{"id":{"repo_id":"whiterose","oai_identifier":"oai:etheses.whiterose.ac.uk:24193"},"canonical_url":"https://search.ndltd.org/etd/whiterose/oai:etheses.whiterose.ac.uk:24193","repository":{"repo_id":"whiterose","name":"White Rose University Consortium","base_url":"https://etheses.whiterose.ac.uk/cgi/oai2"},"display":{"title":"Benchmarking Nuclear Decommissioning","abstract":"Historically, project management research on infrastructure has mostly focused on its planning, design, and construction. However, globally, more and more infrastructure, such as nuclear and offshore oil & gas facilities, are reaching the end of life and will soon need to be decommissioned. Decommissioning projects are a new, emerging, unavoidable challenge that project managers are currently facing and will face more and more severely in the future. Primarily due to the relevance of the nuclear sector, this research focuses on Nuclear Decommissioning Projects and Programmes (NDPs), intended as site-level endeavours. NDPs are long and complex projects, whose estimates reach billions. Moreover, the cost estimates of several of these projects keep increasing while there is a limited understanding of why this happens. Triggered by these considerations, this industry-funded research develops and applies a methodology based on benchmarking to investigate the NDP characteristics that affect the NDP performance in terms of cost and time. Due to the NDP small sample size, the limited number, availability of and reliability of data and information on NDPs, and the extremely limited previous research on NDPs, inputs of this research are both secondary data and information, as well as primary ones collected through interviews with experienced practitioners. Outputs of this research include a methodology based on benchmarking that incorporates both qualitative and quantitative analysis, and as well as its application on NDPs. However, this methodology could be applied to other industrial sectors as well. The contribution of this thesis is both methodological and practical as it both develops and applies a methodology to investigate NDPs, highlighting the NDP characteristics that affect the NDP performance to ultimately improve the selection, planning, and delivery of NDPs. Moreover, by introducing the topic of NDPs to the project management community, this thesis lays the path for a number of future research, both in order to address the limitations of the current research, e.g. its focus on European NDPs, as well as to promote the in-depth investigation of each single NDP characteristics that emerged during this study.","abstract_html":"Historically, project management research on infrastructure has mostly focused on its planning, design, and construction. However, globally, more and more infrastructure, such as nuclear and offshore oil &amp; gas facilities, are reaching the end of life and will soon need to be decommissioned. Decommissioning projects are a new, emerging, unavoidable challenge that project managers are currently facing and will face more and more severely in the future. Primarily due to the relevance of the nuclear sector, this research focuses on Nuclear Decommissioning Projects and Programmes (NDPs), intended as site-level endeavours. NDPs are long and complex projects, whose estimates reach billions. Moreover, the cost estimates of several of these projects keep increasing while there is a limited understanding of why this happens. Triggered by these considerations, this industry-funded research develops and applies a methodology based on benchmarking to investigate the NDP characteristics that affect the NDP performance in terms of cost and time. Due to the NDP small sample size, the limited number, availability of and reliability of data and information on NDPs, and the extremely limited previous research on NDPs, inputs of this research are both secondary data and information, as well as primary ones collected through interviews with experienced practitioners. Outputs of this research include a methodology based on benchmarking that incorporates both qualitative and quantitative analysis, and as well as its application on NDPs. However, this methodology could be applied to other industrial sectors as well. The contribution of this thesis is both methodological and practical as it both develops and applies a methodology to investigate NDPs, highlighting the NDP characteristics that affect the NDP performance to ultimately improve the selection, planning, and delivery of NDPs. Moreover, by introducing the topic of NDPs to the project management community, this thesis lays the path for a number of future research, both in order to address the limitations of the current research, e.g. its focus on European NDPs, as well as to promote the in-depth investigation of each single NDP characteristics that emerged during this study.","abstract_has_math":false,"creators":["Invernizzi, Diletta Colette"],"institution":"University of Leeds","degree_name":"Ph.D","degree_level":"doctoral","degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":["Locatelli, Giorgio","Hanson, Bruce","Brookes, Naomi J","Grey, Martin","McDermott, Lorraine"],"committee_chairs":[],"committee_members":[],"year":2019,"date_issued":"2019-05","date_published":"2019-05","updated_at":"2026-11-18T22:33:25Z","subjects":[],"languages":["eng"],"rights":[],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.grantnumber","label":"Dc Identifier Grantnumber","values":["NNL/UA/002"],"render_values":[{"text":"NNL/UA/002","href":null,"code":true}]}],"person_identifier_entries":[{"key":"person:identifier.orcid","label":"ORCID","values":["0000000181789557"],"render_values":[{"text":"0000-0001-8178-9557","href":"https://orcid.org/0000-0001-8178-9557","code":true}]}]},"links":{"outbound_url":null,"outbound_label":null,"outbound_source":null,"record_url":null,"record_label":null,"record_kind":null,"record_source":null,"download_url":"https://etheses.whiterose.ac.uk/id/eprint/24193/1/Diletta%27s%20PhD%20Thesis%20-%20final%20submission%20V01.pdf","download_label":"Download PDF","download_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://etheses.whiterose.ac.uk/cgi/oai2?verb=GetRecord&metadataPrefix=uketd_dc&identifier=oai%3Aetheses.whiterose.ac.uk%3A24193","prefix":"uketd_dc"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Locatelli, Giorgio","Hanson, Bruce","Brookes, Naomi J","Grey, Martin","McDermott, Lorraine"]},{"key":"dc:contributor.sponsor","label":"Sponsor","values":["UK Nuclear Decommissioning Authority"]},{"key":"dc:creator","label":"Author","values":["Invernizzi, Diletta Colette"]},{"key":"person:identifier.orcid","label":"ORCID","values":["0000000181789557"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2019-05"]},{"key":"dc:date.issued","label":"Date","values":["2019-05"]},{"key":"dc:publisher.commercial","label":"Dc Publisher Commercial","values":["University of Leeds"]},{"key":"dc:publisher.department","label":"Dc Publisher Department","values":["School of Civil Engineering (Leeds)"]},{"key":"dc:publisher.institution","label":"Dc Publisher Institution","values":["University of Leeds"]},{"key":"dc:relation.isreferencedby","label":"Dc Relation Isreferencedby","values":["https://etheses.whiterose.ac.uk/id/eprint/24193/"]},{"key":"dc:relation.references","label":"Dc Relation References","values":["Anand, G. & Kodali, R., 2008. Benchmarking the benchmarking models. Benchmarking: An International Journal, 15(3), pp.257–291. Andres, M., 2006. Fisher’s exact and Barnard’s test - Encyclopedia of Statistical Sciences. Ansar, A. et al., 2014. Should we build more large dams? The actual costs of hydropower megaproject development. Energy Policy, 69, pp.43–56. Barber, E., 2004. Benchmarking the management of projects: A review of current thinking. International Journal of Project Management, 22(4), pp.301–307. Bevilacqua, M., Ciarapica, F.E. & Paciarotti, C., 2015. Implementing lean information management: the case study of an automotive company. Production Planning & Control, 26(10), pp.753–768. Bodey, E., 2006. Making the Impossible Possible: Closing Rocky Flats: ahead of schedule and under budget. Radwaste Solutions, (October 2005), pp.39–45. Bond, A., Palerm, J. & Haigh, P., 2004. Public participation in EIA of nuclear power plant decommissioning projects: a case study analysis. Environmental Impact Assessment Review, 24(6), pp.617–641. Brookes, N.J. & Locatelli, G., 2015. Power plants as megaprojects: Using empirics to shape policy, planning, and construction management. Utilities Policy, (36), pp.57–66. Bryman, A. & Bell, E., 2007. Business Research Methods Second., Oxford University Press. Büyüközkan, G. & Maire, J.-L., 1998. Benchmarking process formalization and a case study. Benchmarking: An International Journal, 5(2), pp.101–125. Cameron, K. & Lavine, M., 2006. Making the Impossible Possible: Leading Extraordinary Performance, The Rocky Flats Story, Berrett-Koehler, San Francisco, California. Cartelle Barros, J.J. et al., 2017. Comparative analysis of direct employment generated by renewable and non-renewable power plants. Energy, 139, pp.542–554. Costa, D.B. et al., 2006. Benchmarking initiatives in the construction industry: lessons learned and improvement opportunities. Journal of Management in Engineering, 22(4), pp.158–168. Davis, K., 2014. Different stakeholder groups and their perceptions of project success. International Journal of Project Management, 32(2), pp.189–201. DOE, 2013. Rocky Flats Closure Legacy report - Office of Legacy Management. Office of Legacy Management official website. Available at: http://www.lm.doe.gov/Rocky_Flats_Closure.pdf#TOC [Accessed June 16, 2016]. EC, 2018. Decommissioning of nuclear facilities. European Commission Official Website. Available at: https://ec.europa.eu/energy/en/topics/nuclear-energy/decommissioning-nuclear-facilities [Accessed October 18, 2018]. El-Mashaleh, M., Minchin, R.E. & O’Brien, W.J., 2007. Management of construction firm performance using benchmarking. Journal of Management in Engineering, 23 (1)(January), pp.10–17. European Court of Auditors, 2011. EU financial assistance for the decommissioning of nuclear plants in Bulgaria, Lithuania and Slovakia: achievements and future challenges, Available at: https://www.eca.europa.eu/Lists/ECADocuments/SR11_16/SR11_16_EN.PDF. European Court of Auditors, 2016. EU nuclear decommissioning assistance programmes in Lithuania, Bulgaria and Slovakia: some progress made since 2011, but critical challenges ahead, Available at: https://www.eca.europa.eu/Lists/ECADocuments/SR16_22/SR_NUCLEAR_DECOMMISSIONING_EN.pdf. Fellingham, L.R., 2012. Environmental remediation and restoration technologies in nuclear decommissioning projects. In M. Laraia, ed. Nuclear Decommissioning: Planning, Execution and International Experience. pp. 416–447. Fernandez, P., McCarthy, I.P. & Rakotobe-Joel, T., 2001. An evolutionary approach to benchmarking. Benchmarking: An International Journal, 8(4), pp.281–305. Flyvbjerg, B., Hon, C. & Fok, W.H., 2016. Reference class forecasting for Hong Kong’s major roadworks projects. Proceedings of the Institution of Civil Engineers - Civil Engineering, 169(6), pp.17–24. Available at: http://www.icevirtuallibrary.com/doi/10.1680/jcien.15.00075. Garnett, N. & Pickrell, S., 2000. Benchmarking for construction: theory and practice. Construction Management and Economics, 18(1), pp.55–63. Hicks, B.J.Ã., 2007. Lean information management: Understanding and eliminating waste. International Journal of Information Management, 27, pp.233–249. House of Commons, 2017. UK offshore oil and gas industry - by David Hough, Available at: file:///C:/Users/cndci/Downloads/CBP-7268 (1).pdf. IAEA/OCED-NEA, 2017. Addressing Uncertainties in Cost Estimates for Decommissioning Nuclear Facilities, Paris, France. Available at: https://www.oecd-nea.org/rwm/pubs/2017/7344-uncertainties-decom-cost.pdf. IAEA, 2011. Selection and Use of Performance Indicators in Decommissioning, Vienna. Available at: http://www-pub.iaea.org/books/IAEABooks/8566/Selection-and-Use-of-Performance-Indicators-in-Decommissioning. IAEA, 2017. Glossary. IAEA official website. Available at: https://www.iaea.org/ns/tutorials/regcontrol/intro/glossaryd.htm#D [Accessed December 3, 2017]. IAEA, 2019. The Database on Nuclear Power Reactors - Power Reactor Information System (PRIS). IAEA official website. Available at: https://www.iaea.org/pris/ [Accessed April 23, 2019]. IHS Markit, 2017. Decommissioning of Aging Offshore Oil and Gas Facilities Increasing Significantly, with Annual Spending Rising to $ 13 Billion by 2040. IHS Markit Official Website. Available at: http://news.ihsmarkit.com/press-release/energy-power-media/decommissioning-aging-offshore-oil-and-gas-facilities-increasing-si [Accessed July 21, 2017]. Invernizzi, D.C., Locatelli, G. & Brookes, N.J., Grey, M., 2017a. Similar but different: A top-down benchmarking approach to investigate nuclear decommissioning projects. In International Conference on Nuclear Engineering, Proceedings, ICONE 25. Shanghai, China. Invernizzi, D.C., Locatelli, G. & Brookes, N.J., 2017b. Managing social challenges in the nuclear decommissioning industry: A responsible approach towards better performance. International Journal of Project Management, 35(7), pp.1350–1364. Invernizzi, D.C., Locatelli, G. & Brookes, N.J., 2018. A methodology based on benchmarking to learn across megaprojects: the case of nuclear decommissioning. International Journal of Managing Projects in Business, 11(1), pp.1–18. Kaiser, M.J., 2006. Offshore Decommissioning Cost Estimation in the Gulf of Mexico. Journal of Construction Engineering and Management, 132(3), pp.249–258. LaGuardia, T.S. & Murphy, K.C., 2012. Financing and economics of nuclear facility decommissioning. In Nuclear Decommissioning: Planning, Execution and International Experience. pp. 49–86. Available at: http://linkinghub.elsevier.com/retrieve/pii/B978085709115450004X. Laraia, M., 2012b. Nuclear Decommissioning: Planning, Execution and International Experience M. Laraia, ed., Woodhead Publishing Series in Energy. Laraia, M., 2012a. Introduction to nuclear decommissioning: definitions and history. In Nuclear Decommissioning: Planning, Execution and International Experience. Woodhead Publishing Limited, pp. 1–10. Available at: http://linkinghub.elsevier.com/retrieve/pii/B9780857091154500014. Lee, N. & Lings, I., 2008. Doing Business Research: A Guide to Theory and Practice, SAGE Publications. leNews, 2017. Switzerland’s spectacular dams and their uncertain future. le News Official Website. Available at: http://lenews.ch/2017/03/24/switzerlands-spectacular-dams-and-their-uncertain-future/ [Accessed January 20, 2018]. Lin, G. et al., 2011. Identification of Key Performance Indicators for Measuring the Performance of Value Management Studies in Construction. Journal of Construction Engineering and Management, 137(9), pp.698–706. Locatelli, G., Mikic, M., et al., 2017. The Successful Delivery of Megaprojects: A Novel Research Method. Project Management Journal, 48(5), pp.1–18. Locatelli, G., Invernizzi, D.C. & Brookes, N.J., 2017. Project characteristics and performance in Europe: an empirical analysis for large transport infrastructure projects. Transportation Research Part A: Policy and Practice, 98, pp.108–122. Love, P.E.D. & Smith, J., 2004. Benchmarking, Becnhaction and Benchlearning: Rework Mitigation in Projects. Journal of Management in Engineering, 19(4), pp.147–159. Luu, V.T., Kim, S. & Huynh, T.-A., 2008. Improving project management performance of large contractors using benchmarking approach. International Journal of Project Management, 26(26), pp.758–769. Mackenzie, N. & Knipe, S., 2006. Research dilemmas: Paradigms, methods and methodology. Issues in Educational Research, 16(2), pp.1–10. Mehta, C.R. & Senchaudhuri, P., 2003. Conditional versus Unconditional Exact Tests for Comparing Two Binomials. Merrow, E.W., 2011. Industrial Megaprojects: Concepts, Strategies and Practices for Success 1st ed. John Wiley & sons, ed., Cambridge University Press. Morgan, D.L., 2007. Paradigms Lost and Pragmatism Regained Methodological Implications of Combining Qualitative and Quantitative Methods. Journal of Mixed Methods Research, 1(1), pp.48–76. NAO, 2015. Progress on the Sellafield site: an update - UK National Audit Office, Available at: https://www.nao.org.uk/wp-content/uploads/2015/03/Progress-on-the-Sellafield-Site-an-update.pdf. NAO, 2018. The Nuclear Decommissioning Authority: progress with reducing risk at Sellafield Key facts - UK National Audit Office, Available at: https://www.nao.org.uk/report/the-nuclear-decommissioning-authority-progress-with-reducing-risk-at-sellafield/. NDA, 2006. Annual Report & Account 2005/6 - Nulcear Decommissioning Authority, Available at: https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/231625/1416.pdf. NDA, 2017. Nuclear Provision: the cost of cleaning up Britain’s historic nuclear sites. UK Government official website. Available at: https://www.gov.uk/government/publications/nuclear-provision-explaining-the-cost-of-cleaning-up-britains-nuclear-legacy/nuclear-provision-explaining-the-cost-of-cleaning-up-britains-nuclear-legacy [Accessed August 1, 2017]. NDA, 2019. Nuclear Provision: the cost of cleaning up Britain’s historic nuclear sites. UK Government official website, pp.1–10. Available at: https://www.gov.uk/government/publications/nuclear-provision-explaining-the-cost-of-cleaning-up-britains-nuclear-legacy/nuclear-provision-explaining-the-cost-of-cleaning-up-britains-nuclear-legacy#contents [Accessed March 1, 2019]. OECD/NEA, 2010. Cost Estimation for Decommissioning, Available at: https://www.oecd-nea.org/rwm/reports/2010/nea6831-cost-estimation-decommissioning.pdf. OECD/NEA, 2012. International Structure for Decommissioning Costing (ISDC) of Nuclear Installations, Paris, France. Available at: http://www.oecd-nea.org/rwm/reports/2012/ISDC-nuclear-installations.pdf. OECD/NEA, 2015. The Practice of Cost Estimation for Decommissioning of Nuclear Facilities, Paris, France. Available at: https://www.oecd-nea.org/rwm/pubs/2015/7237-practice-cost-estimation.pdf. OECD/NEA, 2016. Costs of Decommissioning Nuclear Power Plants, Paris, France. Available at: http://www.oecd-nea.org/ndd/pubs/2016/7201-costs-decom-npp.pdf. Öko-Institut, 2013. Nuclear Decommissioning: Management of Costs and Risks - Gerhard Schmidt, Veronika Ustohalova, Anne Minhans, Darmstadt. Available at: http://www.europarl.europa.eu/RegData/etudes/etudes/join/2013/490680/IPOL-JOIN_ET(2013)490680_EN.pdf. Oldham, K., 2009. Decommissioning dams - costs and trends. Water Power and Dam Construction, (February 2009). Available at: http://www.waterpowermagazine.com/features/featuredecommissioning-dams-costs-and-trends/. Parente, V., Ferreira, D. & Moutinho, E., 2006. Offshore decommissioning issues: deductibility and transferability. Energy Policy, 34, pp.1992–2001. Parkhe, A., 1993. “Messy” research, methodological predispositions and theory development in international joint ventures. The Academy of Management Review, 18(2), pp.227–268. PMBOK, 2013. A Guide to the Project Management Body of Knowledge - Fifth Edition, Project Management Institute. Saunders, M., Lewis, P. & Thornhill, A., 2009. Research Methods for Business Students 5th Editio., Harlow, England: Prentice Hall. Shen, Q. & Liu, G., 2003. Critical success factors for value management studies in construction. Journal of Construction Engineering and Management, 129(5), pp.485–491. Steiner, H., 2012. Dismantling and demolition processes and technologies in nuclear decommissioning projects. In M. Laraia, ed. Nuclear Decommissioning: Planning, Execution and International Experience. pp. 293–318. Taebi, B., Roeser, S. & Van de Poel, I., 2012. The ethics of nuclear power: Social experiments, intergenerational justice, and emotions. Energy Policy, 51, pp.202–206. Topham, E. & McMillan, D., 2017. Sustainable decommissioning of an offshore wind farm. Renewable Energy, 102, pp.470–480. Turner, R. & Zolin, R., 2012. Forecasting Success on large Projects: Developing Reliable Scales to Predict Multiple Perspectives by Multiple Stakeholders Over Multiple Time Frames. Project Management Journal, 43(5), pp.87–99. Turner, J.R., Anbari, F. & Bredillet, C., 2013. Perspectives on research in project management: the nine schools. Global Business Perspectives, 1, pp.3–28. Valencia, L., 2012. Radioactive waste management in nuclear decommissioning projects. In M. Laraia, ed. Nuclear Decommissioning: Planning, Execution and International Experience. pp. 375–415. Whitton, J., 2011. Emergent Themes in Nuclear Decommissioning Dialogue: A Systems Perspective. , pp.1–15. Available at: http://clok.uclan.ac.uk/1561/1/1561_Whitton.pdf. WNA, 2019a. Decommissioning Nuclear Facilities. WNA official Website. Available at: http://www.world-nuclear.org/information-library/nuclear-fuel-cycle/nuclear-wastes/decommissioning-nuclear-facilities.aspx [Accessed April 1, 2019]. WNA, 2019b. Nuclear Power in France. WNA official website. Available at: http://www.world-nuclear.org/information-library/country-profiles/countries-a-f/france.aspx [Accessed January 1, 2019]. WNA, 2019c. Nuclear Power in Germany. World Nuclear Association Official Website. Available at: http://www.world-nuclear.org/information-library/country-profiles/countries-g-n/germany.aspx [Accessed January 1, 2019]. WNA, 2019d. Nuclear Power in the United Kingdom. World Nuclear News. Available at: http://www.world-nuclear.org/info/Country-Profiles/Countries-T-Z/United-Kingdom/ [Accessed January 10, 2019]. Wuppertal Institute, 2007. Comparison of Different Decommissioning Fund Methodologies for Nuclear Installations. Wuppertal Institute official website. Available at: https://wupperinst.org/en/p/wi/p/s/pd/160/ [Accessed April 4, 2018]. Yeung, J.F.Y. et al., 2013. Developing a Benchmarking Model for Construction Projects in Hong Kong. Journal of Construction Engineering and Management, 139(6), pp.705–716."]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"dc:type.qualificationlevel","label":"Dc Type Qualificationlevel","values":["doctoral"]},{"key":"dc:type.qualificationname","label":"Dc Type Qualificationname","values":["Ph.D"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.dcterms_iso639_2","label":"Language (ISO 639-2)","values":["eng"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.grantnumber","label":"Dc Identifier Grantnumber","values":["NNL/UA/002"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://etheses.whiterose.ac.uk/id/eprint/24193/1/Diletta%27s%20PhD%20Thesis%20-%20final%20submission%20V01.pdf"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Historically, project management research on infrastructure has mostly focused on its planning, design, and construction. However, globally, more and more infrastructure, such as nuclear and offshore oil & gas facilities, are reaching the end of life and will soon need to be decommissioned. Decommissioning projects are a new, emerging, unavoidable challenge that project managers are currently facing and will face more and more severely in the future. Primarily due to the relevance of the nuclear sector, this research focuses on Nuclear Decommissioning Projects and Programmes (NDPs), intended as site-level endeavours. NDPs are long and complex projects, whose estimates reach billions. Moreover, the cost estimates of several of these projects keep increasing while there is a limited understanding of why this happens. Triggered by these considerations, this industry-funded research develops and applies a methodology based on benchmarking to investigate the NDP characteristics that affect the NDP performance in terms of cost and time. Due to the NDP small sample size, the limited number, availability of and reliability of data and information on NDPs, and the extremely limited previous research on NDPs, inputs of this research are both secondary data and information, as well as primary ones collected through interviews with experienced practitioners. Outputs of this research include a methodology based on benchmarking that incorporates both qualitative and quantitative analysis, and as well as its application on NDPs. However, this methodology could be applied to other industrial sectors as well. The contribution of this thesis is both methodological and practical as it both develops and applies a methodology to investigate NDPs, highlighting the NDP characteristics that affect the NDP performance to ultimately improve the selection, planning, and delivery of NDPs. Moreover, by introducing the topic of NDPs to the project management community, this thesis lays the path for a number of future research, both in order to address the limitations of the current research, e.g. its focus on European NDPs, as well as to promote the in-depth investigation of each single NDP characteristics that emerged during this study."]},{"key":"dc:format","label":"Dc Format","values":["text"]},{"key":"dcterms:accessrights","label":"Dcterms Accessrights","values":["public"]},{"key":"dc:title","label":"Title","values":["Benchmarking Nuclear Decommissioning"]}]}],"canonical_facts":{"dc:contributor.advisor":["Locatelli, Giorgio","Hanson, Bruce","Brookes, Naomi J","Grey, Martin","McDermott, Lorraine"],"dc:contributor.sponsor":["UK Nuclear Decommissioning Authority"],"dc:creator":["Invernizzi, Diletta Colette"],"dc:date":["2019-05"],"dc:date.issued":["2019-05"],"dc:description.abstract":["Historically, project management research on infrastructure has mostly focused on its planning, design, and construction. However, globally, more and more infrastructure, such as nuclear and offshore oil & gas facilities, are reaching the end of life and will soon need to be decommissioned. Decommissioning projects are a new, emerging, unavoidable challenge that project managers are currently facing and will face more and more severely in the future. Primarily due to the relevance of the nuclear sector, this research focuses on Nuclear Decommissioning Projects and Programmes (NDPs), intended as site-level endeavours. NDPs are long and complex projects, whose estimates reach billions. Moreover, the cost estimates of several of these projects keep increasing while there is a limited understanding of why this happens. Triggered by these considerations, this industry-funded research develops and applies a methodology based on benchmarking to investigate the NDP characteristics that affect the NDP performance in terms of cost and time. Due to the NDP small sample size, the limited number, availability of and reliability of data and information on NDPs, and the extremely limited previous research on NDPs, inputs of this research are both secondary data and information, as well as primary ones collected through interviews with experienced practitioners. Outputs of this research include a methodology based on benchmarking that incorporates both qualitative and quantitative analysis, and as well as its application on NDPs. However, this methodology could be applied to other industrial sectors as well. The contribution of this thesis is both methodological and practical as it both develops and applies a methodology to investigate NDPs, highlighting the NDP characteristics that affect the NDP performance to ultimately improve the selection, planning, and delivery of NDPs. Moreover, by introducing the topic of NDPs to the project management community, this thesis lays the path for a number of future research, both in order to address the limitations of the current research, e.g. its focus on European NDPs, as well as to promote the in-depth investigation of each single NDP characteristics that emerged during this study."],"dc:format":["text"],"dc:identifier.grantnumber":["NNL/UA/002"],"dc:identifier.uri":["https://etheses.whiterose.ac.uk/id/eprint/24193/1/Diletta%27s%20PhD%20Thesis%20-%20final%20submission%20V01.pdf"],"dc:language.dcterms_iso639_2":["eng"],"dc:publisher.commercial":["University of Leeds"],"dc:publisher.department":["School of Civil Engineering (Leeds)"],"dc:publisher.institution":["University of Leeds"],"dc:relation.isreferencedby":["https://etheses.whiterose.ac.uk/id/eprint/24193/"],"dc:relation.references":["Anand, G. & Kodali, R., 2008. Benchmarking the benchmarking models. Benchmarking: An International Journal, 15(3), pp.257–291. Andres, M., 2006. Fisher’s exact and Barnard’s test - Encyclopedia of Statistical Sciences. Ansar, A. et al., 2014. Should we build more large dams? The actual costs of hydropower megaproject development. Energy Policy, 69, pp.43–56. Barber, E., 2004. Benchmarking the management of projects: A review of current thinking. International Journal of Project Management, 22(4), pp.301–307. Bevilacqua, M., Ciarapica, F.E. & Paciarotti, C., 2015. Implementing lean information management: the case study of an automotive company. Production Planning & Control, 26(10), pp.753–768. Bodey, E., 2006. Making the Impossible Possible: Closing Rocky Flats: ahead of schedule and under budget. Radwaste Solutions, (October 2005), pp.39–45. Bond, A., Palerm, J. & Haigh, P., 2004. Public participation in EIA of nuclear power plant decommissioning projects: a case study analysis. Environmental Impact Assessment Review, 24(6), pp.617–641. Brookes, N.J. & Locatelli, G., 2015. Power plants as megaprojects: Using empirics to shape policy, planning, and construction management. Utilities Policy, (36), pp.57–66. Bryman, A. & Bell, E., 2007. Business Research Methods Second., Oxford University Press. Büyüközkan, G. & Maire, J.-L., 1998. Benchmarking process formalization and a case study. Benchmarking: An International Journal, 5(2), pp.101–125. Cameron, K. & Lavine, M., 2006. Making the Impossible Possible: Leading Extraordinary Performance, The Rocky Flats Story, Berrett-Koehler, San Francisco, California. Cartelle Barros, J.J. et al., 2017. Comparative analysis of direct employment generated by renewable and non-renewable power plants. Energy, 139, pp.542–554. Costa, D.B. et al., 2006. Benchmarking initiatives in the construction industry: lessons learned and improvement opportunities. Journal of Management in Engineering, 22(4), pp.158–168. Davis, K., 2014. Different stakeholder groups and their perceptions of project success. International Journal of Project Management, 32(2), pp.189–201. DOE, 2013. Rocky Flats Closure Legacy report - Office of Legacy Management. Office of Legacy Management official website. Available at: http://www.lm.doe.gov/Rocky_Flats_Closure.pdf#TOC [Accessed June 16, 2016]. EC, 2018. Decommissioning of nuclear facilities. European Commission Official Website. Available at: https://ec.europa.eu/energy/en/topics/nuclear-energy/decommissioning-nuclear-facilities [Accessed October 18, 2018]. El-Mashaleh, M., Minchin, R.E. & O’Brien, W.J., 2007. Management of construction firm performance using benchmarking. Journal of Management in Engineering, 23 (1)(January), pp.10–17. European Court of Auditors, 2011. EU financial assistance for the decommissioning of nuclear plants in Bulgaria, Lithuania and Slovakia: achievements and future challenges, Available at: https://www.eca.europa.eu/Lists/ECADocuments/SR11_16/SR11_16_EN.PDF. European Court of Auditors, 2016. EU nuclear decommissioning assistance programmes in Lithuania, Bulgaria and Slovakia: some progress made since 2011, but critical challenges ahead, Available at: https://www.eca.europa.eu/Lists/ECADocuments/SR16_22/SR_NUCLEAR_DECOMMISSIONING_EN.pdf. Fellingham, L.R., 2012. Environmental remediation and restoration technologies in nuclear decommissioning projects. In M. Laraia, ed. Nuclear Decommissioning: Planning, Execution and International Experience. pp. 416–447. Fernandez, P., McCarthy, I.P. & Rakotobe-Joel, T., 2001. An evolutionary approach to benchmarking. Benchmarking: An International Journal, 8(4), pp.281–305. Flyvbjerg, B., Hon, C. & Fok, W.H., 2016. Reference class forecasting for Hong Kong’s major roadworks projects. Proceedings of the Institution of Civil Engineers - Civil Engineering, 169(6), pp.17–24. Available at: http://www.icevirtuallibrary.com/doi/10.1680/jcien.15.00075. Garnett, N. & Pickrell, S., 2000. Benchmarking for construction: theory and practice. Construction Management and Economics, 18(1), pp.55–63. Hicks, B.J.Ã., 2007. Lean information management: Understanding and eliminating waste. International Journal of Information Management, 27, pp.233–249. House of Commons, 2017. UK offshore oil and gas industry - by David Hough, Available at: file:///C:/Users/cndci/Downloads/CBP-7268 (1).pdf. IAEA/OCED-NEA, 2017. Addressing Uncertainties in Cost Estimates for Decommissioning Nuclear Facilities, Paris, France. Available at: https://www.oecd-nea.org/rwm/pubs/2017/7344-uncertainties-decom-cost.pdf. IAEA, 2011. Selection and Use of Performance Indicators in Decommissioning, Vienna. Available at: http://www-pub.iaea.org/books/IAEABooks/8566/Selection-and-Use-of-Performance-Indicators-in-Decommissioning. IAEA, 2017. Glossary. IAEA official website. Available at: https://www.iaea.org/ns/tutorials/regcontrol/intro/glossaryd.htm#D [Accessed December 3, 2017]. IAEA, 2019. The Database on Nuclear Power Reactors - Power Reactor Information System (PRIS). IAEA official website. Available at: https://www.iaea.org/pris/ [Accessed April 23, 2019]. IHS Markit, 2017. Decommissioning of Aging Offshore Oil and Gas Facilities Increasing Significantly, with Annual Spending Rising to $ 13 Billion by 2040. IHS Markit Official Website. Available at: http://news.ihsmarkit.com/press-release/energy-power-media/decommissioning-aging-offshore-oil-and-gas-facilities-increasing-si [Accessed July 21, 2017]. Invernizzi, D.C., Locatelli, G. & Brookes, N.J., Grey, M., 2017a. Similar but different: A top-down benchmarking approach to investigate nuclear decommissioning projects. In International Conference on Nuclear Engineering, Proceedings, ICONE 25. Shanghai, China. Invernizzi, D.C., Locatelli, G. & Brookes, N.J., 2017b. Managing social challenges in the nuclear decommissioning industry: A responsible approach towards better performance. International Journal of Project Management, 35(7), pp.1350–1364. Invernizzi, D.C., Locatelli, G. & Brookes, N.J., 2018. A methodology based on benchmarking to learn across megaprojects: the case of nuclear decommissioning. International Journal of Managing Projects in Business, 11(1), pp.1–18. Kaiser, M.J., 2006. Offshore Decommissioning Cost Estimation in the Gulf of Mexico. Journal of Construction Engineering and Management, 132(3), pp.249–258. LaGuardia, T.S. & Murphy, K.C., 2012. Financing and economics of nuclear facility decommissioning. In Nuclear Decommissioning: Planning, Execution and International Experience. pp. 49–86. Available at: http://linkinghub.elsevier.com/retrieve/pii/B978085709115450004X. Laraia, M., 2012b. Nuclear Decommissioning: Planning, Execution and International Experience M. Laraia, ed., Woodhead Publishing Series in Energy. Laraia, M., 2012a. Introduction to nuclear decommissioning: definitions and history. In Nuclear Decommissioning: Planning, Execution and International Experience. Woodhead Publishing Limited, pp. 1–10. Available at: http://linkinghub.elsevier.com/retrieve/pii/B9780857091154500014. Lee, N. & Lings, I., 2008. Doing Business Research: A Guide to Theory and Practice, SAGE Publications. leNews, 2017. Switzerland’s spectacular dams and their uncertain future. le News Official Website. Available at: http://lenews.ch/2017/03/24/switzerlands-spectacular-dams-and-their-uncertain-future/ [Accessed January 20, 2018]. Lin, G. et al., 2011. Identification of Key Performance Indicators for Measuring the Performance of Value Management Studies in Construction. Journal of Construction Engineering and Management, 137(9), pp.698–706. Locatelli, G., Mikic, M., et al., 2017. The Successful Delivery of Megaprojects: A Novel Research Method. Project Management Journal, 48(5), pp.1–18. Locatelli, G., Invernizzi, D.C. & Brookes, N.J., 2017. Project characteristics and performance in Europe: an empirical analysis for large transport infrastructure projects. Transportation Research Part A: Policy and Practice, 98, pp.108–122. Love, P.E.D. & Smith, J., 2004. Benchmarking, Becnhaction and Benchlearning: Rework Mitigation in Projects. Journal of Management in Engineering, 19(4), pp.147–159. Luu, V.T., Kim, S. & Huynh, T.-A., 2008. Improving project management performance of large contractors using benchmarking approach. International Journal of Project Management, 26(26), pp.758–769. Mackenzie, N. & Knipe, S., 2006. Research dilemmas: Paradigms, methods and methodology. Issues in Educational Research, 16(2), pp.1–10. Mehta, C.R. & Senchaudhuri, P., 2003. Conditional versus Unconditional Exact Tests for Comparing Two Binomials. Merrow, E.W., 2011. Industrial Megaprojects: Concepts, Strategies and Practices for Success 1st ed. John Wiley & sons, ed., Cambridge University Press. Morgan, D.L., 2007. Paradigms Lost and Pragmatism Regained Methodological Implications of Combining Qualitative and Quantitative Methods. Journal of Mixed Methods Research, 1(1), pp.48–76. NAO, 2015. Progress on the Sellafield site: an update - UK National Audit Office, Available at: https://www.nao.org.uk/wp-content/uploads/2015/03/Progress-on-the-Sellafield-Site-an-update.pdf. NAO, 2018. The Nuclear Decommissioning Authority: progress with reducing risk at Sellafield Key facts - UK National Audit Office, Available at: https://www.nao.org.uk/report/the-nuclear-decommissioning-authority-progress-with-reducing-risk-at-sellafield/. NDA, 2006. Annual Report & Account 2005/6 - Nulcear Decommissioning Authority, Available at: https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/231625/1416.pdf. NDA, 2017. Nuclear Provision: the cost of cleaning up Britain’s historic nuclear sites. UK Government official website. Available at: https://www.gov.uk/government/publications/nuclear-provision-explaining-the-cost-of-cleaning-up-britains-nuclear-legacy/nuclear-provision-explaining-the-cost-of-cleaning-up-britains-nuclear-legacy [Accessed August 1, 2017]. NDA, 2019. Nuclear Provision: the cost of cleaning up Britain’s historic nuclear sites. UK Government official website, pp.1–10. Available at: https://www.gov.uk/government/publications/nuclear-provision-explaining-the-cost-of-cleaning-up-britains-nuclear-legacy/nuclear-provision-explaining-the-cost-of-cleaning-up-britains-nuclear-legacy#contents [Accessed March 1, 2019]. OECD/NEA, 2010. Cost Estimation for Decommissioning, Available at: https://www.oecd-nea.org/rwm/reports/2010/nea6831-cost-estimation-decommissioning.pdf. OECD/NEA, 2012. International Structure for Decommissioning Costing (ISDC) of Nuclear Installations, Paris, France. Available at: http://www.oecd-nea.org/rwm/reports/2012/ISDC-nuclear-installations.pdf. OECD/NEA, 2015. The Practice of Cost Estimation for Decommissioning of Nuclear Facilities, Paris, France. Available at: https://www.oecd-nea.org/rwm/pubs/2015/7237-practice-cost-estimation.pdf. OECD/NEA, 2016. Costs of Decommissioning Nuclear Power Plants, Paris, France. Available at: http://www.oecd-nea.org/ndd/pubs/2016/7201-costs-decom-npp.pdf. Öko-Institut, 2013. Nuclear Decommissioning: Management of Costs and Risks - Gerhard Schmidt, Veronika Ustohalova, Anne Minhans, Darmstadt. Available at: http://www.europarl.europa.eu/RegData/etudes/etudes/join/2013/490680/IPOL-JOIN_ET(2013)490680_EN.pdf. Oldham, K., 2009. Decommissioning dams - costs and trends. Water Power and Dam Construction, (February 2009). Available at: http://www.waterpowermagazine.com/features/featuredecommissioning-dams-costs-and-trends/. Parente, V., Ferreira, D. & Moutinho, E., 2006. Offshore decommissioning issues: deductibility and transferability. Energy Policy, 34, pp.1992–2001. Parkhe, A., 1993. “Messy” research, methodological predispositions and theory development in international joint ventures. The Academy of Management Review, 18(2), pp.227–268. PMBOK, 2013. A Guide to the Project Management Body of Knowledge - Fifth Edition, Project Management Institute. Saunders, M., Lewis, P. & Thornhill, A., 2009. Research Methods for Business Students 5th Editio., Harlow, England: Prentice Hall. Shen, Q. & Liu, G., 2003. Critical success factors for value management studies in construction. Journal of Construction Engineering and Management, 129(5), pp.485–491. Steiner, H., 2012. Dismantling and demolition processes and technologies in nuclear decommissioning projects. In M. Laraia, ed. Nuclear Decommissioning: Planning, Execution and International Experience. pp. 293–318. Taebi, B., Roeser, S. & Van de Poel, I., 2012. The ethics of nuclear power: Social experiments, intergenerational justice, and emotions. Energy Policy, 51, pp.202–206. Topham, E. & McMillan, D., 2017. Sustainable decommissioning of an offshore wind farm. Renewable Energy, 102, pp.470–480. Turner, R. & Zolin, R., 2012. Forecasting Success on large Projects: Developing Reliable Scales to Predict Multiple Perspectives by Multiple Stakeholders Over Multiple Time Frames. Project Management Journal, 43(5), pp.87–99. Turner, J.R., Anbari, F. & Bredillet, C., 2013. Perspectives on research in project management: the nine schools. Global Business Perspectives, 1, pp.3–28. Valencia, L., 2012. Radioactive waste management in nuclear decommissioning projects. In M. Laraia, ed. Nuclear Decommissioning: Planning, Execution and International Experience. pp. 375–415. Whitton, J., 2011. Emergent Themes in Nuclear Decommissioning Dialogue: A Systems Perspective. , pp.1–15. Available at: http://clok.uclan.ac.uk/1561/1/1561_Whitton.pdf. WNA, 2019a. Decommissioning Nuclear Facilities. WNA official Website. Available at: http://www.world-nuclear.org/information-library/nuclear-fuel-cycle/nuclear-wastes/decommissioning-nuclear-facilities.aspx [Accessed April 1, 2019]. WNA, 2019b. Nuclear Power in France. WNA official website. Available at: http://www.world-nuclear.org/information-library/country-profiles/countries-a-f/france.aspx [Accessed January 1, 2019]. WNA, 2019c. Nuclear Power in Germany. World Nuclear Association Official Website. Available at: http://www.world-nuclear.org/information-library/country-profiles/countries-g-n/germany.aspx [Accessed January 1, 2019]. WNA, 2019d. Nuclear Power in the United Kingdom. World Nuclear News. Available at: http://www.world-nuclear.org/info/Country-Profiles/Countries-T-Z/United-Kingdom/ [Accessed January 10, 2019]. Wuppertal Institute, 2007. Comparison of Different Decommissioning Fund Methodologies for Nuclear Installations. Wuppertal Institute official website. Available at: https://wupperinst.org/en/p/wi/p/s/pd/160/ [Accessed April 4, 2018]. Yeung, J.F.Y. et al., 2013. Developing a Benchmarking Model for Construction Projects in Hong Kong. Journal of Construction Engineering and Management, 139(6), pp.705–716."],"dcterms:accessrights":["public"],"dc:title":["Benchmarking Nuclear Decommissioning"],"dc:type":["Thesis"],"dc:type.qualificationlevel":["doctoral"],"dc:type.qualificationname":["Ph.D"],"person:identifier.orcid":["0000000181789557"]},"updated_at":"2026-11-18T22:33:25Z"}