{"id":{"repo_id":"whiterose","oai_identifier":"oai:etheses.whiterose.ac.uk:34871"},"canonical_url":"https://search.ndltd.org/etd/whiterose/oai:etheses.whiterose.ac.uk:34871","repository":{"repo_id":"whiterose","name":"White Rose University Consortium","base_url":"https://etheses.whiterose.ac.uk/cgi/oai2"},"display":{"title":"Numerical modelling of railway track transition zone dynamic","abstract":"Railway track transitions are zones where there is an abrupt change in the track-ground structure which include changes between ballasted and slab track, bridge approaches, and tunnel entry/exits. They are often the location of rapid track deterioration, which means more frequent track maintenance is needed compared to plain line tracks. To mitigate these effects, this research aims to investigate the ability of auxiliary rails and earthwork solutions to enhance the dynamic track behaviour of transition zones, in both the short-term and long-term. To do this, a 3D finite element track model is developed using eight-node solid elements and a perfectly matched layer absorbing boundary condition. A dynamic moving train load is simulated using a rigid multi-body approach capable of accounting for train-track interaction. Three track analyses are proposed to address this aim and provide new insight into engineering track transition design. The first analysis focuses on enhancing the dynamic characteristics of ballasted tracks at transitions using auxiliary rails. It is found that using two auxiliary rails widely spaced and placed close to the running rails is useful. The potential generation of additional mini-transition zones and practical construction constraints with this approach are highlighted. The second analysis compares various earthwork solutions for embankment-bridge transition, emphasising the importance of the initial three meters from the transition zone entry. ‘Single’ and 'double' trapezoid configurations are studied to assess their effect on track dynamics. Ballasted and slab tracks are studied, and it is found the improvement is more pronounced for ballasted tracks due to their lower bending stiffness compared to slab tracks. In addition, higher train speeds are found to result in significantly greater stress increases in ballasted tracks. The third analysis focuses on predicting track transition zone settlement by comparing earthwork solutions and auxiliary rails. A double trapezoid earthwork configuration with two materials of UGM and CBM proves most efficient in reducing settlement and minimising the development of mini transition zones, remaining superior to normal track behaviour for years after construction.","abstract_html":"Railway track transitions are zones where there is an abrupt change in the track-ground structure which include changes between ballasted and slab track, bridge approaches, and tunnel entry/exits. They are often the location of rapid track deterioration, which means more frequent track maintenance is needed compared to plain line tracks. To mitigate these effects, this research aims to investigate the ability of auxiliary rails and earthwork solutions to enhance the dynamic track behaviour of transition zones, in both the short-term and long-term. To do this, a 3D finite element track model is developed using eight-node solid elements and a perfectly matched layer absorbing boundary condition. A dynamic moving train load is simulated using a rigid multi-body approach capable of accounting for train-track interaction. Three track analyses are proposed to address this aim and provide new insight into engineering track transition design. The first analysis focuses on enhancing the dynamic characteristics of ballasted tracks at transitions using auxiliary rails. It is found that using two auxiliary rails widely spaced and placed close to the running rails is useful. The potential generation of additional mini-transition zones and practical construction constraints with this approach are highlighted. The second analysis compares various earthwork solutions for embankment-bridge transition, emphasising the importance of the initial three meters from the transition zone entry. ‘Single’ and &#x27;double&#x27; trapezoid configurations are studied to assess their effect on track dynamics. Ballasted and slab tracks are studied, and it is found the improvement is more pronounced for ballasted tracks due to their lower bending stiffness compared to slab tracks. In addition, higher train speeds are found to result in significantly greater stress increases in ballasted tracks. The third analysis focuses on predicting track transition zone settlement by comparing earthwork solutions and auxiliary rails. A double trapezoid earthwork configuration with two materials of UGM and CBM proves most efficient in reducing settlement and minimising the development of mini transition zones, remaining superior to normal track behaviour for years after construction.","abstract_has_math":false,"creators":["Chumyen, Panudech"],"institution":"University of Leeds","degree_name":"Ph.D","degree_level":"doctoral","degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":["Connolly, David","Woodward, Peter"],"committee_chairs":[],"committee_members":[],"year":2024,"date_issued":"2024-04","date_published":"2024-04","updated_at":"2026-11-18T23:26:27Z","subjects":[],"languages":["eng"],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":null,"outbound_label":null,"outbound_source":null,"record_url":null,"record_label":null,"record_kind":null,"record_source":null,"download_url":"https://etheses.whiterose.ac.uk/id/eprint/34871/1/Chumyen_Panudech_Civil_PhD_2024.pdf","download_label":"Download PDF","download_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://etheses.whiterose.ac.uk/cgi/oai2?verb=GetRecord&metadataPrefix=uketd_dc&identifier=oai%3Aetheses.whiterose.ac.uk%3A34871","prefix":"uketd_dc"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Connolly, David","Woodward, Peter"]},{"key":"dc:creator","label":"Author","values":["Chumyen, Panudech"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2024-04"]},{"key":"dc:date.issued","label":"Date","values":["2024-04"]},{"key":"dc:publisher.department","label":"Dc Publisher Department","values":["School of Civil Engineering (Leeds)"]},{"key":"dc:publisher.institution","label":"Dc Publisher Institution","values":["University of Leeds"]},{"key":"dc:relation.isreferencedby","label":"Dc Relation Isreferencedby","values":["https://etheses.whiterose.ac.uk/id/eprint/34871/"]},{"key":"dc:relation.references","label":"Dc Relation References","values":["[1] G. Kouroussis, D. P. Connolly, K. Vogiatzis, and O. Verlinden, “Modelling the environmental effects of railway vibrations from different types of rolling stock: A numerical study,” Shock and Vibration, 2015. [2] A. Ramos, A. G. Correia, R. Calçada, and D. P. Connolly, “Ballastless railway track transition zones: An embankment to tunnel analysis,” Transportation Geotechnics, 2022. [3] J. E. Nicks, “The bump at the end of the railway bridge,” Texas A&M University, Texas, United States, 2009. [4] Fara A., “Transition zones for railway bridges: A study of the Sikån bridge,” Luleå University of Technology, Sweden, 2014. [5] R. D. Fröhling, H. Scheffel, and W. Ebersöhn, “The vertical dynamic response of a rail vehicle caused by track stiffness variations along the track,” Vehicle System Dynamics, vol. 25, pp. 175–187, 1996, doi: 10.1080/00423119608969194. [6] A. Paixão, J. N. Varandas, and E. Fortunato, “Dynamic behaviour in transition zones and long-term railway track performance,” Front Built Environ, vol. 7, Mar. 2021, doi: 10.3389/fbuil.2021.658909. [7] E. T. Selig and J. M. Waters, Track geotechnology and substructure management. London: Thomas Telford, 1994. [8] C. Esveld, Modern Railway Track, Second. Delft, the Netherlands, 2001. [9] S. Iwnicki, Handbook of railway vehicle dynamics. CRC press, 2006. [10] M. Georgios, “Slab Track Systems for High-Speed Railways,” School of Architecture and the Built Environment, Stockholm, Sweden, 2012. [11] Lichtberger B, Track compendium, 1st ed. Eurail Press, 2005. [12] B. Indraratna, M. Babar, T. Ngo, A. Gomes, and R. Kelly, “Improved performance of ballasted tracks at transition zones: A review of experimental and modelling approaches,” Transportation Geotechnics, vol. 21, 2019, doi: 10.1016/j.trgeo.2019.100260. [13] R. Sañudo, L. Dell’Olio, J. A. Casado, I. A. Carrascal, and S. Diego, “Track transitions in railways: A review,” Constr Build Mater, vol. 112, pp. 140–157, 2016, doi: 10.1016/j.conbuildmat.2016.02.084. [14] C. Gallage, B. Dareeju, and M. Dhanasekar, “State-of-the-art : Track degradation at bridge transitions,” in Proceedings of the 4th International Conference on Structural Engineering and Construction Management, 2013. [15] D. Li and D. Davis, “Transition of railroad bridge approaches,” Geotechnical and Geoenvironmental Engineering, vol. 131, no. 11, pp. 1392–1398, 2005, doi: 10.1061/(asce)1090-0241(2005)131:11(1392). [16] X. Lei and L. Mao, “Dynamic response analyses of vehicle and track coupled system on track transition of conventional high-speed railway,” J Sound Vib, vol. 271, pp. 1133–1146, 2004, doi: 10.1016/S0022-460X(03)00570-4. [17] W. P. Banimahd M, “3-dimensional finite element modelling of railway transitions,” in The 9th international conference on railway engineering, 2007. [18] A. Paixão, E. Fortunato, and R. Calçada, “Design and construction of backfills for railway track transition zones,” Proc Inst Mech Eng F J Rail Rapid Transit, vol. 229, no. 1, pp. 58–70, 2015, doi: 10.1177/0954409713499016. [19] H. Heydari-Noghabi, J. N. Varandas, M. Esmaeili, and J. A. Zakeri, “Investigating the influence of auxiliary rails on dynamic behaviour of railway transition zone by a 3D train-track interaction model,” Latin American Journal of Solids and Structures, vol. 14, pp. 2000–2018, 2017, doi: 10.1590/1679-78253906. [20] P. Hölscher and P. Meijers, “Literature study of knowledge and experience of transition zones,” Delft, the Netherlands, 2007. [Online]. Available: report number 415990-0011 of GeoDelft [21] J. N. Varandas, P. Hölscher, and M. A. G. Silva, “Dynamic behaviour of railway tracks on transitions zones,” Comput Struct, vol. 89, no. 13–14, pp. 1468–1479, 2011, doi: 10.1016/j.compstruc.2011.02.013. [22] D. Sasaoka and D. Davis, “Implementing track transition solutions for heavy axle load service,” in AREMA Annual Conference, Chicago,IL, 2005. [23] C. Chen and G. R. McDowell, “An investigation of the dynamic behaviour of track transition zones using discrete element modelling,” Proc Inst Mech Eng F J Rail Rapid Transit, vol. 230, no. 1, pp. 117–128, Jan. 2016, doi: 10.1177/0954409714528892. [24] C. Jayasuriya, B. Indraratna, and T. Ngoc Ngo, “Experimental study to examine the role of under sleeper pads for improved performance of ballast under cyclic loading,” Transportation Geotechnics, vol. 19, pp. 61–73, Jun. 2019, doi: 10.1016/j.trgeo.2019.01.005. [25] S. Nimbalkar and B. Indraratna, “Improved performance of ballasted rail track using geosynthetics and rubber shockmat,” Procedia Eng, vol. 142, pp. 207–214, 2016. [26] Berggren E., “Railway track stiffness: dynamic measurements and evaluation for efficient maintenance,” Royal Institute of Technology (KTH), Stockholm, 2009. [27] D. Mishra, Y. Qian, H. Huang, and E. Tutumluer, “An integrated approach to dynamic analysis of railroad track transitions behaviour,” Transportation Geotechnics, vol. 1, no. 4, pp. 188–200, Dec. 2014, doi: 10.1016/j.trgeo.2014.07.001. [28] Y. Shan, Y. Shu, and S. Zhou, “Finite-infinite element coupled analysis on the influence of material parameters on the dynamic properties of transition zones,” Constr Build Mater, vol. 148, pp. 548–558, 2017, doi: 10.1016/j.conbuildmat.2017.05.071. [29] M. Esmaeili, M. Kamali, and H. Heydari-noghabi, “Numerical investigation of railway transition zones stiffened with auxiliary rails,” in Proceedings of the Institution of Civil Engineers - Transport, 2017. [30] A. Namura and T. Suzuki, “Evaluation of Countermeasures against Differential Settlement at Track Transitions,” 2007. [31] M. Shahraki, C. Warnakulasooriya, and K. J. Witt, “Numerical study of transition zone between ballasted and ballastless railway track,” Transportation Geotechnics, vol. 3, pp. 58–67, 2015, doi: 10.1016/j.trgeo.2015.05.001. [32] R. Sañudo et al., “Monitoring track transition zones in railways,” Sensors, vol. 22, no. 1, Jan. 2022, doi: 10.3390/s22010076. [33] W. Qiang, G. Jing, D. P. Connolly, and P. Aela, “The use of recycled rubber in ballasted railway tracks: A review,” Journal of Cleaner Production, vol. 420. Elsevier Ltd, Sep. 25, 2023. doi: 10.1016/j.jclepro.2023.138339. [34] M. Sol-Sánchez, F. Moreno-Navarro, and M. C. Rubio-Gámez, “The use of elastic elements in railway tracks: A state of the art review,” Construction and Building Materials, vol. 75. Elsevier Ltd, pp. 293–305, Jan. 30, 2015. doi: 10.1016/j.conbuildmat.2014.11.027. [35] M. Sol-Sánchez, F. Moreno-Navarro, and M. C. Rubio-Gámez, “Viability analysis of deconstructed tires as material for rail pads in high-speed railways,” Mater Des, vol. 64, pp. 407–414, Dec. 2014, doi: 10.1016/j.matdes.2014.07.071. [36] D. Read and D. Li, “Design of track transitions,” TCRP Research Results Digest, 2006. [37] H. Wang and V. L. Markine, “Methodology for the comprehensive analysis of railway transition zones,” Comput Geotech, vol. 99, pp. 64–79, 2018, doi: 10.1016/j.compgeo.2018.03.001. [38] V. Sarik, “Decision-making model for track system of high-speed rail lines,” 2018. [39] Greenrail company, “Railway sleeper product.” Accessed: Sep. 16, 2023. [Online]. Available: https://www.greenrailgroup.com/en/home/ [40] P. J. Gräbe, B. F. Mtshotana, M. M. Sebati, and E. Q. Thünemann, “The effects of under-sleeper pads on sleeper-ballast interaction,” Journal of the South African Institution of Civil Engineering, vol. 58, no. 2, pp. 35–41, Jun. 2016, doi: 10.17159/2309-8775/2016/v58n2a4. [41] W. Qiang, G. Jing, D. P. Connolly, and P. Aela, “The use of recycled rubber in ballasted railway tracks: A review,” Journal of Cleaner Production, vol. 420. Elsevier Ltd, Sep. 25, 2023. doi: 10.1016/j.jclepro.2023.138339. [42] T. Abadi, L. Le Pen, A. Zervos, and W. Powrie, “Effect of Sleeper Interventions on Railway Track Performance,” Journal of Geotechnical and Geoenvironmental Engineering, vol. 145, no. 4, Apr. 2019, doi: 10.1061/(asce)gt.1943-5606.0002022. [43] S. K. Navaratnarajah, B. Indraratna, and N. T. Ngo, “Influence of under sleeper pads on ballast behaviour under cyclic loading: Experimental and Numerical Studies,” Journal of Geotechnical and Geoenvironmental Engineering, vol. 144, no. 9, Sep. 2018, doi: 10.1061/(asce)gt.1943-5606.0001954. [44] R. Insa, P. Salvador, J. Inarejos, and L. Medina, “Analysis of the performance of under-sleeper pads in high-speed line transition zones,” Proceedings of the Institution of Civil Engineers - Transport, vol. 167, no. 2, pp. 63–77, 2014, doi: 10.1680/tran.11.00033. [45] C. Ribeiro, A. Paixao, E. Fortunato, and R. Calcada, “Under sleeper pads in transition zones at railway underpasses : Numerical modelling and experimental validation,” Structure and Infrastructure Engineering, 2015, doi: 10.1080/15732479.2014.970203. [46] M. Ahac, S. Lakusic, and I. Haladin, “Experimental investigation of railway track with under sleeper pad,” in 10th Slovenian Road and Transportation Congress, 2010. [Online]. Available: https://www.researchgate.net/publication/272815724 [47] J. Kennedy, P. K. Woodward, G. Medero, and M. Banimahd, “Reducing railway track settlement using three-dimensional polyurethane polymer reinforcement of the ballast,” Constr Build Mater, vol. 44, pp. 615–625, 2013, doi: 10.1016/j.conbuildmat.2013.03.002. [48] D. Gundavaram and S. K. K. Hussaini, “Polyurethane-based stabilisation of railroad ballast – a critical review,” International Journal of Rail Transportation, vol. 7, no. 3. Taylor and Francis Ltd., pp. 219–240, Jul. 03, 2019. doi: 10.1080/23248378.2019.1570477. [49] M. S. Dersch, E. Tutumluer, C. T. Peeler, and D. K. Bower, “Polyurethane coating of railroad ballast aggregate for improved performance,” in the 2010 Joint Rail Conference, 2010. [Online]. Available: https://proceedings.asmedigitalcollection.asme.org [50] P. K. Woodward, J. Kennedy, G. M. Medero, and M. Banimahd, “Application of in situ polyurethane geocomposite beams to improve the passive shoulder resistance of railway track,” Proc Inst Mech Eng F J Rail Rapid Transit, vol. 226, no. 3, pp. 294–304, May 2012, doi: 10.1177/0954409711423460. [51] Stanislav L et al., “Guidelines on the use of novel construction and maintenance techniques within the operational railway environment,” 2018. [52] G. Jing, L. Qie, V. Markine, and W. Jia, “Polyurethane reinforced ballasted track: Review, innovation and challenge,” Construction and Building Materials, vol. 208. Elsevier Ltd, pp. 734–748, May 30, 2019. doi: 10.1016/j.conbuildmat.2019.03.031. [53] B. Zuada Coelho, J. Priest, and P. Hölscher, “Dynamic behaviour of transition zones in soft soils during regular train traffic,” Proc Inst Mech Eng F J Rail Rapid Transit, vol. 232, no. 3, pp. 645–662, Mar. 2018, doi: 10.1177/0954409716683078. [54] B. Coelho, P. Hölscher, J. Priest, W. Powrie, and F. Barends, “An assessment of transition zone performance,” in Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit, Mar. 2011, pp. 129–139. doi: 10.1177/09544097JRRT389. [55] C. Chen, “Discrete element modelling of geogrid-reinforced railway ballast and track transition zones .,” University of Nottingham, 2013. [56] B. Indraratna, Y. Qi, T. N. Ngo, and C. Rujikiatkamjorn, “Use of geogrids and recycled rubber in railroad infrastructure for enhanced performance,” Geosciences (Basel), 2019, doi: 10.3390/geosciences9010030. [57] A. Lanca, Z. Dimitrovová, M. Barroso, and S. Fontul, “Numerical analysis of geogrid contribution to railway track reinforcement,” in MATEC Web of Conferences, 2018, pp. 1–6. [58] D. P. Connolly and H. S. Yu, “A shakedown limit calculation method for geogrid reinforced soils under moving loads,” Geotextiles and Geomembranes, vol. 49, pp. 688–696, 2021, doi: 10.1016/j.geotexmem.2020.11.009. [59] A. Arulrajah, M. W. Bo, A. Abdullah, and M. Leong, “Geosynthetic applications in high-speed railways: A case study,” in Proceedings of the Institution of Civil Engineers Ground Improvement, 2015. [60] Z. Yu, P. K. Woodward, O. Laghrouche, and D. P. Connolly, “True triaxial testing of geogrid for high speed railways,” Transportation Geotechnics, vol. 20, 2019, doi: 10.1016/j.trgeo.2019.100247. [61] Ocean Global Company, “Application of Ocean Geogrids in Railways.” Accessed: Sep. 19, 2023. [Online]. Available: https://oceangeosynthetics.com/application-of-ocean-geogrids-in-railways/ [62] Z. Yu, D. P. Connolly, P. K. Woodward, and O. Laghrouche, “Settlement behaviour of hybrid asphalt-ballast railway tracks,” Constr Build Mater, vol. 208, pp. 808–817, 2019, doi: 10.1016/j.conbuildmat.2019.03.047. [63] S. T. Wilk, T. D. Stark, and J. G. Rose, “Evaluating tie support at railway bridge transitions,” Proc Inst Mech Eng F J Rail Rapid Transit, vol. 230, no. 4, pp. 1336–1350, May 2016, doi: 10.1177/0954409715596192. [64] M. Labrado Palomo, F. Roca Barceló, F. Ribes Llario, and J. Real Herráiz, “Effect of vehicle speed on the dynamics of track transitions,” Journal of Vibration and Control, vol. 24, no. 21, pp. 5118–5128, Nov. 2018, doi: 10.1177/1077546317745254. [65] T. D. Stark and S. T. Wilk, “Root cause of differential movement at bridge transition zones,” Proc Inst Mech Eng F J Rail Rapid Transit, 2015, doi: 10.1177/0954409715589620. [66] D. M. Setiawan, “Worldwide hot mix asphalt layer application and scrap rubber and bitumen emulsion studies on railway track-bed,” Semesta Teknika, 2018, doi: 10.18196/st.212223. [67] J. G. Rose, “Asphalt Underlayment Railway Trackbeds : Designs , Applications , and Long-Term Performance Evaluations,” 2017. [68] I. Gallego Giner and A. López Pita, “Numerical simulation of embankment-structure transition design,” Proc Inst Mech Eng F J Rail Rapid Transit, vol. 223, no. 4, pp. 331–343, Jul. 2009, doi: 10.1243/09544097JRRT234. [69] Y. Shan, B. Albers, and S. A. Savidis, “Influence of different transition zones on the dynamic response of track – subgrade systems,” Comput Geotech, vol. 48, pp. 21–28, 2013, doi: 10.1016/j.compgeo.2012.09.006. [70] D. P. Connolly, A. Giannopoulos, and M. C. Forde, “Numerical modelling of ground borne vibrations from high-speed rail lines on embankments,” Soil Dynamics and Earthquake Engineering, vol. 46, 2013, doi: 10.1016/j.soildyn.2012.12.003. [71] E. Fortunato, A. Paixão, and R. Calçada, “Railway track transition zones: Design, Construction, Monitoring and Numerical modelling,” International Journal of Railway Technology, vol. 2, no. 4, pp. 33–58, 2013, doi: 10.4203/ijrt.2.4.3. [72] G. Lazorenko, A. Kasprzhitskii, Z. Khakiev, and V. Yavna, “Dynamic behaviour and stability of soil foundation in heavy haul railway tracks: A review,” Constr Build Mater, vol. 205, pp. 111–136, 2019, doi: 10.1016/j.conbuildmat.2019.01.184. [73] I. Gue, S. Sew, I. Tan, and Y. Chin, “Geotechnical solutions for high -speed track embankment-A brief overview,” in The Technical Seminar Talk–PWI Annual Convention, 2001. [74] W. Li and X. Bian, “Dynamic performance of pile-supported bridge- embankment transition zones under high-speed train moving loads,” Procedia Eng, vol. 143, pp. 1059–1067, 2016, doi: 10.1016/j.proeng.2016.06.101. [75] Network Rail, “Track work instruction : How to regulate ballast by hand,” 2004. [76] Network Rail, “Track work information sheet : How to carry out measured shovel packing (MSP),” 2007. [77] E. Tutumluer, T. D. Stark, D. Mishra, and J. P. Hyslip, “Investigation and mitigation of differential movement at railway transitions for US high speed passenger rail and joint passenger/freight corridors,” in Proceeding of the Joint Rail Conference: American Society of Mechanical Engineers, 2012, pp. 75–84. [78] H. Boler, D. Mishra, E. Tutumluer, S. Chrismer, and J. P. Hyslip, “Stone blowing as a remedial measure to mitigate differential movement problems at railroad bridge approaches,” Proc Inst Mech Eng F J Rail Rapid Transit, vol. 233, no. 1, pp. 63–72, Jan. 2019, doi: 10.1177/0954409718778654. [79] H. Wang and V. Markine, “Corrective countermeasure for track transition zones in railways : Adjustable fastener,” Eng Struct, vol. 169, pp. 1–14, 2018, doi: 10.1016/j.engstruct.2018.05.004. [80] Office of Rail and Road, “Management of Track Geometry by On-Track Machines : Targeted Assurance Review,” 2021. [81] W. Jia, V. Markine, M. Carvalho, D. P. Connolly, and Y. Guo, “Design of a concept wedge-shaped self-levelling railway sleeper,” Constr Build Mater, vol. 386, Jul. 2023, doi: 10.1016/j.conbuildmat.2023.131524. [82] K. Muramoto, T. Nakamura, and T. Sakurai, “A Hanging sleepers preventing method using Automatic Irregularity-Correcting Short (AICS) sleeper,” in The 11st World Congress on Railway Research (WCRR), 2016. [83] J. Xu, L. J. Butler, and M. Z. E. B. Elshafie, “Experimental and numerical investigation of the performance of self-sensing concrete sleepers,” Struct Health Monit, vol. 19, no. 1, pp. 66–85, Jan. 2020, doi: 10.1177/1475921719834506. [84] G. R. Lui and S. S. Quek, The finite element method : A practical course. Elsevier Ltd, 2003. [85] U. Basu, “Explicit finite element perfectly matched layer for transient three-dimensional elastic waves,” Int J Numer Methods Eng, pp. 151–176, 2009. [86] W. Zhai, Z. Han, Z. Chen, L. Ling, and S. Zhu, “Train-track-bridge dynamic interaction : a state-of- the-art review,” Vehicle System Dynamics, pp. 984–1027, 2019, doi: 10.1080/00423114.2019.1605085. [87] M. Banimahd, J. Kennedy, P. K. Woodward, and G. M. Medero, “Behaviour of train – track interaction in stiffness transitions,” in Proceedings of the Institution of Civil Engineers - Transport, 2012, pp. 205–214. [88] D. Stefens, “Identification and development of a model of railway track,” 2005. [89] G. Liu, The Finite Element Method: A Practical Course. Elsevier Science Ltd, 2003. [90] L. Noels, L. Stainier, and J. P. Ponthot, “Combined implicit/explicit time-integration algorithms for the numerical simulation of sheet metal forming,” J Comput Appl Math, vol. 168, no. 1–2, pp. 331–339, Jul. 2004, doi: 10.1016/j.cam.2003.12.004. [91] G. Kouroussis, D. P. Connolly, G. Alexandrou, and K. Vogiatzis, “Railway ground vibrations induced by wheel and rail singular defects,” Vehicle System Dynamics, vol. 53, 2015, doi: 10.1080/00423114.2015.1062116. [92] D. P. Connolly, G. Kouroussis, O. Laghrouche, C. L. Ho, and M. C. Forde, “Benchmarking railway vibrations – Track , vehicle , ground and building effects,” Constr Build Mater, vol. 92, pp. 64–81, 2015, doi: 10.1016/j.conbuildmat.2014.07.042. [93] L. Xu and T. Lu, “Influence of track flexibility and spatial coherence of track irregularity on vehicle-slab track interaction: frequency-domain analysis,” International Journal of Rail Transportation, vol. 9, no. 4, pp. 342–367, 2021, doi: 10.1080/23248378.2020.1811170. [94] S. G. Koroma, D. J. Thompson, M. F. M. Hussein, and E. Ntotsios, “A mixed space-time and wavenumber-frequency domain procedure for modelling ground vibration from surface railway tracks,” J Sound Vib, vol. 400, pp. 508–532, 2017, doi: 10.1016/j.jsv.2017.04.015. [95] E. Zea, L. Manzari, G. Squicciarini, L. Feng, D. Thompson, and I. L. Arteaga, “Wavenumber–domain separation of rail contribution to pass-by noise,” J Sound Vib, vol. 409, pp. 24–42, Nov. 2017, doi: 10.1016/j.jsv.2017.07.040. [96] A. C. Lamprea-Pineda, D. P. Connolly, and M. F. M. Hussein, “Beams on elastic foundations – A review of railway applications and solutions,” Transportation Geotechnics, vol. 33, 2022, doi: 10.1016/j.trgeo.2021.100696. [97] E. Aggestam and J. C. O. Nielsen, “Multi-objective optimisation of transition zones between slab track and ballasted track using a genetic algorithm,” J Sound Vib, vol. 446, pp. 91–112, 2019, doi: 10.1016/j.jsv.2019.01.027. [98] R. Sañudo, M. Cerrada, B. Alonso, and L. dell’Olio, “Analysis of the influence of support positions in transition zones: A numerical analysis,” Constr Build Mater, vol. 145, pp. 207–217, 2017, doi: 10.1016/j.conbuildmat.2017.03.204. [99] X. Lei and L. Mao, “Dynamic response analyses of vehicle and track coupled system on track transition of conventional high- speed railway,” J Sound Vib, vol. 271, no. 3–5, pp. 1133–1146, Apr. 2004, doi: 10.1016/S0022-460X(03)00570-4. [100] A. Paixão, E. Fortunato, and R. Calçada, “Transition zones to railway bridges: Track measurements and numerical modelling,” Eng Struct, vol. 80, pp. 435–443, 2014, doi: 10.1016/j.engstruct.2014.09.024. [101] P. Punetha, K. Maharjan, and S. Nimbalkar, “Finite element modelling of the dynamic response of critical zones in a ballasted railway track,” Front Built Environ, vol. 7, pp. 1–11, 2021, doi: 10.3389/fbuil.2021.660292. [102] M. Wu, Z. Ba, and J. Liang, “A procedure for 3D simulation of seismic wave propagation considering source-path-site effects: Theory, Verification and Application,” Earthquake Engineering Structural Dynamics, vol. 51, no. 12, pp. 2925–2955, 2022. [103] P. Galvín, A. Romero, and J. Dominguez, “Fully three-dimensional analysis of high-speed train – track – soil-structure dynamic interaction,” J Sound Vib, vol. 329, pp. 5147–5163, 2010, doi: 10.1016/j.jsv.2010.06.016. [104] D. P. Connolly, K. Dong, P. A. Costa, P. Soares, and P. K. Woodward, “High-speed railway ground dynamics: a multi-model analysis,” International Journal of Rail Transportation, vol. 8, pp. 324–346, 2020. [105] C. Ngamkhanong, Q. Yan, T. Li, and S. Kaewunruen, “Dynamic train-track interactions over railway track stiffness transition zones using baseplate fastening systems,” Eng Fail Anal, vol. 118, 2020, doi: 10.1016/j.engfailanal.2020.104866. [106] E. Koch and P. Hudacsek, “3D dynamic modelling of transition zones,” Zenodo, vol. 11, no. 9, pp. 1310–1316, 2017. [107] A. Paixão, J. Nuno, E. Fortunato, and R. Calçada, “Numerical simulations to improve the use of under sleeper pads at transition zones to railway bridges,” Eng Struct, vol. 164, pp. 169–182, 2018, doi: 10.1016/j.engstruct.2018.03.005. [108] J. N. Varandas, P. Hölscher, and M. A. G. Silva, “Three-dimensional track-ballast interaction model for the study of a culvert transition,” Soil Dynamics and Earthquake Engineering, vol. 89, pp. 116–127, Oct. 2016, doi: 10.1016/j.soildyn.2016.07.013. [109] Y. Çati, S. Gökçeli, Ö. Anil, and C. S. Korkmaz, “Experimental and numerical investigation of usp for optimization of transition zone of railway,” Eng Struct, vol. 209, 2020, doi: 10.1016/j.engstruct.2019.109971. [110] T. Xin, Y. Ding, P. Wang, and L. Gao, “Application of rubber mats in transition zone between two different slab tracks in high-speed railway q N T Nd v,” Constr Build Mater, vol. 243, 2020, doi: 10.1016/j.conbuildmat.2020.118219. [111] X. Jia, X. Liu, and G. Li, “A non-reflective boundary model applied to finite element analysis of railway track structure,” in Proceedings of the Asia-Pacific Conference on Intelligent Medical 2018 & International Conference on Transportation and Traffic Engineering 2018, 2018, pp. 15–19. [112] J. Barbosa, J. Park, and E. Kausel, “Perfectly matched layers in the thin layer method,” Comput Methods Appl Mech Eng, vol. 217–220, pp. 262–274, 2012, doi: 10.1016/j.cma.2011.12.006. [113] D. P. Connolly, A. Giannopoulos, and M. C. Forde, “A higher order perfectly matched layer formulation for finite-difference time-domain seismic wave modelling,” Geophysics, 2015. [114] P. Hu, C. Zhang, S. Jian, Y. Wang, W. Wang, and W. Hui, “Dynamic responses of bridge-embankment transitions in high-speed railway: Field tests and data analyses,” Eng Struct, vol. 175, pp. 565–576, 2018, doi: 10.1016/j.engstruct.2018.08.079. [115] C. Charoenwong, D. P. Connolly, P. K. Woodward, P. Galvín, and P. A. Costa, “Analytical forecasting of long-term railway track settlement,” Comput Geotech, vol. 143, 2022, doi: 10.1016/j.compgeo.2021.104601. [116] C. Charoenwong et al., “Railway slab vs ballasted track: A comparison of track geometry degradation,” Constr Build Mater, vol. 378, May 2023, doi: 10.1016/j.conbuildmat.2023.131121. [117] C. Charoenwong, D. P. Connolly, K. Odolinski, P. Alves Costa, P. Galvín, and A. Smith, “The effect of rolling stock characteristics on differential railway track settlement: An engineering-economic model,” Transportation Geotechnics, vol. 37, Nov. 2022, doi: 10.1016/j.trgeo.2022.100845. [118] X. Bian, W. Li, Y. Qian, A. M. Asce, E. Tutumluer, and M. Asce, “Micromechanical Particle Interactions in Railway Ballast through DEM Simulations of Direct Shear Tests,” American Society of Civil Engineers, 2019, doi: 10.1061/(ASCE)GM.1943. [119] X. Zhang, C. Zhao, and W. Zhai, “Dynamic behaviour analysis of high-speed railway ballast under moving vehicle loads using discrete element method,” International Journal of Geomechanics, vol. 17, no. 7, Jul. 2017, doi: 10.1061/(asce)gm.1943-5622.0000871. [120] C. Shi, C. Zhao, X. Zhang, and A. Andersson, “Analysis on dynamic performance of different track transition forms using the discrete element / finite difference hybrid method,” Comput Struct, vol. 230, 2020, doi: 10.1016/j.compstruc.2019.106187. [121] T. T. Nguyen and B. Indraratna, “A coupled CFD–DEM approach to examine the hydraulic critical state of soil under increasing hydraulic gradient,” International Journal of Geomechanics, vol. 20, no. 9, pp. 1–15, 2020, doi: 10.1061/(asce)gm.1943-5622.0001782. [122] Railway Technical Research Institute, “Design standards for Railway Structures and Commentary (Earth Structures),” Tokyo, Japan, 2007. [123] F. Tatsuoka, M. Tateyama, H. Aoki, and K. Watanabe, “Bridge abutment made of cement-mixed gravel backfill,” Ground Improvement Case Histories: Chemical, Electrokinetic, Thermal and Bioengineering Methods, pp. 351–399, 2015. [124] National Railway Administration of P.R. China, “TB 1062-2014: Code for design of high-speed railway,” Beijing, China, 2014. [125] National Railway Administration of P.R. China, “TB 10001-2005: Design standards for railway embankments,” Beijing, China, 2005. [126] International union of railways, “UIC 719R: Earthworks and track bed for railway lines,” 2008. [127] K. Liu, Q. Su, P. Ni, C. Zhou, W. Zhao, and F. Yue, “Evaluation on the dynamic performance of bridge approach backfilled with fibre reinforced lightweight concrete under high-speed train loading,” Comput Geotech, vol. 104, pp. 42–53, 2018, doi: 10.1016/j.compgeo.2018.08.003. [128] Y. Shan, X. Li, and S. Zhou, “Multi-objective optimisation methodology for stiffness combination design of bridge-embankment transition zones in high-speed railways,” Comput Geotech, vol. 155, 2023. [129] D. Li, J. Hyslip, T. Sussmann, and S. Chrismer, Railway Geotechnics. CRC Press Taylor&Francis Group, 2016. [130] A. Furkan Esen, “Experimental and numerical analysis of high-speed railway infrastructure,” Heriot-Watt University, 2022. [131] Konstantinos Tzanakakis, The Railway Track and Its Long Term Behaviour, 1st ed. Berlin: Springer , 2013. [132] F. Lekarp, U. Isacsson, and A. Dawson, “State of the art. I: Resilient response of unbound aggregates,” J Transp Eng, vol. 126, no. 1, pp. 66–75, 2000, doi: 10.1061/(ASCE)0733-947X(2000)126:1(66). [133] B. Indraratna, D. J. Armaghani, A. Gomes Correia, H. Hunt, and T. Ngo, “Prediction of resilient modulus of ballast under cyclic loading using machine learning techniques,” Transportation Geotechnics, vol. 38, Jan. 2023, doi: 10.1016/j.trgeo.2022.100895. [134] B. T. Nguyen and A. Mohajerani, “Resilient modulus of fine-grained soil and a simple testing and calculation method for determining an average resilient modulus value for pavement design,” Transportation Geotechnics, vol. 7, pp. 59–70, Jun. 2016, doi: 10.1016/j.trgeo.2016.05.001. [135] H. Wang and V. Markine, “Modelling of the long-term behaviour of transition zones : Prediction of track settlement,” Eng Struct, vol. 156, pp. 294–304, 2018, doi: 10.1016/j.engstruct.2017.11.038. [136] G. Ognibene et al., “Analysis of a bridge approach: Long-term behaviour from short-term response,” in Railway engineering, 2019. [Online]. Available: https://www.researchgate.net/publication/334544518 [137] K. Nasrollahi, J. C. O. Nielsen, E. Aggestam, J. Dijkstra, and M. Ekh, “Prediction of long-term differential track settlement in a transition zone using an iterative approach,” Eng Struct, vol. 283, May 2023, doi: 10.1016/j.engstruct.2023.115830. [138] J. N. Varandas, P. Hölscher, and M. A. G. Silva, “Settlement of ballasted track under traffic loading: Application to transition zones,” Proc Inst Mech Eng F J Rail Rapid Transit, vol. 228, no. 3, pp. 242–259, Mar. 2014, doi: 10.1177/0954409712471610. [139] Y. Qian, E. Tutumluer, Y. M. A. Hashash, J. Ghaboussi, and D. D. Davis, “Ballast settlement ramp to mitigate differential settlement in a bridge transition zone,” Transp Res Rec, vol. 2476, pp. 45–52, 2015, doi: 10.3141/2476-07. [140] Y. Shan, S. Zhou, B. Wang, and C. L. Ho, “Differential settlement prediction of ballasted tracks in bridge–embankment transition zones,” Journal of Geotechnical and Geoenvironmental Engineering, vol. 146, no. 9, Sep. 2020, doi: 10.1061/(asce)gt.1943-5606.0002307. [141] I. Grossoni, S. Hawksbee, P. Jorge, Y. Bezin, and H. Magalhaes, “Prediction of track settlement at high-speed railway transitions between embankment and bridge in the proximity of a turnout,” Transportation Geotechnics, vol. 37, Nov. 2022, doi: 10.1016/j.trgeo.2022.100879. [142] ORE, “Question D71: Stresses in the Rails, the Ballast and in the Formation Resulting from Traffic Loads. Stresses in the formation (results of the third phase ; measurements under dynamic conditions),” 1970. [143] T. Abadi, L. Le Pen, A. Zervos, and W. Powrie, “A review and evaluation of ballast settlement models using results from the Southampton Railway Testing Facility (SRTF),” in Procedia Engineering, Elsevier Ltd, 2016, pp. 999–1006. doi: 10.1016/j.proeng.2016.06.089. [144] B. Dingqing Li, A. Member, and E. T. Selig, “Cumulative plastic deformation for fine-grained subgrade soils,” Journal of Geotechnical Engineering, vol. 122, no. 12, pp. 1006–1013, 1996. [145] J. Shih, “Model of vehicle/track/ground interaction in the time domain,” 2017. [146] J. Hallquist, LS-DYNA keyword user’s manual, vol. 1, no. May. CA: Livermore software technology corporation (LSTC), 2007. [147] J. Fish, T. Belytschko, and J. Wiley, A First Course in Finite Elements. 2007. [148] S. Moaveni, Finite Element Analysis, Theory and application with ANSYS, . 1999. [149] L. Fryba, Vibration of solids and structure under moving loads, 3rd ed. London: Thomas Telford, 1999. [150] J. O. Hallquist, LS-DYNA Theory manual, no. March. Livermore, California: Livermore Software Technology Corporation, 2006. [151] E. Arlaud, S. C. D’Aguiar, and E. Balmes, “Receptance of railway tracks at low frequency : Numerical and experimental approaches,” Transportation Geotechnics, vol. 9, pp. 1–16, 2016, doi: 10.1016/j.trgeo.2016.06.003. [152] S. Matias, “Numerical Modelling and Design of Slab tracks - Comparison with Ballasted Tracks,” 2014. [153] C. Cruz and E. Miranda, “A critical review of the Rayleigh damping model,” in Proceedings of the 16th World Conference on Earthquake Engineering, 2018. [154] A. Alipour and F. Zareian, “Study Rayleigh damping in structures; Uncertainties and Treatments,” in Proceedings of the 14th World Conference on Earthquake Engineering, 2008. [155] A. Mosleh, P. A. Costa, and R. Calcada, “A new strategy to estimate static loads for the dynamic weighing in motion of railway vehicles,” in Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit, 2020, pp. 183–200. doi: 10.1177/0954409719838115. [156] M. R. Pajand and M. T. Hakkak, “Nonlinear analysis of truss structures using dynamic relaxation,” International Journal of Engineering, vol. 19, no. 1, 2006. [157] N. Correia, A. Colaço, P. A. Costa, and R. Calçada, “Experimental analysis of track-ground vibrations on a stretch of the Portuguese railway network,” Soil Dynamics and Earthquake Engineering, vol. 90, pp. 358–380, 2016, doi: 10.1016/j.soildyn.2016.09.003. [158] J. F. Ruiz, P. A. Costa, R. Calçada, L. E. Medina, and A. Colaço, “Study of ground vibrations induced by railway traffic in a 3D FEM model formulated in the time domain : Experimental validation,” Structure and Infrastructure Engineering, vol. 13, no. 5, pp. 652–664, 2017, doi: 10.1080/15732479.2016.1172649. [159] P. A. Costa and S. Cardoso, “Experimental validation of a 2.5D FEM-BEM model for the assessment of vibrations induced by Traffic,” in Proceeding of the 3rd Computational Methods in Structural Dynamics and Earhquake Engineering, 2011, pp. 25–28. [160] H. Heydari, J. A. Zakeri, and M. Esmaeili, “Field study using additional rails and an approach slab as a transition zone from slab track to the ballasted track,” in Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit, 2017. doi: 10.1177/0954409717708527. [161] P. Chumyen, D. P. Connolly, P. K. Woodward, and V. Markine, “The effect of soil improvement and auxiliary rails at railway track transition zones,” Soil Dynamics and Earthquake Engineering, vol. 155, 2022, doi: 10.1016/j.soildyn.2022.107200. [162] P. Chumyen, D. P. Connolly, P. K. Woodward, and V. Markine, “A comparison of earthwork designs for railway transition zones,” Constr Build Mater, vol. 395, p. 132295, Sep. 2023, doi: 10.1016/j.conbuildmat.2023.132295. [163] T. D. Akinosho et al., “Deep learning in the construction industry: A review of present status and future innovations,” Journal of Building Engineering, vol. 32, 2020, doi: 10.1016/j.jobe.2020.101827. [164] A. B. Goktepe and A. H. Lav, “Method for Optimizing Earthwork Considering Soil Properties in the Geometric Design of Highways,” Journal of Surveying Engineering, vol. 130, no. 4, pp. 183–190, 2004, doi: 10.1061/(asce)0733-9453(2004)130:4(183). [165] W. L. Hare, V. R. Koch, and Y. Lucet, “Models and algorithms to improve earthwork operations in road design using mixed integer linear programming,” Eur J Oper Res, vol. 215, no. 2, pp. 470–480, 2011, doi: 10.1016/j.ejor.2011.06.011. [166] Y. Villar, M. Menéndez, Z. Fernández, and A. Bernardo, “Sustainable earthworks: Optimization with the ICOM method,” Energy Reports, Nov. 2020, doi: 10.1016/j.egyr.2020.08.060."]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"dc:type.qualificationlevel","label":"Dc Type Qualificationlevel","values":["doctoral"]},{"key":"dc:type.qualificationname","label":"Dc Type Qualificationname","values":["Ph.D"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.dcterms_iso639_2","label":"Language (ISO 639-2)","values":["eng"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://etheses.whiterose.ac.uk/id/eprint/34871/1/Chumyen_Panudech_Civil_PhD_2024.pdf"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Railway track transitions are zones where there is an abrupt change in the track-ground structure which include changes between ballasted and slab track, bridge approaches, and tunnel entry/exits. They are often the location of rapid track deterioration, which means more frequent track maintenance is needed compared to plain line tracks. To mitigate these effects, this research aims to investigate the ability of auxiliary rails and earthwork solutions to enhance the dynamic track behaviour of transition zones, in both the short-term and long-term. To do this, a 3D finite element track model is developed using eight-node solid elements and a perfectly matched layer absorbing boundary condition. A dynamic moving train load is simulated using a rigid multi-body approach capable of accounting for train-track interaction. Three track analyses are proposed to address this aim and provide new insight into engineering track transition design. The first analysis focuses on enhancing the dynamic characteristics of ballasted tracks at transitions using auxiliary rails. It is found that using two auxiliary rails widely spaced and placed close to the running rails is useful. The potential generation of additional mini-transition zones and practical construction constraints with this approach are highlighted. The second analysis compares various earthwork solutions for embankment-bridge transition, emphasising the importance of the initial three meters from the transition zone entry. ‘Single’ and 'double' trapezoid configurations are studied to assess their effect on track dynamics. Ballasted and slab tracks are studied, and it is found the improvement is more pronounced for ballasted tracks due to their lower bending stiffness compared to slab tracks. In addition, higher train speeds are found to result in significantly greater stress increases in ballasted tracks. The third analysis focuses on predicting track transition zone settlement by comparing earthwork solutions and auxiliary rails. A double trapezoid earthwork configuration with two materials of UGM and CBM proves most efficient in reducing settlement and minimising the development of mini transition zones, remaining superior to normal track behaviour for years after construction."]},{"key":"dc:format","label":"Dc Format","values":["text"]},{"key":"dcterms:accessrights","label":"Dcterms Accessrights","values":["public"]},{"key":"dc:title","label":"Title","values":["Numerical modelling of railway track transition zone dynamic"]}]}],"canonical_facts":{"dc:contributor.advisor":["Connolly, David","Woodward, Peter"],"dc:creator":["Chumyen, Panudech"],"dc:date":["2024-04"],"dc:date.issued":["2024-04"],"dc:description.abstract":["Railway track transitions are zones where there is an abrupt change in the track-ground structure which include changes between ballasted and slab track, bridge approaches, and tunnel entry/exits. They are often the location of rapid track deterioration, which means more frequent track maintenance is needed compared to plain line tracks. To mitigate these effects, this research aims to investigate the ability of auxiliary rails and earthwork solutions to enhance the dynamic track behaviour of transition zones, in both the short-term and long-term. To do this, a 3D finite element track model is developed using eight-node solid elements and a perfectly matched layer absorbing boundary condition. A dynamic moving train load is simulated using a rigid multi-body approach capable of accounting for train-track interaction. Three track analyses are proposed to address this aim and provide new insight into engineering track transition design. The first analysis focuses on enhancing the dynamic characteristics of ballasted tracks at transitions using auxiliary rails. It is found that using two auxiliary rails widely spaced and placed close to the running rails is useful. The potential generation of additional mini-transition zones and practical construction constraints with this approach are highlighted. The second analysis compares various earthwork solutions for embankment-bridge transition, emphasising the importance of the initial three meters from the transition zone entry. ‘Single’ and 'double' trapezoid configurations are studied to assess their effect on track dynamics. Ballasted and slab tracks are studied, and it is found the improvement is more pronounced for ballasted tracks due to their lower bending stiffness compared to slab tracks. In addition, higher train speeds are found to result in significantly greater stress increases in ballasted tracks. The third analysis focuses on predicting track transition zone settlement by comparing earthwork solutions and auxiliary rails. A double trapezoid earthwork configuration with two materials of UGM and CBM proves most efficient in reducing settlement and minimising the development of mini transition zones, remaining superior to normal track behaviour for years after construction."],"dc:format":["text"],"dc:identifier.uri":["https://etheses.whiterose.ac.uk/id/eprint/34871/1/Chumyen_Panudech_Civil_PhD_2024.pdf"],"dc:language.dcterms_iso639_2":["eng"],"dc:publisher.department":["School of Civil Engineering (Leeds)"],"dc:publisher.institution":["University of Leeds"],"dc:relation.isreferencedby":["https://etheses.whiterose.ac.uk/id/eprint/34871/"],"dc:relation.references":["[1] G. Kouroussis, D. P. Connolly, K. Vogiatzis, and O. Verlinden, “Modelling the environmental effects of railway vibrations from different types of rolling stock: A numerical study,” Shock and Vibration, 2015. [2] A. Ramos, A. G. Correia, R. Calçada, and D. P. Connolly, “Ballastless railway track transition zones: An embankment to tunnel analysis,” Transportation Geotechnics, 2022. [3] J. E. Nicks, “The bump at the end of the railway bridge,” Texas A&M University, Texas, United States, 2009. [4] Fara A., “Transition zones for railway bridges: A study of the Sikån bridge,” Luleå University of Technology, Sweden, 2014. [5] R. D. Fröhling, H. Scheffel, and W. Ebersöhn, “The vertical dynamic response of a rail vehicle caused by track stiffness variations along the track,” Vehicle System Dynamics, vol. 25, pp. 175–187, 1996, doi: 10.1080/00423119608969194. [6] A. Paixão, J. N. Varandas, and E. Fortunato, “Dynamic behaviour in transition zones and long-term railway track performance,” Front Built Environ, vol. 7, Mar. 2021, doi: 10.3389/fbuil.2021.658909. [7] E. T. Selig and J. M. Waters, Track geotechnology and substructure management. London: Thomas Telford, 1994. [8] C. Esveld, Modern Railway Track, Second. Delft, the Netherlands, 2001. [9] S. Iwnicki, Handbook of railway vehicle dynamics. CRC press, 2006. [10] M. Georgios, “Slab Track Systems for High-Speed Railways,” School of Architecture and the Built Environment, Stockholm, Sweden, 2012. [11] Lichtberger B, Track compendium, 1st ed. Eurail Press, 2005. [12] B. Indraratna, M. Babar, T. Ngo, A. Gomes, and R. Kelly, “Improved performance of ballasted tracks at transition zones: A review of experimental and modelling approaches,” Transportation Geotechnics, vol. 21, 2019, doi: 10.1016/j.trgeo.2019.100260. [13] R. Sañudo, L. Dell’Olio, J. A. Casado, I. A. Carrascal, and S. Diego, “Track transitions in railways: A review,” Constr Build Mater, vol. 112, pp. 140–157, 2016, doi: 10.1016/j.conbuildmat.2016.02.084. [14] C. Gallage, B. Dareeju, and M. Dhanasekar, “State-of-the-art : Track degradation at bridge transitions,” in Proceedings of the 4th International Conference on Structural Engineering and Construction Management, 2013. [15] D. Li and D. Davis, “Transition of railroad bridge approaches,” Geotechnical and Geoenvironmental Engineering, vol. 131, no. 11, pp. 1392–1398, 2005, doi: 10.1061/(asce)1090-0241(2005)131:11(1392). [16] X. Lei and L. Mao, “Dynamic response analyses of vehicle and track coupled system on track transition of conventional high-speed railway,” J Sound Vib, vol. 271, pp. 1133–1146, 2004, doi: 10.1016/S0022-460X(03)00570-4. [17] W. P. Banimahd M, “3-dimensional finite element modelling of railway transitions,” in The 9th international conference on railway engineering, 2007. [18] A. Paixão, E. Fortunato, and R. Calçada, “Design and construction of backfills for railway track transition zones,” Proc Inst Mech Eng F J Rail Rapid Transit, vol. 229, no. 1, pp. 58–70, 2015, doi: 10.1177/0954409713499016. [19] H. Heydari-Noghabi, J. N. Varandas, M. Esmaeili, and J. A. Zakeri, “Investigating the influence of auxiliary rails on dynamic behaviour of railway transition zone by a 3D train-track interaction model,” Latin American Journal of Solids and Structures, vol. 14, pp. 2000–2018, 2017, doi: 10.1590/1679-78253906. [20] P. Hölscher and P. Meijers, “Literature study of knowledge and experience of transition zones,” Delft, the Netherlands, 2007. [Online]. Available: report number 415990-0011 of GeoDelft [21] J. N. Varandas, P. Hölscher, and M. A. G. Silva, “Dynamic behaviour of railway tracks on transitions zones,” Comput Struct, vol. 89, no. 13–14, pp. 1468–1479, 2011, doi: 10.1016/j.compstruc.2011.02.013. [22] D. Sasaoka and D. Davis, “Implementing track transition solutions for heavy axle load service,” in AREMA Annual Conference, Chicago,IL, 2005. [23] C. Chen and G. R. McDowell, “An investigation of the dynamic behaviour of track transition zones using discrete element modelling,” Proc Inst Mech Eng F J Rail Rapid Transit, vol. 230, no. 1, pp. 117–128, Jan. 2016, doi: 10.1177/0954409714528892. [24] C. Jayasuriya, B. Indraratna, and T. Ngoc Ngo, “Experimental study to examine the role of under sleeper pads for improved performance of ballast under cyclic loading,” Transportation Geotechnics, vol. 19, pp. 61–73, Jun. 2019, doi: 10.1016/j.trgeo.2019.01.005. [25] S. Nimbalkar and B. Indraratna, “Improved performance of ballasted rail track using geosynthetics and rubber shockmat,” Procedia Eng, vol. 142, pp. 207–214, 2016. [26] Berggren E., “Railway track stiffness: dynamic measurements and evaluation for efficient maintenance,” Royal Institute of Technology (KTH), Stockholm, 2009. [27] D. Mishra, Y. Qian, H. Huang, and E. Tutumluer, “An integrated approach to dynamic analysis of railroad track transitions behaviour,” Transportation Geotechnics, vol. 1, no. 4, pp. 188–200, Dec. 2014, doi: 10.1016/j.trgeo.2014.07.001. [28] Y. Shan, Y. Shu, and S. Zhou, “Finite-infinite element coupled analysis on the influence of material parameters on the dynamic properties of transition zones,” Constr Build Mater, vol. 148, pp. 548–558, 2017, doi: 10.1016/j.conbuildmat.2017.05.071. [29] M. Esmaeili, M. Kamali, and H. Heydari-noghabi, “Numerical investigation of railway transition zones stiffened with auxiliary rails,” in Proceedings of the Institution of Civil Engineers - Transport, 2017. [30] A. Namura and T. Suzuki, “Evaluation of Countermeasures against Differential Settlement at Track Transitions,” 2007. [31] M. Shahraki, C. Warnakulasooriya, and K. J. Witt, “Numerical study of transition zone between ballasted and ballastless railway track,” Transportation Geotechnics, vol. 3, pp. 58–67, 2015, doi: 10.1016/j.trgeo.2015.05.001. [32] R. Sañudo et al., “Monitoring track transition zones in railways,” Sensors, vol. 22, no. 1, Jan. 2022, doi: 10.3390/s22010076. [33] W. Qiang, G. Jing, D. P. Connolly, and P. Aela, “The use of recycled rubber in ballasted railway tracks: A review,” Journal of Cleaner Production, vol. 420. Elsevier Ltd, Sep. 25, 2023. doi: 10.1016/j.jclepro.2023.138339. [34] M. Sol-Sánchez, F. Moreno-Navarro, and M. C. Rubio-Gámez, “The use of elastic elements in railway tracks: A state of the art review,” Construction and Building Materials, vol. 75. Elsevier Ltd, pp. 293–305, Jan. 30, 2015. doi: 10.1016/j.conbuildmat.2014.11.027. [35] M. Sol-Sánchez, F. Moreno-Navarro, and M. C. Rubio-Gámez, “Viability analysis of deconstructed tires as material for rail pads in high-speed railways,” Mater Des, vol. 64, pp. 407–414, Dec. 2014, doi: 10.1016/j.matdes.2014.07.071. [36] D. Read and D. Li, “Design of track transitions,” TCRP Research Results Digest, 2006. [37] H. Wang and V. L. Markine, “Methodology for the comprehensive analysis of railway transition zones,” Comput Geotech, vol. 99, pp. 64–79, 2018, doi: 10.1016/j.compgeo.2018.03.001. [38] V. Sarik, “Decision-making model for track system of high-speed rail lines,” 2018. [39] Greenrail company, “Railway sleeper product.” Accessed: Sep. 16, 2023. [Online]. Available: https://www.greenrailgroup.com/en/home/ [40] P. J. Gräbe, B. F. Mtshotana, M. M. Sebati, and E. Q. Thünemann, “The effects of under-sleeper pads on sleeper-ballast interaction,” Journal of the South African Institution of Civil Engineering, vol. 58, no. 2, pp. 35–41, Jun. 2016, doi: 10.17159/2309-8775/2016/v58n2a4. [41] W. Qiang, G. Jing, D. P. Connolly, and P. Aela, “The use of recycled rubber in ballasted railway tracks: A review,” Journal of Cleaner Production, vol. 420. Elsevier Ltd, Sep. 25, 2023. doi: 10.1016/j.jclepro.2023.138339. [42] T. Abadi, L. Le Pen, A. Zervos, and W. Powrie, “Effect of Sleeper Interventions on Railway Track Performance,” Journal of Geotechnical and Geoenvironmental Engineering, vol. 145, no. 4, Apr. 2019, doi: 10.1061/(asce)gt.1943-5606.0002022. [43] S. K. Navaratnarajah, B. Indraratna, and N. T. Ngo, “Influence of under sleeper pads on ballast behaviour under cyclic loading: Experimental and Numerical Studies,” Journal of Geotechnical and Geoenvironmental Engineering, vol. 144, no. 9, Sep. 2018, doi: 10.1061/(asce)gt.1943-5606.0001954. [44] R. Insa, P. Salvador, J. Inarejos, and L. Medina, “Analysis of the performance of under-sleeper pads in high-speed line transition zones,” Proceedings of the Institution of Civil Engineers - Transport, vol. 167, no. 2, pp. 63–77, 2014, doi: 10.1680/tran.11.00033. [45] C. Ribeiro, A. Paixao, E. Fortunato, and R. Calcada, “Under sleeper pads in transition zones at railway underpasses : Numerical modelling and experimental validation,” Structure and Infrastructure Engineering, 2015, doi: 10.1080/15732479.2014.970203. [46] M. Ahac, S. Lakusic, and I. Haladin, “Experimental investigation of railway track with under sleeper pad,” in 10th Slovenian Road and Transportation Congress, 2010. [Online]. Available: https://www.researchgate.net/publication/272815724 [47] J. Kennedy, P. K. Woodward, G. Medero, and M. Banimahd, “Reducing railway track settlement using three-dimensional polyurethane polymer reinforcement of the ballast,” Constr Build Mater, vol. 44, pp. 615–625, 2013, doi: 10.1016/j.conbuildmat.2013.03.002. [48] D. Gundavaram and S. K. K. Hussaini, “Polyurethane-based stabilisation of railroad ballast – a critical review,” International Journal of Rail Transportation, vol. 7, no. 3. Taylor and Francis Ltd., pp. 219–240, Jul. 03, 2019. doi: 10.1080/23248378.2019.1570477. [49] M. S. Dersch, E. Tutumluer, C. T. Peeler, and D. K. Bower, “Polyurethane coating of railroad ballast aggregate for improved performance,” in the 2010 Joint Rail Conference, 2010. [Online]. Available: https://proceedings.asmedigitalcollection.asme.org [50] P. K. Woodward, J. Kennedy, G. M. Medero, and M. Banimahd, “Application of in situ polyurethane geocomposite beams to improve the passive shoulder resistance of railway track,” Proc Inst Mech Eng F J Rail Rapid Transit, vol. 226, no. 3, pp. 294–304, May 2012, doi: 10.1177/0954409711423460. [51] Stanislav L et al., “Guidelines on the use of novel construction and maintenance techniques within the operational railway environment,” 2018. [52] G. Jing, L. Qie, V. Markine, and W. Jia, “Polyurethane reinforced ballasted track: Review, innovation and challenge,” Construction and Building Materials, vol. 208. Elsevier Ltd, pp. 734–748, May 30, 2019. doi: 10.1016/j.conbuildmat.2019.03.031. [53] B. Zuada Coelho, J. Priest, and P. Hölscher, “Dynamic behaviour of transition zones in soft soils during regular train traffic,” Proc Inst Mech Eng F J Rail Rapid Transit, vol. 232, no. 3, pp. 645–662, Mar. 2018, doi: 10.1177/0954409716683078. [54] B. Coelho, P. Hölscher, J. Priest, W. Powrie, and F. Barends, “An assessment of transition zone performance,” in Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit, Mar. 2011, pp. 129–139. doi: 10.1177/09544097JRRT389. [55] C. Chen, “Discrete element modelling of geogrid-reinforced railway ballast and track transition zones .,” University of Nottingham, 2013. [56] B. Indraratna, Y. Qi, T. N. Ngo, and C. Rujikiatkamjorn, “Use of geogrids and recycled rubber in railroad infrastructure for enhanced performance,” Geosciences (Basel), 2019, doi: 10.3390/geosciences9010030. [57] A. Lanca, Z. Dimitrovová, M. Barroso, and S. Fontul, “Numerical analysis of geogrid contribution to railway track reinforcement,” in MATEC Web of Conferences, 2018, pp. 1–6. [58] D. P. Connolly and H. S. Yu, “A shakedown limit calculation method for geogrid reinforced soils under moving loads,” Geotextiles and Geomembranes, vol. 49, pp. 688–696, 2021, doi: 10.1016/j.geotexmem.2020.11.009. [59] A. Arulrajah, M. W. Bo, A. Abdullah, and M. Leong, “Geosynthetic applications in high-speed railways: A case study,” in Proceedings of the Institution of Civil Engineers Ground Improvement, 2015. [60] Z. Yu, P. K. Woodward, O. Laghrouche, and D. P. Connolly, “True triaxial testing of geogrid for high speed railways,” Transportation Geotechnics, vol. 20, 2019, doi: 10.1016/j.trgeo.2019.100247. [61] Ocean Global Company, “Application of Ocean Geogrids in Railways.” Accessed: Sep. 19, 2023. [Online]. Available: https://oceangeosynthetics.com/application-of-ocean-geogrids-in-railways/ [62] Z. Yu, D. P. Connolly, P. K. Woodward, and O. Laghrouche, “Settlement behaviour of hybrid asphalt-ballast railway tracks,” Constr Build Mater, vol. 208, pp. 808–817, 2019, doi: 10.1016/j.conbuildmat.2019.03.047. [63] S. T. Wilk, T. D. Stark, and J. G. Rose, “Evaluating tie support at railway bridge transitions,” Proc Inst Mech Eng F J Rail Rapid Transit, vol. 230, no. 4, pp. 1336–1350, May 2016, doi: 10.1177/0954409715596192. [64] M. Labrado Palomo, F. Roca Barceló, F. Ribes Llario, and J. Real Herráiz, “Effect of vehicle speed on the dynamics of track transitions,” Journal of Vibration and Control, vol. 24, no. 21, pp. 5118–5128, Nov. 2018, doi: 10.1177/1077546317745254. [65] T. D. Stark and S. T. Wilk, “Root cause of differential movement at bridge transition zones,” Proc Inst Mech Eng F J Rail Rapid Transit, 2015, doi: 10.1177/0954409715589620. [66] D. M. Setiawan, “Worldwide hot mix asphalt layer application and scrap rubber and bitumen emulsion studies on railway track-bed,” Semesta Teknika, 2018, doi: 10.18196/st.212223. [67] J. G. Rose, “Asphalt Underlayment Railway Trackbeds : Designs , Applications , and Long-Term Performance Evaluations,” 2017. [68] I. Gallego Giner and A. López Pita, “Numerical simulation of embankment-structure transition design,” Proc Inst Mech Eng F J Rail Rapid Transit, vol. 223, no. 4, pp. 331–343, Jul. 2009, doi: 10.1243/09544097JRRT234. [69] Y. Shan, B. Albers, and S. A. Savidis, “Influence of different transition zones on the dynamic response of track – subgrade systems,” Comput Geotech, vol. 48, pp. 21–28, 2013, doi: 10.1016/j.compgeo.2012.09.006. [70] D. P. Connolly, A. Giannopoulos, and M. C. Forde, “Numerical modelling of ground borne vibrations from high-speed rail lines on embankments,” Soil Dynamics and Earthquake Engineering, vol. 46, 2013, doi: 10.1016/j.soildyn.2012.12.003. [71] E. Fortunato, A. Paixão, and R. Calçada, “Railway track transition zones: Design, Construction, Monitoring and Numerical modelling,” International Journal of Railway Technology, vol. 2, no. 4, pp. 33–58, 2013, doi: 10.4203/ijrt.2.4.3. [72] G. Lazorenko, A. Kasprzhitskii, Z. Khakiev, and V. Yavna, “Dynamic behaviour and stability of soil foundation in heavy haul railway tracks: A review,” Constr Build Mater, vol. 205, pp. 111–136, 2019, doi: 10.1016/j.conbuildmat.2019.01.184. [73] I. Gue, S. Sew, I. Tan, and Y. Chin, “Geotechnical solutions for high -speed track embankment-A brief overview,” in The Technical Seminar Talk–PWI Annual Convention, 2001. [74] W. Li and X. Bian, “Dynamic performance of pile-supported bridge- embankment transition zones under high-speed train moving loads,” Procedia Eng, vol. 143, pp. 1059–1067, 2016, doi: 10.1016/j.proeng.2016.06.101. [75] Network Rail, “Track work instruction : How to regulate ballast by hand,” 2004. [76] Network Rail, “Track work information sheet : How to carry out measured shovel packing (MSP),” 2007. [77] E. Tutumluer, T. D. Stark, D. Mishra, and J. P. Hyslip, “Investigation and mitigation of differential movement at railway transitions for US high speed passenger rail and joint passenger/freight corridors,” in Proceeding of the Joint Rail Conference: American Society of Mechanical Engineers, 2012, pp. 75–84. [78] H. Boler, D. Mishra, E. Tutumluer, S. Chrismer, and J. P. Hyslip, “Stone blowing as a remedial measure to mitigate differential movement problems at railroad bridge approaches,” Proc Inst Mech Eng F J Rail Rapid Transit, vol. 233, no. 1, pp. 63–72, Jan. 2019, doi: 10.1177/0954409718778654. [79] H. Wang and V. Markine, “Corrective countermeasure for track transition zones in railways : Adjustable fastener,” Eng Struct, vol. 169, pp. 1–14, 2018, doi: 10.1016/j.engstruct.2018.05.004. [80] Office of Rail and Road, “Management of Track Geometry by On-Track Machines : Targeted Assurance Review,” 2021. [81] W. Jia, V. Markine, M. Carvalho, D. P. Connolly, and Y. Guo, “Design of a concept wedge-shaped self-levelling railway sleeper,” Constr Build Mater, vol. 386, Jul. 2023, doi: 10.1016/j.conbuildmat.2023.131524. [82] K. Muramoto, T. Nakamura, and T. Sakurai, “A Hanging sleepers preventing method using Automatic Irregularity-Correcting Short (AICS) sleeper,” in The 11st World Congress on Railway Research (WCRR), 2016. [83] J. Xu, L. J. Butler, and M. Z. E. B. Elshafie, “Experimental and numerical investigation of the performance of self-sensing concrete sleepers,” Struct Health Monit, vol. 19, no. 1, pp. 66–85, Jan. 2020, doi: 10.1177/1475921719834506. [84] G. R. Lui and S. S. Quek, The finite element method : A practical course. Elsevier Ltd, 2003. [85] U. Basu, “Explicit finite element perfectly matched layer for transient three-dimensional elastic waves,” Int J Numer Methods Eng, pp. 151–176, 2009. [86] W. Zhai, Z. Han, Z. Chen, L. Ling, and S. Zhu, “Train-track-bridge dynamic interaction : a state-of- the-art review,” Vehicle System Dynamics, pp. 984–1027, 2019, doi: 10.1080/00423114.2019.1605085. [87] M. Banimahd, J. Kennedy, P. K. Woodward, and G. M. Medero, “Behaviour of train – track interaction in stiffness transitions,” in Proceedings of the Institution of Civil Engineers - Transport, 2012, pp. 205–214. [88] D. Stefens, “Identification and development of a model of railway track,” 2005. [89] G. Liu, The Finite Element Method: A Practical Course. Elsevier Science Ltd, 2003. [90] L. Noels, L. Stainier, and J. P. Ponthot, “Combined implicit/explicit time-integration algorithms for the numerical simulation of sheet metal forming,” J Comput Appl Math, vol. 168, no. 1–2, pp. 331–339, Jul. 2004, doi: 10.1016/j.cam.2003.12.004. [91] G. Kouroussis, D. P. Connolly, G. Alexandrou, and K. Vogiatzis, “Railway ground vibrations induced by wheel and rail singular defects,” Vehicle System Dynamics, vol. 53, 2015, doi: 10.1080/00423114.2015.1062116. [92] D. P. Connolly, G. Kouroussis, O. Laghrouche, C. L. Ho, and M. C. Forde, “Benchmarking railway vibrations – Track , vehicle , ground and building effects,” Constr Build Mater, vol. 92, pp. 64–81, 2015, doi: 10.1016/j.conbuildmat.2014.07.042. [93] L. Xu and T. Lu, “Influence of track flexibility and spatial coherence of track irregularity on vehicle-slab track interaction: frequency-domain analysis,” International Journal of Rail Transportation, vol. 9, no. 4, pp. 342–367, 2021, doi: 10.1080/23248378.2020.1811170. [94] S. G. Koroma, D. J. Thompson, M. F. M. Hussein, and E. Ntotsios, “A mixed space-time and wavenumber-frequency domain procedure for modelling ground vibration from surface railway tracks,” J Sound Vib, vol. 400, pp. 508–532, 2017, doi: 10.1016/j.jsv.2017.04.015. [95] E. Zea, L. Manzari, G. Squicciarini, L. Feng, D. Thompson, and I. L. Arteaga, “Wavenumber–domain separation of rail contribution to pass-by noise,” J Sound Vib, vol. 409, pp. 24–42, Nov. 2017, doi: 10.1016/j.jsv.2017.07.040. [96] A. C. Lamprea-Pineda, D. P. Connolly, and M. F. M. Hussein, “Beams on elastic foundations – A review of railway applications and solutions,” Transportation Geotechnics, vol. 33, 2022, doi: 10.1016/j.trgeo.2021.100696. [97] E. Aggestam and J. C. O. Nielsen, “Multi-objective optimisation of transition zones between slab track and ballasted track using a genetic algorithm,” J Sound Vib, vol. 446, pp. 91–112, 2019, doi: 10.1016/j.jsv.2019.01.027. [98] R. Sañudo, M. Cerrada, B. Alonso, and L. dell’Olio, “Analysis of the influence of support positions in transition zones: A numerical analysis,” Constr Build Mater, vol. 145, pp. 207–217, 2017, doi: 10.1016/j.conbuildmat.2017.03.204. [99] X. Lei and L. Mao, “Dynamic response analyses of vehicle and track coupled system on track transition of conventional high- speed railway,” J Sound Vib, vol. 271, no. 3–5, pp. 1133–1146, Apr. 2004, doi: 10.1016/S0022-460X(03)00570-4. [100] A. Paixão, E. Fortunato, and R. Calçada, “Transition zones to railway bridges: Track measurements and numerical modelling,” Eng Struct, vol. 80, pp. 435–443, 2014, doi: 10.1016/j.engstruct.2014.09.024. [101] P. Punetha, K. Maharjan, and S. Nimbalkar, “Finite element modelling of the dynamic response of critical zones in a ballasted railway track,” Front Built Environ, vol. 7, pp. 1–11, 2021, doi: 10.3389/fbuil.2021.660292. [102] M. Wu, Z. Ba, and J. Liang, “A procedure for 3D simulation of seismic wave propagation considering source-path-site effects: Theory, Verification and Application,” Earthquake Engineering Structural Dynamics, vol. 51, no. 12, pp. 2925–2955, 2022. [103] P. Galvín, A. Romero, and J. Dominguez, “Fully three-dimensional analysis of high-speed train – track – soil-structure dynamic interaction,” J Sound Vib, vol. 329, pp. 5147–5163, 2010, doi: 10.1016/j.jsv.2010.06.016. [104] D. P. Connolly, K. Dong, P. A. Costa, P. Soares, and P. K. Woodward, “High-speed railway ground dynamics: a multi-model analysis,” International Journal of Rail Transportation, vol. 8, pp. 324–346, 2020. [105] C. Ngamkhanong, Q. Yan, T. Li, and S. Kaewunruen, “Dynamic train-track interactions over railway track stiffness transition zones using baseplate fastening systems,” Eng Fail Anal, vol. 118, 2020, doi: 10.1016/j.engfailanal.2020.104866. [106] E. Koch and P. Hudacsek, “3D dynamic modelling of transition zones,” Zenodo, vol. 11, no. 9, pp. 1310–1316, 2017. [107] A. Paixão, J. Nuno, E. Fortunato, and R. Calçada, “Numerical simulations to improve the use of under sleeper pads at transition zones to railway bridges,” Eng Struct, vol. 164, pp. 169–182, 2018, doi: 10.1016/j.engstruct.2018.03.005. [108] J. N. Varandas, P. Hölscher, and M. A. G. Silva, “Three-dimensional track-ballast interaction model for the study of a culvert transition,” Soil Dynamics and Earthquake Engineering, vol. 89, pp. 116–127, Oct. 2016, doi: 10.1016/j.soildyn.2016.07.013. [109] Y. Çati, S. Gökçeli, Ö. Anil, and C. S. Korkmaz, “Experimental and numerical investigation of usp for optimization of transition zone of railway,” Eng Struct, vol. 209, 2020, doi: 10.1016/j.engstruct.2019.109971. [110] T. Xin, Y. Ding, P. Wang, and L. Gao, “Application of rubber mats in transition zone between two different slab tracks in high-speed railway q N T Nd v,” Constr Build Mater, vol. 243, 2020, doi: 10.1016/j.conbuildmat.2020.118219. [111] X. Jia, X. Liu, and G. Li, “A non-reflective boundary model applied to finite element analysis of railway track structure,” in Proceedings of the Asia-Pacific Conference on Intelligent Medical 2018 & International Conference on Transportation and Traffic Engineering 2018, 2018, pp. 15–19. [112] J. Barbosa, J. Park, and E. Kausel, “Perfectly matched layers in the thin layer method,” Comput Methods Appl Mech Eng, vol. 217–220, pp. 262–274, 2012, doi: 10.1016/j.cma.2011.12.006. [113] D. P. Connolly, A. Giannopoulos, and M. C. Forde, “A higher order perfectly matched layer formulation for finite-difference time-domain seismic wave modelling,” Geophysics, 2015. [114] P. Hu, C. Zhang, S. Jian, Y. Wang, W. Wang, and W. Hui, “Dynamic responses of bridge-embankment transitions in high-speed railway: Field tests and data analyses,” Eng Struct, vol. 175, pp. 565–576, 2018, doi: 10.1016/j.engstruct.2018.08.079. [115] C. Charoenwong, D. P. Connolly, P. K. Woodward, P. Galvín, and P. A. Costa, “Analytical forecasting of long-term railway track settlement,” Comput Geotech, vol. 143, 2022, doi: 10.1016/j.compgeo.2021.104601. [116] C. Charoenwong et al., “Railway slab vs ballasted track: A comparison of track geometry degradation,” Constr Build Mater, vol. 378, May 2023, doi: 10.1016/j.conbuildmat.2023.131121. [117] C. Charoenwong, D. P. Connolly, K. Odolinski, P. Alves Costa, P. Galvín, and A. Smith, “The effect of rolling stock characteristics on differential railway track settlement: An engineering-economic model,” Transportation Geotechnics, vol. 37, Nov. 2022, doi: 10.1016/j.trgeo.2022.100845. [118] X. Bian, W. Li, Y. Qian, A. M. Asce, E. Tutumluer, and M. Asce, “Micromechanical Particle Interactions in Railway Ballast through DEM Simulations of Direct Shear Tests,” American Society of Civil Engineers, 2019, doi: 10.1061/(ASCE)GM.1943. [119] X. Zhang, C. Zhao, and W. Zhai, “Dynamic behaviour analysis of high-speed railway ballast under moving vehicle loads using discrete element method,” International Journal of Geomechanics, vol. 17, no. 7, Jul. 2017, doi: 10.1061/(asce)gm.1943-5622.0000871. [120] C. Shi, C. Zhao, X. Zhang, and A. Andersson, “Analysis on dynamic performance of different track transition forms using the discrete element / finite difference hybrid method,” Comput Struct, vol. 230, 2020, doi: 10.1016/j.compstruc.2019.106187. [121] T. T. Nguyen and B. Indraratna, “A coupled CFD–DEM approach to examine the hydraulic critical state of soil under increasing hydraulic gradient,” International Journal of Geomechanics, vol. 20, no. 9, pp. 1–15, 2020, doi: 10.1061/(asce)gm.1943-5622.0001782. [122] Railway Technical Research Institute, “Design standards for Railway Structures and Commentary (Earth Structures),” Tokyo, Japan, 2007. [123] F. Tatsuoka, M. Tateyama, H. Aoki, and K. Watanabe, “Bridge abutment made of cement-mixed gravel backfill,” Ground Improvement Case Histories: Chemical, Electrokinetic, Thermal and Bioengineering Methods, pp. 351–399, 2015. [124] National Railway Administration of P.R. China, “TB 1062-2014: Code for design of high-speed railway,” Beijing, China, 2014. [125] National Railway Administration of P.R. China, “TB 10001-2005: Design standards for railway embankments,” Beijing, China, 2005. [126] International union of railways, “UIC 719R: Earthworks and track bed for railway lines,” 2008. [127] K. Liu, Q. Su, P. Ni, C. Zhou, W. Zhao, and F. Yue, “Evaluation on the dynamic performance of bridge approach backfilled with fibre reinforced lightweight concrete under high-speed train loading,” Comput Geotech, vol. 104, pp. 42–53, 2018, doi: 10.1016/j.compgeo.2018.08.003. [128] Y. Shan, X. Li, and S. Zhou, “Multi-objective optimisation methodology for stiffness combination design of bridge-embankment transition zones in high-speed railways,” Comput Geotech, vol. 155, 2023. [129] D. Li, J. Hyslip, T. Sussmann, and S. Chrismer, Railway Geotechnics. CRC Press Taylor&Francis Group, 2016. [130] A. Furkan Esen, “Experimental and numerical analysis of high-speed railway infrastructure,” Heriot-Watt University, 2022. [131] Konstantinos Tzanakakis, The Railway Track and Its Long Term Behaviour, 1st ed. Berlin: Springer , 2013. [132] F. Lekarp, U. Isacsson, and A. Dawson, “State of the art. I: Resilient response of unbound aggregates,” J Transp Eng, vol. 126, no. 1, pp. 66–75, 2000, doi: 10.1061/(ASCE)0733-947X(2000)126:1(66). [133] B. Indraratna, D. J. Armaghani, A. Gomes Correia, H. Hunt, and T. Ngo, “Prediction of resilient modulus of ballast under cyclic loading using machine learning techniques,” Transportation Geotechnics, vol. 38, Jan. 2023, doi: 10.1016/j.trgeo.2022.100895. [134] B. T. Nguyen and A. Mohajerani, “Resilient modulus of fine-grained soil and a simple testing and calculation method for determining an average resilient modulus value for pavement design,” Transportation Geotechnics, vol. 7, pp. 59–70, Jun. 2016, doi: 10.1016/j.trgeo.2016.05.001. [135] H. Wang and V. Markine, “Modelling of the long-term behaviour of transition zones : Prediction of track settlement,” Eng Struct, vol. 156, pp. 294–304, 2018, doi: 10.1016/j.engstruct.2017.11.038. [136] G. Ognibene et al., “Analysis of a bridge approach: Long-term behaviour from short-term response,” in Railway engineering, 2019. [Online]. Available: https://www.researchgate.net/publication/334544518 [137] K. Nasrollahi, J. C. O. Nielsen, E. Aggestam, J. Dijkstra, and M. Ekh, “Prediction of long-term differential track settlement in a transition zone using an iterative approach,” Eng Struct, vol. 283, May 2023, doi: 10.1016/j.engstruct.2023.115830. [138] J. N. Varandas, P. Hölscher, and M. A. G. Silva, “Settlement of ballasted track under traffic loading: Application to transition zones,” Proc Inst Mech Eng F J Rail Rapid Transit, vol. 228, no. 3, pp. 242–259, Mar. 2014, doi: 10.1177/0954409712471610. [139] Y. Qian, E. Tutumluer, Y. M. A. Hashash, J. Ghaboussi, and D. D. Davis, “Ballast settlement ramp to mitigate differential settlement in a bridge transition zone,” Transp Res Rec, vol. 2476, pp. 45–52, 2015, doi: 10.3141/2476-07. [140] Y. Shan, S. Zhou, B. Wang, and C. L. Ho, “Differential settlement prediction of ballasted tracks in bridge–embankment transition zones,” Journal of Geotechnical and Geoenvironmental Engineering, vol. 146, no. 9, Sep. 2020, doi: 10.1061/(asce)gt.1943-5606.0002307. [141] I. Grossoni, S. Hawksbee, P. Jorge, Y. Bezin, and H. Magalhaes, “Prediction of track settlement at high-speed railway transitions between embankment and bridge in the proximity of a turnout,” Transportation Geotechnics, vol. 37, Nov. 2022, doi: 10.1016/j.trgeo.2022.100879. [142] ORE, “Question D71: Stresses in the Rails, the Ballast and in the Formation Resulting from Traffic Loads. Stresses in the formation (results of the third phase ; measurements under dynamic conditions),” 1970. [143] T. Abadi, L. Le Pen, A. Zervos, and W. Powrie, “A review and evaluation of ballast settlement models using results from the Southampton Railway Testing Facility (SRTF),” in Procedia Engineering, Elsevier Ltd, 2016, pp. 999–1006. doi: 10.1016/j.proeng.2016.06.089. [144] B. Dingqing Li, A. Member, and E. T. Selig, “Cumulative plastic deformation for fine-grained subgrade soils,” Journal of Geotechnical Engineering, vol. 122, no. 12, pp. 1006–1013, 1996. [145] J. Shih, “Model of vehicle/track/ground interaction in the time domain,” 2017. [146] J. Hallquist, LS-DYNA keyword user’s manual, vol. 1, no. May. CA: Livermore software technology corporation (LSTC), 2007. [147] J. Fish, T. Belytschko, and J. Wiley, A First Course in Finite Elements. 2007. [148] S. Moaveni, Finite Element Analysis, Theory and application with ANSYS, . 1999. [149] L. Fryba, Vibration of solids and structure under moving loads, 3rd ed. London: Thomas Telford, 1999. [150] J. O. Hallquist, LS-DYNA Theory manual, no. March. Livermore, California: Livermore Software Technology Corporation, 2006. [151] E. Arlaud, S. C. D’Aguiar, and E. Balmes, “Receptance of railway tracks at low frequency : Numerical and experimental approaches,” Transportation Geotechnics, vol. 9, pp. 1–16, 2016, doi: 10.1016/j.trgeo.2016.06.003. [152] S. Matias, “Numerical Modelling and Design of Slab tracks - Comparison with Ballasted Tracks,” 2014. [153] C. Cruz and E. Miranda, “A critical review of the Rayleigh damping model,” in Proceedings of the 16th World Conference on Earthquake Engineering, 2018. [154] A. Alipour and F. Zareian, “Study Rayleigh damping in structures; Uncertainties and Treatments,” in Proceedings of the 14th World Conference on Earthquake Engineering, 2008. [155] A. Mosleh, P. A. Costa, and R. Calcada, “A new strategy to estimate static loads for the dynamic weighing in motion of railway vehicles,” in Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit, 2020, pp. 183–200. doi: 10.1177/0954409719838115. [156] M. R. Pajand and M. T. Hakkak, “Nonlinear analysis of truss structures using dynamic relaxation,” International Journal of Engineering, vol. 19, no. 1, 2006. [157] N. Correia, A. Colaço, P. A. Costa, and R. Calçada, “Experimental analysis of track-ground vibrations on a stretch of the Portuguese railway network,” Soil Dynamics and Earthquake Engineering, vol. 90, pp. 358–380, 2016, doi: 10.1016/j.soildyn.2016.09.003. [158] J. F. Ruiz, P. A. Costa, R. Calçada, L. E. Medina, and A. Colaço, “Study of ground vibrations induced by railway traffic in a 3D FEM model formulated in the time domain : Experimental validation,” Structure and Infrastructure Engineering, vol. 13, no. 5, pp. 652–664, 2017, doi: 10.1080/15732479.2016.1172649. [159] P. A. Costa and S. Cardoso, “Experimental validation of a 2.5D FEM-BEM model for the assessment of vibrations induced by Traffic,” in Proceeding of the 3rd Computational Methods in Structural Dynamics and Earhquake Engineering, 2011, pp. 25–28. [160] H. Heydari, J. A. Zakeri, and M. Esmaeili, “Field study using additional rails and an approach slab as a transition zone from slab track to the ballasted track,” in Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit, 2017. doi: 10.1177/0954409717708527. [161] P. Chumyen, D. P. Connolly, P. K. Woodward, and V. Markine, “The effect of soil improvement and auxiliary rails at railway track transition zones,” Soil Dynamics and Earthquake Engineering, vol. 155, 2022, doi: 10.1016/j.soildyn.2022.107200. [162] P. Chumyen, D. P. Connolly, P. K. Woodward, and V. Markine, “A comparison of earthwork designs for railway transition zones,” Constr Build Mater, vol. 395, p. 132295, Sep. 2023, doi: 10.1016/j.conbuildmat.2023.132295. [163] T. D. Akinosho et al., “Deep learning in the construction industry: A review of present status and future innovations,” Journal of Building Engineering, vol. 32, 2020, doi: 10.1016/j.jobe.2020.101827. [164] A. B. Goktepe and A. H. Lav, “Method for Optimizing Earthwork Considering Soil Properties in the Geometric Design of Highways,” Journal of Surveying Engineering, vol. 130, no. 4, pp. 183–190, 2004, doi: 10.1061/(asce)0733-9453(2004)130:4(183). [165] W. L. Hare, V. R. Koch, and Y. Lucet, “Models and algorithms to improve earthwork operations in road design using mixed integer linear programming,” Eur J Oper Res, vol. 215, no. 2, pp. 470–480, 2011, doi: 10.1016/j.ejor.2011.06.011. [166] Y. Villar, M. Menéndez, Z. Fernández, and A. Bernardo, “Sustainable earthworks: Optimization with the ICOM method,” Energy Reports, Nov. 2020, doi: 10.1016/j.egyr.2020.08.060."],"dcterms:accessrights":["public"],"dc:title":["Numerical modelling of railway track transition zone dynamic"],"dc:type":["Thesis"],"dc:type.qualificationlevel":["doctoral"],"dc:type.qualificationname":["Ph.D"]},"updated_at":"2026-11-18T23:26:27Z"}