, no. 1, pp. 37 – 43. Brown, M. (2008) [online], ‘Real Estate and Construction in Vietnam’, available at: www.mayerbrownjsm.com, [accessed: 20/02/2010] Bryde, D. (2008), ‘Perceptions of the impact of project sponsorship practices on project success’, International Journal of Project Management, vol. 26, pp. 800-809. Bryman, A. and Bell, E. (2003), ‘business research methods’, Oxford, Oxford University Press Bryman, A. and Bell, E. (2007), ‘business research methods’, Oxford, Oxford University Press Carl, H. (1994), ‘Developing and implementing a contractor safety program’, Professional Safety, vol. 39, no. 8, pp. 31-35 Castella, J.C., Kam, S.P., Dang, D.Q., Verburg, P.H. and Chu, T.H. (2007), ‘Combining top-down and bottom-up modelling approaches of land use/cover change to support public policies: Application to sustainable management of natural resources in northern Vietnam’, Land Use Policy, vol. 24, pp. 531-545. Chan, A.P.C. and Chan, A.P.L. (2004), ‘Key performance indicators for measuring construction success’, International Journal of Project Management, vol. 11, no. 2, pp. 203-221 Chan, A.P.C., Scott, D. and Chan, A.P.L. (2004a), ‘Factors Affecting the Success of a Construction Project’, Journal of Construction Engineering and Management, vol. 130, no. 1, pp. 153-155 Chan, A.P.C., Chan, D.W.M., Chiang, Y.H., Tang, B.S., Chan, E.H.W. and Ho, S.K. (2004b), ‘Exploring Critical Success Factors for Partnering in Construction Project’, Journal of Construction Engineering and Management, vol. 130, no. 2, pp. 188-198 Chan, A.P.C., Ho, D.C.K., and Tam, C.M. (2001), ‘Design and Build Project Success Factors: Multivariate Analysis’, Journal of Construction Engineering and Management, vol. 127, no. 2, pp. 93-100 Chan, A.P.C., Scott, D. and Lam, E.W.M. (2002), ‘Framework of Success Criteria for Design/Build Projects’, Journal of Management in Engineering, vol. 18, no. 3, pp. 120-128 Charmaz, K. (2001), ‘Qualitative interviewing and grounded theory analysis’, in ‘Handbook of Interview Research: Context and Method’, Sage Publication, New York. Cheah, C. Y. J. and Garvin, M. J. (2004), ‘An open framework for corporate strategy in construction’, Engineering Construction and Architectural Management, vol. 11, no. 3, pp. 176–188. Cheng, E.W.L., Li, H. And Love, P.E.D. (2000), ‘establishment of critical success factors for construction partnering’, Journal of Management in Engineering, vol. 16, no. 2, pp.84-92 Child, J. and Faulkner, D. (1998), ‘Strategic of Co-operation: Managing Alliances, Networks, and Joint Venture’, Oxford: University Press. Chinowsky, P.S. and Meredith, E.M (2000), ‘Strategic Management in Construction’, Journal of Construction Engineering and Management, vol. 126, no. 1, pp. 1-9. Chua, D.K.H., Kog, Y.C. and Loh, P.K. (1999), ‘Critical Success Factors for Different Project Objectives’, Journal of Construction Engineering and Management, vol. 125, no. 3, pp. 142-150. Chua, D.K.H, Wang, Y. and Tan, W.T. (2003), ‘Impacts of Obstacles in East Asian Cross-Border Construction’, Journal of Construction Engineering and Management, vol. 129, no. 2, pp. 131-141. Clarke, A. (1999), ‘A practical use of key success factors to improve the effectiveness of project management’, International Journal of Project Management, vol. 17, no. 3, pp. 139-145 Crawford, L. (2000), ‘Profiling the Competent Project Manager’, in: Project Management Research at the Turn of the Millennium: Proceedings of PMI Research Conference, 21-24 June, 2000, Paris, France, pp. 3-15. Sylva, NC: Project Management Institute. Creswell, J.W. (2009), ‘Research Design: Qualitative, Quantitative, and Mixed Methods Approaches’, California: Sage publications, Inc. Collins, A. and Baccarini, D. (2004), ‘Project Success – A Survey’, Journal of Construction Research, vol. 5, no. 2, pp. 211-231. Constructing Excellent (2014) [online], ‘Value Management’, available at: http://www.constructingexcellence.org.uk/pdf/fact_sheet/value.pdf, [accessed: 05/01/2014] Constructing Excellent (2014) [online], ‘Lean Construction’, available at: http://www.constructingexcellence.org.uk/pdf/fact_sheet/lean.pdf, [accessed: 05/01/2014] Constructing Excellent (2014) [online], ‘Supply Chain Management’, available at: http://www.constructingexcellence.org.uk/pdf/fact_sheet/supplychain.pdf, [accessed: 05/01/2014] Cooper, R.G. and Kleinschmidt, E.J. (1987), ‘Success factors in product innovation’, Journal of Industrial Marketing Management, vol. 16, no. 3, pp. 215-224 Dainty, A. R. J., Briscoe, G.H. and Millett, S.J. (2001), ‘Subcontractor perspectives on supply chain alliances’, Construction Management and Economics, vol.19, no. 8, pp. 841-848. Dainty, A.R.J., Cheng, M.I. and Moore, D.R. (2003), ‘Redefining performance measures for construction project managers: an empirical evaluation’, Construction Management and Economics, vol. 21, pp. 209 – 218. Dainty, A. (2008), ‘Methodological pluralism in construction management research’, in Knight, A. and Ruddock, L. (2008), ‘Advanced research methods in the Built Environment’, Chichester, John Wiley & Sons Ltd. Dallas, M.F. (2006), ‘Value & Risk Management: A Guide to Best Practice’, Blackwell Publishing Inc, Oxford, UK. Davies, T.C. (2002), ‘The “real” success factors on projects’, International Journal of Project Management, vol. 20, pp. 185-190. DBS Group Research (2008) [online], ‘Economics Vietnam: Inflation challenge ahead’, available at: https://www.dbsvresearch.com/research%5Cdbs%5Cresearch.nsf/(vwAllDocs)/6E40FB0AFC50E41B4825740B0028A1DB/$FILE/vn_2008mar13.pdf, [accessed: 20/02/2010] De Wit, A. (1988), ‘Measurement of project success’, International Journal of Project Management, vol. 6, no. 3, pp. 164-170. Department of Trade and Industry (DTI) (2004), ‘Constructing Excellence- Demonstrating Excellence-An Evolution of the Programme of Demonstrations’, available at: [http://www/.Constructingexcellence.org.uk], [accessed: 02/01/2014] Diallo, A. and Thuillier, D. (2004), ‘The success of international development projects: the perceptions of African project coordinators’, International Journal of Project Management, vol. 22, pp. 19-31. Diallo, A. and Thuillier, D. (2005), ‘The success of international development projects, trust and communication: an African perspective’, International Journal of Project Management, vol. 23, pp. 237-252. Dissanayaka, S.M. and Kumaraswamy, M.M. (1999), ‘Comparing contributors to time and cost performance in building projects’, Building and Environment, vol. 34, pp. 31-42. Dlakwa, M.M. and Culpin, M.F. (1990), ‘Reasons for overrun in public sector construction projects in Nigeria’, International Journal of Project Management, vol. 8, no. 4, pp. 237-241. Do, B.K. and Tun, L.M. (2008), ‘Success Criteria and Factors for international Development Projects: A Life-Cycle-Based Framework’, Project Management Journal, vol. 39, no. 1, pp. 72-84. Dtinews (2013) [online], ‘Hanoi to speed up construction on world most expensive road’, available at: http://www.dtinews.vn/en/news/017004/28840/hanoi-to-speed-up-construction-on-world-s-most-expensive-road.html, [accessed: 16/01/2014] Dulami, M.F., Ling, F.Y.Y. and Bajracharya, A. (2003), ‘Organisational motivation and inter-organisational interaction in construction innovation in Singapore’, Construction Management and Economics, vol. 21, pp. 307–318. Duncan, G.L. and Gorsha, R.A. (1983), ‘Project Management, A Major Factor In Project Success’, IEEE Transactions on Power Apparatus and Systems, vol. 102, no. 11, pp. 3701-3705. Dvir, D. and Lechler, T. (2004), ‘Plans are nothing, changing plans is everything: the impact of changes on project success’, Research Policy, vol. 33, pp. 1-15. Dvir, D., Lipovetsky, S., Shenhar, A. and Tishler, A. (1998), ‘In search of project classification: a non-universal approach to project success factors’, Research Policy, vol. 27, pp. 915-935. Dvir, D., Raz, T. and Shenhar, A. (2003), ‘An empirical analysis of the relationship between project planning and project success’, International Journal of Project Management, vol. 21, pp. 89-95. Dvir, D., Sadeh, A., and Pines, A.M. (2006), ‘Project and project managers: the relationship between project manager’s personality, project types, and project success’, Project Management Journal, vol. 37, no. 5, pp. 36-48. E-Finance (2009) [online], ‘ADB President: Vietnam has get out of the bottom of financial crisis’, available at: http://www.taichinhdientu.vn/Home/Chu-tich-ADB-Viet-Nam-da-thoat-day-khung-hoang/20099/63973.dfis, [accessed: 20/02/2010] Eriksson, P.E. and Westerberg, M. (2011), ‘Effects of Cooperative Procurement Procedures on Construction Project Performance: A Conceptual Framework’, International Journal of Project Management, Vol. 29, pp. 197-208. Fang, D.P., Xie, F., Huang, X.Y. and Li, H. (2004), ‘Factor analysis-based studies on construction workplace safety management in China’, International Journal of Project Management, vol. 22, no. 1, pp. 43-49. Farrar, J.M., AbouRizk, S.M. and Mao, X. (2004), ‘Generic Implementation of Lean Concepts in Simulation Models’, Lean construction Journal, vol. 1, pp.1-23. Fellows, R. and Liu, A. (2008), ‘Research Methods for Construction’, Chichester: John Wiley & Sons Ltd, Blackwell Publishing Ltd, UK. Flyvbjerg, B., Holm, M.K.S and Buhl, S.L. (2003), ‘How common and how large are cost overruns in transport infrastructure projects’, Transport Reviews, vol. 23, no. 1, pp. 71-88. Freeman, M. and Beale, P. (1992), ‘Measuring Project Success’, Project Management Journal, vol. 23, no. 1, pp. 8-17. Frimpong, Y., Oluwoye, J. and Crawford, L. (2003), ‘Causes of delay and cost overruns in construction groundwater projects in a developing countries; Ghana as a case study’, International Journal of Project Management, vol. 21, pp. 321-326. Fortune, J. and White, D. (2006), ‘framing of project critical success factors by a systems model’, International Journal of Project Management, vol. 4, pp. 53-65 Gameson, R.N. (1991), ‘Clients and Professionals: the interface’, cited in: Barret, P. and Males, R. (1991), ‘Practice Management’, London: E & FN SPON. Gill, J. and Johnson, P. (2010), ‘Research Methods for Managers’, Thousand Oaks, California, SAGE Publication.. Glass, R.L. (1999), ‘Evolving a New Theory of Project Success’, Communications of the ACM, vol. 42, no. 11, pp. 17-19. Green, S.D. (1999), ‘The missing arguments of lean construction’, Construction Management and Economics, vol. 17, no. 2, pp. 133-137. Griffin, A. and Page, A.L. (1996), ‘PDMA Success Measurement Project: Recommended Measures for Product Development Success and Failure’, Journal of Product Innovative Management, vol. 13, pp. 478-496. GTKP (2013), ‘Road projects: How does construction occur?’, available at: http://www.gtkp.com/themepage.php&themepgid=265, [accessed: 05/07/2013] Hallgren, M. and Wilson, T.L. (2008), ‘The nature and management of crises in construction projects: Project-as-practice observations’, International Journal of Project Management, vol. 26, pp. 830-838. Hamilton, A. (2002), ‘considering value during early project development: a product case study’, International Journal of Project Management, vol. 20, pp. 131-136. Harris, F. and McCaffer, R. (2006), “Modern Construction Management”, Oxford, Blackwell Hertford, R.D. (2008), “Innovative ICT Projects, Web Based Learning and Support for the Construction Industry”, Hertford Regional College. Hill, R.C. and Bowen, P.A. (1997), ‘Sustainable construction: principles and a framework for attainment’, Construction Management and Economics, vol. 15, pp. 223-239. Holti, R., Nicolini, D. and Smalley, M. (2002), ‘Building Down Barriers: The handbook of supply chain management’, The Essentials, CIRM, London. Hughes, S.W., Tippett, D.D, and Thomas, W.K. (2004), ‘Measuring Project Success in the Construction Industry’, Engineering Management Journal, vol. 16, no. 3, pp. 31-37. Huang, Z., Poli, M. and Mithiborwala, H.S. (2009), ‘Project Strategy: Success Themes for Strategic Projects’, Management of Engineering and Technology, PICMET, pp. 1282-1289. Iizuka, Y. (2004) [online], “A New QMS Model and Its Application”, available at: http://www.inlac.org.co/web/images/stories/biblioteca/presentacionmexico.pdf?php.. [accessed: 19.10.2013] International Business (2008) [online], ‘International Business Vietnam, Market Report 2007/2008’, available at: org.ntnu.no/internationalbusiness/Former/Vietnam_Raport.pdf, [accessed: 20/02/2010] Iskandar, B.Y., Kurokawa, S. and LeBlanc, L. J. (2001), ‘Adoption of electronic data interchange: the role of buyer-supplier relationships’, IEEE Transactions on Engineering Management, vol. 48, no. 4, pp. 505-517. Jeffrey, J.R. (2004), “Strategic Alliances”, Oxford: University Press. Jill Wells. (2014), ‘Corruption and Collusion in Construction: A view from the industry’, In T. Søreide and A. Williams (Eds.) ‘Corruption, Grabbing and Development: Real World Challenges’, Cheltenham, UK and Northampton, MA, USA: Edward Elgar Publishing. John, C. and David, F. (1998), “Strategic of Co-operation: Managing Alliances, Networks, and Joint Venture”, Oxford: University Press. Johnson, R.B., Onwuebuzie, A.J. and Turner L.A. (2007), ‘Toward a definition of Mixed Methods Research’, Journal of Mixed Methods Research, vol. 1, no. 2., pp. 112-133. Johnson, G., School, K. and Whittington, R. (2005), “Exploring Corporate Strategy”, Prentice Hall. Kagioglou, M., Cooper, R. and Aoad, G. (2001), ‘Performance management in construction: a conceptual framework’, Construction Management and Economics, vol. 19, pp. 85-95. Kamata, M.I. and Tamai, T. (2007), ‘How does requirements quality relate to project success or failure’, 15th IEEE International Requirements Engineering Conference. Kelly, J., Male, S. and Graham, D. (2004), ‘Value management of construction projects’, Blackwell Science Ltd, Oxford, UK Kendra, K. and Taplin, L.J. (2004), ‘Project Success: A Cultural Framework’, Project Management Journal, vol. 35, no. 1, pp. 30-45. Keng, T.C. and Hamzah, A.R. (2011), ‘Study of Quality Management in Construction projects’, Chinese Business Reviews, ISSN 1537-1506, vol. 10, no. 7, pp. 542-552. Kinsey, J. (2000), ‘A faster, learner, supply chain: new uses of information technology’, Am Agric Economic, vol. 82, no. 5, pp. 1123-1129. Koelmans, R.G. (2004), ‘Project success and performance evaluation’, International Platinum Conference ‘Platinum Adding Value’, pp. 229-236. Kometa, S.T., Olomolaiye, P.0. and Harris, F. C (1994), ‘Attributes of UK construction clients influencing project consultants' performance’, Journal of Construction Management and Economics, vol. 12, pp 433-443. Koskela, L. (1992), ‘Application of the New Production Philosophy to Construction’, Technical Report No. 72, Centre for Integrated Facility Engineering, Standford University, CA. Koskela, L. (2000), ‘An exploring towards a production theory and its application to construction’, VTT Building Technology. Espoo: VTT Publications. Koskela, L. (2004), ‘Moving-on - beyond lean thinking’, Lean construction Journal, vol. 1, pp. 24-37. Koskela, L. and G. Howell (2002), ‘The underlying theory of Project Management is obsolete’. PMI Research Conference: 293-302. Koskela, L. and G. A. Howell (2002), ‘The theory of project management - Explanation to Novel Methods’, 10th International Group for Lean Construction Conference. Gramada, Brazil. Kulatunga, U., Amaratunga, D. and Haigh, R. (2009), ‘Critical success factors of construction research and development’, Construction Management and Economics, vol. 27, pp. 891-900. Kumaraswamy, M.M. and Dissanayaka, S.M. (2001), ‘Developing a decision support system for building project procurement’, Building and Environment, vol. 36, pp. 337-349. Kumaraswamy, M.M. and Zhang, X.Q. (2001), ‘Governmental role in BOT-led infrastructure development’, International Journal of Project Management, vol. 19, pp. 195-205. Kumaraswamy, M.M. and Dissanayaka, S.M. (1998), \"Linking procurement systems to project priorities\", Building Research and Information, vol. 26, no. 4, pp. 223-38. Kumaraswamy, M.M., Love, P.E.D., Dulaimi, M. and Rahman, M. (2004), ‘Integrating procurement and operational innovations for construction industry development’, Engineering, Construction and Architectural Management, vol. 11, no. 5, pp. 323–334 Kuruoglu, M. and Ergen, E. (2000), ‘The effects of economic development on project management in developing countries’, 2nd International Conference on Construction in Developing Countries: Challenges facing the construction industry in developing countries, November 15-17, Gabarone, Botswana, available at: http://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.202.9573&rep=rep1&type=pdf, [accessed: 02/08/2011] Kwak, Y.H. (2002), ‘Critical Success Factors in International Development Project Management’, CIB 10th International Symposium Construction Innovations & Global Competitiveness, Cincinnati, Ohio, USA. Lamming, R. (1996), ‘Squaring the lean supply with supply chain management’, International Journal of Operations and Production Management, vol. 16, no. 2, pp. 183-196. Langford, D. and Male, S. (2001), “Strategic management in Construction”, Oxford: Blackwell Science. Langford, D., Fellows, R. and Newcombe, R. (2001), “Construction Management in Practice”, Sydney Urry: Blackwell Publishing. Laufer, A., Denker, G.R. and Shenhar, A.J. (1996), “Simultaneous management: the key to excellence in capital projects”, International Journal of Project Management, Vol. 14 No. 4, pp. 189-99, cited in Nguyen et al. (2004). Larson, E. (1997), ‘Partnering on Construction Projects: A Study of the Relationship Between Partnering Activities and Project Success’, IEEE Transactions on Engineering Management, vol. 44, no. 2, pp. 188-195. Le, H.L., Lee, Y.D. and Lee, J.Y (2008), ‘Delay and Cost Overruns in Vietnam Large Construction Projects: A Comparison with Other Selected Countries’, Journal of Civil Engineering, December 2008, Volume 12, Number 6, pp. 367 – 377. Le, H.Q. and Ruppel, U. (2009), ‘Multi-site construction project scheduling considering resource moving time in developing countries’, 18th International Conference of the Application of Computer Science and Mathematics in Architecture and Civil Engineering, Weimar, Germany. Lee, S.M and Peterson, S.J (2000), ‘Culture, entrepreneurial orientation, and global competitiveness’, Journal of World Business, vol. 35, issue. 4, pp. 401-416. Leshem, S. and Trafford, V. (2007), ‘Overlooking the conceptual framework’, Innovations in Education and Teaching International, vol. 44, no. 1, pp. 93-105. Leung, M.Y. and Liu, A.M.M. (2003), ‘Analysis of value and project goal specificity in value management’, Construction Management and Economics, vol. 21, pp. 11-19. Levy, P., Bessant, J., Sang, B. and Lamming, R. (1995), ‘Developing integration through total quality supply chain management’, Integrated Manufacturing Systems, vol. 6, no. 3, pp. 4-12. Levy, S.M. (2002), ‘Project Management in Construction’, New York: McGraw-Hill. Lim, C.S and Mohamed, M.Z (1999), ‘Criteria of project success: an exploratory re-examination’, International Journal of Project Management, vol. 17, no. 4, pp. 243-248. Ling, Y.Y. and Bui, T.T.D. (2010), ‘Factors Affecting Construction Project Outcomes: Case Study of Vietnam’, Journal of Professional Issues in Engineering Education and Practice, vol 136, no. 3, pp. 148-155. Lipovetsky, S., Tishler, A., Dvir, D. and Shenhar, A. (1997), ‘The relative importance of project success dimensions’, R&D Management, vol. 27, no. 2, pp. 97-106. Liu, A.M.M. and Walker, A. (1998), ‘Evaluation of project outcomes’, Construction Management and Economics, vol. 16, pp. 209 – 219. London, K. (2008), “Construction Supply Chain Economics”, Abingdon: Taylor & Francis. Loraine, R.K. (1992) “Construction management in developing countries”, Heron Quay, London: Thomas Telford. Louzolo-Kimbembe, P. and Pettang, C. (2006), ‘A new approach for construction planning in the developing countries: the sub-structure chaining diagram (sscd)’, Journal of Construction Research, vol. 7, no. 1&2, pp. 159-176. Love, P.E.D., Skitmore, R.M. and Earl, G. (1998), ‘Selecting a suitable procurement method for a building project’, Construction Management and Economics, vol. 16, no. 2, pp. 221-233. Love, P.E.D., Li, H., Irani, Z. and Faninan, O. (2000), ‘Total quality management and the learning organisation: a dialogue for change in construction’, Construction Management and Economics, vol. 18, pp. 321-331. Love, P.E.D., Holt, G.D. and Li, H. (2002), ‘Triangulation in construction management research’, Engineering, Construction and Architectural Management, vol. 9, no. 2, pp. 294-303 Low, S. P. and Omar, H. F. (1997), “The effective maintenance of quality management systems in the construction industry”, International Journal of Quality & Reliability Management, vol. 14, issue: 8, pp. 768-790. Lowery, C. (2001), ‘Ethnography Research Methods’, in Thyer, B.A. (2001), ‘The handbook of social work research methods’, Thousand Oaks, California, SAGE Publication. Luu, D.T. and Ng, S.T. and Chen, S.E. (2003), ‘A case-based procurement advisory system for construction’, Journal of Advances in Engineering Software, vol. 34, pp. 429-438. Marco, A.D., Briccarello, D. and Rafele, C. (2009), ‘Cost and Schedule Monitoring of Industrial Building Projects: Case Study’, Journal of Construction Engineering and Management, vol. 135, no. 9, pp. 853-862. Marwanga, R.O., Nyangara, F.M. and Deleveaux, V.J. (2006), ‘An Investigation of Project Success for Engineering and Technology-Based Projects in Developing Countries’, Technology Management for the Global Future, PICMET, pp. 2311-2321. McElroy, B. and Mills, C. (2000), ‘Managing stakeholders’, cited in Turner, J.R. and Simister, J.S. (2000), ‘Gower Handbook of Project Management’, Gower Publishing Limited, Hampshire, pp. 757–775. MGI (McKinsey Global Institute) (2012) [online], ‘Sustaining Vietnam’s growth: The productivity challenge’, available at: http://www.mckinsey.com/insights/asia-pacific/sustaining_growth_in_vietnam, [accessed: 06/03/2014]. McQueen, R.A. and Knussen, C. (2002), ‘Research methods for social science: an introduction’, Edinburgh Gate, Pearson Education Limited. Meyer, A.D, Loch, C.H. and Pich, M.T. (2002), ‘managing project uncertainty: from variation to chaos’, MIT Sloan Management Review, vol. 43, no. 2, pp. 60-67 Morris, P.W.G. (1997), ‘The Management of Project’, 2nd eds, London: Thomas Telford. Mohamed, S. (2003), ‘Performance in International Construction Joint Ventures: Modelling Perspective’, Journal of Construction Engineering and Management, vol. 129, no. 6, pp. 619-626 Munns, A.K. and Bjeirmi, B.F. (1996), ‘The role of project management in achieving project success’, International Journal of Project Management, vol. 14, no. 2, pp. 81-87. Murray, M., Arif, A. and Lai, A. (2004), “Possibilities for ICT incorporation in a Construction Management course”, CIBWorld. Murray M. & Lai, A. (2001), “The management of construction projects using web sites”. 2nd Worldwide ECCE Symposium, Espoo, Finland, Symposium Report: Information and Communication Technology (ICT) in the Practice of Building and Civil Engineering, pp 163-168. Cited in Murray et al (2004). Naoum, S. G. (1998), ‘Dissertation Research and Writing for Construction Students’, Oxford: Butterworth-Heinemann Nguyen, D.L, Ogunlana, S.O and Do, T.X.L (2004), ‘A study on project success factors in large construction projects in Vietnam’, Engineering, Construction and Architectural Management, Volume 11, Number 6, 2004, pp 404 – 413. Nguyen, N.H., Skitmore, M. and Wong, J.K.W (2009), ‘Stakeholder impact analysis of infrastructure project management in developing countries: a study of perception of project managers in state-owned engineering firms in Vietnam’, Construction Management and Economics, Vol. 27, pp 1129 – 1140. Nguyen, H.V. and Meyer, K.E. (2005), ‘Foreign Investment Strategies and Sub-national Institutions in Emerging Markets: Evidence from Vietnam’, Journal of Management Studies, Vol. 42, Issues. 1, pp. 63-93. Nguyen, T.V. (2000), ‘Construction Process in Vietnam’, Reflection of ICM 2000. Nogales, A. (2004) [online], ‘Vietnam: transport sector brief’’, available at: www.worldbank.org/transport/transportresults/.../vietnam-tran-brief.pdf, [accessed: 20/02/2010] Ofori, G. (2007), ‘Guest Editorial Construction in Developing Countries’, Construction Management and Economics, vol. 25, pp.1-6. Ofori, G. (2000), ‘Challenges of Construction Industries in Developing Countries: Lessons from Various Countries’, in Ngowi, A.B. and Ssegawa, J. (eds), Challenges facing the construction industry in developing countries, Proceedings, Second International Conference of CIB Task Group 29, 15–17 November, National Construction Industry Council, University of Botswana, and CIB, Gaborone, pp. 1–11. Ofori, G. (1997), ‘Sustainable construction: principles and a framework for attainment – comment’, Construction Management and Economics, vol. 16, pp.141-145. Ofori, G., Dulaimi, M.F. and Ling, F.Y.Y. (2004), ‘Improving Performance of Construction Industry in Singapore: Motivators, Enablers and Lessons for Developing Countries’, Journal of Construction Research, vol. 5, no. 2, pp. 267-289. Office of Government Commerce (OGC) (2005) [online], ‘Common Causes of Project Failure’, available at: https://www.swan.ac.uk/media/cp0015.pdf, [accessed: 18/02/2011] OGN (2007), ‘Project procurement lifecycle, the integrated process’, Office of Government Commerce, Great Peter Street, London, UK Ogunlana, S.O., Promkuntong, K. and jearkjirm, V. (1996), ‘Construction delays in a fast-growing economy: comparing Thailand with other economies’, International Journal of Project Management, vol. 14, no. 1, pp. 37-45. Parfitt, M.K. and Sanvido, V.E. (1993), ‘Checklist of critical success factors for building projects’, Journal of Management in Engineering, vol. 9, pp. 243-249. Patton, M.Q. (2002), ‘Qualitative Research and Evaluation Methods’, Thousand Oaks, SAGE Publications Pesamaa, O., Eriksson, P.E. and Hair, J.F. (2009), ‘Validating a model of cooperative procurement in the construction industry’, International Journal of Project Management, vol. 27, pp. 552-559. Pham, V.B. (2008) [online], ‘Improvement of the productivity of the construction sector in Vietnam’, available at: www.asiaconst.com/past_conference/conference/.../03Vietnam.pdf, [accessed: 20/02/2010] Phan, T.M. and Luu, H.V. (2012) [online], ‘Vietnam Country Report’, available at: http://www.asiaconst.com/past_conference/conference/18th/Vietnam.pdf, [accessed: 06/03/2014]. Phelan, T.M. (2004), ‘The Impact of Effectiveness and Efficiency on Project Success’, Steven Institute of Technology, Hoboken, NJ, USA, pp. 381-391. Piercy, N. F. and Morgan, N. A. (1997), ‘the impact of lean thinking and lean enterprise on marketing: threat or synergy?’ Journal of Marketing and Management, vol. 13, no. 7, pp. 679-694. Pietroforte, R. (1997), “Building International Construction Alliances: Successful Partnering for Construction Firms”, London: E & FN Spon. Pinto, J.K. and Covin, J.G. (1989), ‘critical factors in project implementation: a comparison of construction and R&D projects’, Technovation, vol. 9, pp. 49-62. Pinto, J.K. and Mantel, S.J. (1990), ‘The cause of project failure’, IEEE Transactions of Engineering Management EM, vol. 37, no. 4, pp. 269-276 Pinto, J.K. and Prescott, J.E. (1988), ‘Variations in Critical Success Factors Over the Stages in the Project Life Cycle’, Journal of Management, vol. 14, no. 1, pp. 5-18. Pinto, J. K. and Slevin, D. P. (1994), ‘the Project Implementation Profile: An International Perspective’, cited in Cleland, D.I. and Gareis, R. (1994), Global Project Management Handbook, Singapore: McGraw-Hill, pp. 27-1 - 27-27. Pinto, J.K. and Slevin, D.P. (1987), ‘Critical Success Factors in Effective Project Implementation’, cited in ‘Project Management Handbook’, edited by Cleland, D.I. and King, W.R. (1988), New York: Van Nostrand Reinhold, pp. 479-512. Pinto, J.K. and Slevin, D.P. (1987), ‘Critical factors in successful project implementation’, IEEE Transactions on Engineering Management, vol. 34, no. 1, pp. 22-27. Poli, M. and Shenhar, A.J. (2003), ‘Project Strategy: The Key to Project Success’, Management of Engineering and Technology, PICMET, pp. 231-235. Project Management Institute (PMI) (1996), ‘A Guide to the Project Management Body of Knowledge’, PA: Project Management Institute, USA. Project Management Institute (PMI) (2004), ‘A Guide to the Project Management Body of Knowledge’, 3rd Edition, PA: Project Management Institute, USA. Project Management Institute (PMI) (2008), ‘A Guide to the Project Management Body of Knowledge’, 4th Edition, PA: Project Management Institute, USA. Punch, K.F. (2000), ‘Developing effective research proposal’, London, Sage. Pylkas, L., Neal, S.R, Madni, K. I. (2002), ‘Smart Value Engineering’, AACE International Transactions, pp. 161-164. Qiao, L., Wang, S.Q., Tiong, R.L.K. and Chan, T.S. (2001), ‘Framework for Critical Success Factors of BOT Projects in China’, The Journal of Project Finance, vol. 7, no. 1, pp. 53 – 61. Rad, P.F. (2003), ‘Project Success Attributes’, Cost Engineering, vol. 45, no. 4, pp. 23-29. Radujkovic, M. (1996), ‘Risk management: maintaining programmed construction time in economics in transition. The Organisation and Management of Construction: Shaping theory and practice’ (Volume 2), London: F& FN Spon Raftery, J., Pasadilla, B., Chiang, Y.H., Hui, E.C.M. and Tang, B.S. (1998), ‘Globalisation and construction industry development: implications of recent developments in the construction sector in Asia’, Construction Management and Economics, vol. 16, pp. 729-737. Raz, T., Shenhar, A.J., and Dvir, D. (2002), ‘Risk management, project success, and technological uncertainty’, R & D Management, vol. 32, no. 2, pp. 101-109. Remenyi, D., Williams, B., Money, A. and Swartz, E. (1998), ‘Doing Research in Business and Management: An Introduction to Process and Method’, London: SAGE Publications Ltd. Riedel, J. and Turley, W.S. (1999), ‘The Politics and Economics of Transition to an Open Market Economy in Vietnam’, Major Regions and Large Countries, OECD Development Centre. RnR (ReportsnReports) (2013) [online], ‘Construction in Vietnam - Key trend and Opportunities to 2017’, available at: http://www.reportsnreports.com/reports/256112-construction-in-vietnam-key-trends-and-opportunities-to-2017.html, [accessed: 07/03/2014] Rockart, J. F. (1982), ‘The Changing Role of the Information Systems Executive: A Critical Success Factors Perspective’, Sloan Management Review, 24, pp. 3-13. Rosenau, Jr. M.D. and Githens, G.D. (2005), ‘Successful Project Management’, john Wiley & Sons, Inc., Hoboken, New Jersey. Rounds, J. and Chi, N. (1985), ‘Total Quality Management for Construction’, Journal of Construction Engineering and Management, vol. 111, no. 2, pp. 117–128. Runeson, G. and Skitmore, M. (2008), ‘Scientific Theories’, in Knight, A. and Ruddock, L. (2008), ‘Advanced Research Methods in the Built Environment’, Chichester, Blackwell Publishing Ltd. Sambasivan, M. and Soon, Y.W. (2007), ‘Causes and effects of delays in Malaysian construction industry’, International Journal of Project Management, vol. 25, pp. 517-526. Sanvido, V., Grobler, F., Parfitt, K., Guvenis, M. and Coyle, M. (1992), ‘Critical Success Factors for Construction Projects’, Journal of Construction Engineering and Management, vol. 118, no. 1, pp. 94-111. Sawacha, E., Naourn, S. and Fong, D. (1999), ‘Factors affecting safety performance on construction sites’, International Journal of Project Management, vol. 17, no. 5, pp. 309-315. Shenhar, A.J., Dvir, D., Levy, O. And Maltz, A.C. (2002), ‘Project Success: A Multidimensional Strategic Concept’, Long Range Planning Journal, vol. 34, pp. 699-725. Shenhar, A.J., Dvir, D. and Levy, O. (1997), ‘Mapping the dimensions of project success’, Project Management Journal, vol. 28, no. 2, pp. 5-13. Shenhar, A.J., Poli, M. and Lechler, T. (2000), ‘A new framework for strategic project management’, cited in ‘Management of Technology VIII’ by Khalil, T. (2000), University of Maimi, FL. Shenhar, A.J. and Wideman, R.M. (2002), ‘Optimizing Success by matching Management Style to Project Type’, AEW Services, Vancouver, available at: www.maxwideman.com/papers/success/success.pdf [accessed: 16/03/2010]. Shenhar, A.J., Renier, J.J. and Wideman, R.M. (1996), ‘Improving PM: Linking Success Criteria to Project Type’, paper presented to the Southern Alberta Chapter ‘Creating Canadian Advantage through Project Management’, Symposium Calgary, Project Management Institute. Shen, Q. and Liu, G. (2003), ‘Critical success factors for Value Management Studies in Construction’, Journal of Construction Engineering and Management, vol. 129, no. 5, pp. 485-491. Shenhu, Z. and Akintoye, A. (2010), ‘Major challenges to the successful implementation and practice of programme management in the construction environment: A critical analysis’, International Journal of Project Management, vol. 28, pp. 26-39. Slevin, D.P. and Pinto, J.K. (1986), ‘The project implementation profile: new tool for project managers’, Project Management Journal, vol. 18, pp. 57-71. Smyth, H. J. and Morris, P.W.G. (2007), ‘An epistemological evaluation of research into projects and their management: Methodological Issues’, International Journal of Project Management, vol. 25, pp. 423-436. Songer, A.D. and Molenaar, K.R. (1997), ‘Project Characteristics for Successful Public-Sector Design-Build’, Journal of Construction Engineering and Management, vol. 123, no. 1, pp. 34-40. Soy, S. K. (1997), ‘The Case Study as a Research Method’, Unpublished paper. Austin, University of Texas, Austin. Spekknink, D. (1995), ‘Architect’s and consultant’s quality management system: State of Art quality management in architectural and consulting engineering practices in the Netherland with highlight of some aspects in Norway, Finland and Sweden’, Building Research and Information, vol. 23, no. 2, pp. 97-105. Spekman, R.E., Kamauff Jr, J. W. and Myhr, N. (1998), ‘an empirical investigation into Supply chain management: a perspective on partnerships’, International Journal of Physical Distribution and Logistics Management, vol. 28, no. 8, pp. 630-650. Stannack, P. (1995), ‘Building organisational communities: the role of purchasing and supply chain management’, Cited in: Kemp, FLA. and Lamming, R. C. (eds), Proceedings for the First Worldwide Research Symposium on Purchasing and Supply Chain Management, Arizona State University, Tempe, USA Strauss, A. and Corbim, J. (1998), ‘Basics of Qualitative Research: Techniques and Procedures for Developing Grounded Theory’, Thousand Oaks, California, SAGE Publications. Stewart, R.A. and Mohamed, S. (2003), ‘Evaluating the value IT adds to the process of project information management in construction’, Journal of Automation in Construction, Elsevier Science, vol. 12, no. 4, pp. 407-417. Study Mode (SM) (2011) [online], ‘Logical Structure, Theoretical Framework’, available at: http://www.studymode.com/essays/Logical-Structure-Or-Theoretical-Framework-748230.html, [accessed: 18/02/2011]. Tam, C.M. (1999), ‘Build-operate-transfer model for infrastructure development in Asia: reasons for successes and failures’, International Journal of Project Management, vol. 17, no. 6, pp. 377-382. Takim, R. (2005), ‘A framework for successful construction performance’, PhD Thesis, Glasgow Caledonian University Takim, R. (2009), ‘The Management of Stakeholders’ Needs and Expectations in the Development of Construction Project in Malaysia’, Modern Applied Science, CCSE Journal, vol. 3, no. 5, pp. 167-175. Takim, R. and Adnan, H. (2008), ‘Analysis of Effectiveness Measures of Construction Project Success in Malaysia’, Asian Social Science, CCSE Journal, vol. 4, no. 7, pp. 74-89. Tashakkori, A. and Teddlie, C. (2003), ‘Handbook of Mixed Methods in Social and Behavioural Research’, Thousand Oaks, California, SAGE Publications Teo, E.A.L., Ling, F.Y.Y. and Chong, A.F.W. (2005), ‘Framework for project managers to manage construction safety’, International Journal of Project Management, vol. 23, pp. 329-341. Teare, R., Munro-Faure, L., Munro-Faure, M., Scheuing, E. and Bowen, J.T. (1999), ‘Modelling team structures: a grounded approach’, International Journal of Service Industry Management, vol. 10, no. 4, 1999, pp. 380-392. Thanhnien (2008) [online], ‘Vietnam inflation likely to ease, JPMorgan, HSBC say’, available at: http://www.thanhniennews.com/business/?catid=2&newsid=39778, [accessed: 20/02/2010] Thanhnien (2013) [online], ‘Crunch time as Vietnam set for education shakeup, again’, available at: http://www.thanhniennews.com/index/pages/20131114-crunch-time-as-vietnam-set-for-education-shakeup-again.aspx, [accessed: 02/12/2013] Thomas-Cain, C. (2004), “Profitable Partnering for Lean Construction”, Oxford: Blackwell. Thompson, A. A. and Strickland, A. J. (1990), “Strategic Management: Concept and Cases”, Irwin: Homewood Ill. Thorpe, B. and Sumner, P. (2004), ‘Quality Management in Construction’, Gower Publishing. Tiong, R.L.K., Yeo, K.T. and McCarthy, S.C. (1992), ‘Critical success factors in winning BOT contracts’, Journal of Construction Engineering and Management, vol. 118, no. 2, pp. 217-28. Truong, Q., Nguyen, D.L, Ogunlana, S. and Lam, K.C. (2004), ‘Large construction projects in developing countries: a case study from Vietnam’, International Journal of Project Management, Volume 22, pp 553 – 561. Truong, Q., Swierczek, F.W., and Dang, T.K.C. (1998), ‘Effective leadership in joint ventures in Vietnam: a cross-cultural perspective’, Journal of Organizational Change Management, vol. 11, no. 4, pp. 357-372. Truong, V.L., Kim, S.Y., and Huynh, T.A. (2008), ‘Improving project management performance of large contractors using benchmarking approach’, International Journal of Project Management, vol. 26, pp. 758-769 Truong, V.L., Kim, S.Y., Cao, H.L., and Park, Y.M. (2008), ‘Performance measurement of construction firms in developing countries’, Construction Management and Economics, vol. 26, pp. 373-386. Torrington, D. and Weightman, J. (1994), “Effective Management: People and Organization”, Hertfordshire: Prentice Hall. Toor, S.R. and Ogunlana, S.O. (2008), ‘Critical COMs of success in large-scale construction projects: Evidence from Thailand construction industry’, International Journal of Project Management, vol. 26, pp. 420-430. Toor, S.R. and Ogunlana, S.O. (2010), ‘Beyond the “iron triangle”: Stakeholder perception of key performance indicators (KPIs) for large scale public sector development projects’, International Journal of Project Management, vol. 28, pp. 228-236. Tse, R.Y.C. and Love, P.E.D. (2003), ‘An economic analysis of the effect of delays on project costs’, Journal of Construction Research, vol. 4, no. 2, pp. 155-160. Uyen, T. (2003) [online], ‘Construction losses headache’, Vietnamnet, available at: http://english.vietnamnet.vn/news/2003/11/18321, [accessed: 18/02/2010] Vardy, N. (2007) [online], ‘The next China: Five Emerging Markets to Watch’, Seeking Alpha, available at: http://seekingalpha.com/article/39198-the-next-china-five-emerging-markets-to-watch, [accessed: 20/02/2010] Vickridge, I. (2002), ‘Project Management in Developing Countries’, in N.J. Smith (2002), ‘Engineering Project Management’, Blackwell Publishing Ltd, Oxford, UK Vietbao (2007) [online], ‘World Bank President: Vietnam is a right place for investment’, available at: http://vietbao.vn/Chinh-Tri/Chu-tich-WB-Viet-Nam-la-mot-dia-chi-dau-tu-dung/20727223/96/, [accessed: 20/02/2010] Vietnamnet (2008) [online], ‘Goldman Sachs: high inflation the biggest problem now for Vietnam’, Vietnamnet Bridge, available at: http://english.vietnamnet.vn/biz/2008/05/784420/, [accessed: 20/02/2010] Wang, S.Q., Dulaimi, M.F. and Aguria, M.Y. (2004), ‘Risk management framework for construction projects in developing countries’, Construction Management and Economics, vol. 22, pp. 237-252. Ward, C., Curtis, B., and Chapman (1991), ‘Objective and performance in construction projects’, Journal of Construction Management and Economics, vol. 9, pp 343-353 Ward, S. C. and Chapman, C. B. (1995), ‘Risk-management perspective on the project life cycle’, International Journal of Project Management, vol. 13, no. 3, pp. 145-149 Watson, Farley and Williams (2009) [online], ‘Infrastructure Development in Vietnam’, available at: www.wfw.com, [accessed: 20/02/2010] Westerveld, E. (2003), ‘The Project Excellent Model: linking success criteria and critical success factors’, International Journal of Project Management, vol. 21, pp. 411-418. Westhuizen, V.D. and Fitzgerald, E.P. (2005), ‘Defining and measuring project success’, In: European Conference on IS Management, Leadership and Governance, 07-08 Jul 2005, Reading, United Kingdom. Winch, G.M (2001), ‘Governing the project process: a conceptual framework’, Construction Management and Economics, vol. 19, pp. 799-808. Winter, M., C. Smith, P. Morris and S. Cicmil (2006), ‘Directions for future research in project management: The main findings of a UK government-funded research network.’ International Journal of Project Management, vol. 24, no.8, pp. 638-649. Wong, A. and Fung, P. (1999), ‘Total quality management in the construction industry in Hong Kong: a supply chain management perspective’, Total Quality Management, vol. 10, no. 2, pp. 199-208. World Bank (2000) [online], ‘Fighting corruption in Vietnam report’, available at: www.worldbank.org.vn, [accessed: 10/11/2009] World Bank (2003) [online], ‘Issues and Dynamics: Urban Systems in Developing East Asia’, available at: http://siteresources.worldbank.org/INTEAPREGTOPURBDEV/Resources/Philippines-Urbanisation.pdf, [accessed: 29/10/2009] World Bank (2009) [online], ‘Improvement of social and economics of Vietnam report’, available at: www.worldbank.org.vn, [accessed: 10/11/2009] Yang, C.P (2006), ‘Factors affecting the performance of public projects in Taiwan’, Journal of Construction Research, vol. 17, no. 1&2, pp. 207-225. Yang, J., Shen, G.Q., Drew, D.S. and Ho, M. (2010), ‘Critical success factors for stakeholder management: construction practitioners’ perspectives’, Journal of Construction Engineering and Management, vol. 136, no. 7, pp. 778-786. Yeo, K.T. (1995), ‘Planning and learning in major infrastructure development: system perspectives’, International Journal of Project Management, Vol. 13, no. 5, pp. 287-293. Yu, A.G., Flett, P.D. and Bowers, J.A. (2005), ‘Developing a value-centred proposal for assessing project success’, International Journal of Project Management, vol. 23, pp. 428-436. Zee Pedia (ZP) (2011) [online], ‘Theoretical framework’, available at: http://www.zeepedia.com/read.php?theoretical_framework_make_an_inventory_of_variables_research_methods&b=71&c=10, [accessed: 18/02/2011]. Zhang, X. (2005), ‘Critical Success Factors for Public-Private Partnerships in Infrastructure Development’, Journal of Construction Engineering and Management, vol. 131, no. 1, pp. 3-14. Zwikael, O. and Globerson, S. (2006), ‘from critical success factors to critical success processes’, International Journal of Production Research, vol. 44, no. 17, pp. 3433-3449."],"dcterms:accessrights":["public"],"dc:title":["Develop a framework for successfully managing public transport development projects in Vietnam"],"dc:type":["Thesis"],"dc:type.qualificationlevel":["doctoral"],"dc:type.qualificationname":["Ph.D"]},"updated_at":"2026-11-18T21:42:33Z"}