{"id":{"repo_id":"whiterose","oai_identifier":"oai:etheses.whiterose.ac.uk:34945"},"canonical_url":"https://search.ndltd.org/etd/whiterose/oai:etheses.whiterose.ac.uk:34945","repository":{"repo_id":"whiterose","name":"White Rose University Consortium","base_url":"https://etheses.whiterose.ac.uk/cgi/oai2"},"display":{"title":"A Digital Platform for Handling the Construction Build Process in Highways Infrastructure","abstract":"The construction industry has a long-established reputation for cost and time overruns. This is a particular concern for the UK government when commissioning major infrastructure projects. Therefore, the government is requiring that highways construction companies move to adopt new ways of monitoring projects in the future. Against this background, the thesis investigates the issues that make project management more difficult in highways construction compared with manufacturing, and how the government’s proposals aim to improve the situation. The research resulted in collecting data from experts in the construction industry to find out the current issues of the industry and how digitising the current build process might help to tackle some of these issues. The research then looks at how one of the major UK highways construction companies can implement an asset tracking system that not only satisfies the government’s vision, but goes beyond it to audit, track and manage the actual build process which saves cost and time in the reworking and handover process. The company’s situation along with the government’s proposals are analysed to identify the features required from the proposed system. A prototype system called CATS – Construction Asset Tracking System – was then implemented. The final stage of the research evaluated the strengths and weaknesses of CATS by analysing the data collected from interviewing thirteen managers and engineers in the company. The interviews covered what they saw as the issues in highways construction, followed by a demonstration of CATS if they had not seen it before, and concluded with a discussion of the role they saw for CATS and similar systems.","abstract_html":"The construction industry has a long-established reputation for cost and time overruns. This is a particular concern for the UK government when commissioning major infrastructure projects. Therefore, the government is requiring that highways construction companies move to adopt new ways of monitoring projects in the future. Against this background, the thesis investigates the issues that make project management more difficult in highways construction compared with manufacturing, and how the government’s proposals aim to improve the situation. The research resulted in collecting data from experts in the construction industry to find out the current issues of the industry and how digitising the current build process might help to tackle some of these issues. The research then looks at how one of the major UK highways construction companies can implement an asset tracking system that not only satisfies the government’s vision, but goes beyond it to audit, track and manage the actual build process which saves cost and time in the reworking and handover process. The company’s situation along with the government’s proposals are analysed to identify the features required from the proposed system. A prototype system called CATS – Construction Asset Tracking System – was then implemented. The final stage of the research evaluated the strengths and weaknesses of CATS by analysing the data collected from interviewing thirteen managers and engineers in the company. The interviews covered what they saw as the issues in highways construction, followed by a demonstration of CATS if they had not seen it before, and concluded with a discussion of the role they saw for CATS and similar systems.","abstract_has_math":false,"creators":["Al-Ghraify, Ibrahim"],"institution":"University of Sheffield","degree_name":"Ph.D","degree_level":"doctoral","degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":["Brint, Andrew","Cantarelli, Chantal","Burkinshaw, Lynda"],"committee_chairs":[],"committee_members":[],"year":2024,"date_issued":"2024-05","date_published":"2024-05","updated_at":"2026-11-18T23:26:40Z","subjects":[],"languages":["eng"],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":null,"outbound_label":null,"outbound_source":null,"record_url":null,"record_label":null,"record_kind":null,"record_source":null,"download_url":"https://etheses.whiterose.ac.uk/id/eprint/34945/1/A%20Digital%20Platform%20for%20Handling%20the%20Construction%20Build%20Process%20in%20Highways%20Infrastructure.pdf","download_label":"Download PDF","download_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://etheses.whiterose.ac.uk/cgi/oai2?verb=GetRecord&metadataPrefix=uketd_dc&identifier=oai%3Aetheses.whiterose.ac.uk%3A34945","prefix":"uketd_dc"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Brint, Andrew","Cantarelli, Chantal","Burkinshaw, Lynda"]},{"key":"dc:creator","label":"Author","values":["Al-Ghraify, Ibrahim"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2024-05"]},{"key":"dc:date.issued","label":"Date","values":["2024-05"]},{"key":"dc:publisher.department","label":"Dc Publisher Department","values":["Management School (Sheffield)"]},{"key":"dc:publisher.institution","label":"Dc Publisher Institution","values":["University of Sheffield"]},{"key":"dc:relation.isreferencedby","label":"Dc Relation Isreferencedby","values":["https://etheses.whiterose.ac.uk/id/eprint/34945/"]},{"key":"dc:relation.references","label":"Dc Relation References","values":["Abdullah, S., Tahar, K. N., Rashid, M. F. A., Osoman, M. A., & Abdullah, F. (2021). The Production of Assets Inventory by using a 360-degree Camera Mobile Mapping System in Langkawi, Malaysia. IOP Conference Series: Earth and Environmental Science, 767(1). https://doi.org/10.1088/1755-1315/767/1/012012 Abou-Zeid, A., Russell, J. S., Hanna, A. S., & Park, S. C. (1995). Data flow model for communications between project participants in a highway bridge project. Canadian Journal of Civil Engineering, 22(6), 1224–1234. https://doi.org/10.1139/l95-140 Agency, H. (2015). Highways Agency Business Plan 2015 - 2020. The Guardian. https://www.gov.uk/government/publications/highways-england-strategic-business-plan-2015-to-2020 Ahuja, V., Yang, J., & Shankar, R. (2010). Benchmarking Framework to Measure Extent of ICT Adoption for Building Project Management. Journal of Construction Engineering and Management, 136(5), 538–545. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000155 Alshboul, O., Shehadeh, A., & Hamedat, O. (2023). Development of integrated asset management model for highway facilities based on risk evaluation. International Journal of Construction Management, 23(8), 1355–1364. https://doi.org/10.1080/15623599.2021.1972204 Arditi, D., & Gunaydin, M. (1997). Total quality management in the construction process. International Journal of Project Management, 15(4), 235–244. Aslam, H. M., & Tarmizi, H. A. (2018). Intelligent BIM record model for effective asset management of constructed facility. MATEC Web of Conferences, 195, 6004. Atkinson, R., & Flint, J. (2001). Accessing Hidden and Hard-to-Reach Populations: Snowball Research Strategies. Social Research Update, 33. https://sru.soc.surrey.ac.uk/SRU33.html Aziz, Z., Riaz, Z., & Arslan, M. (2017). Leveraging BIM and Big Data to deliver well maintained highways. Facilities, 35(13–14), 818–832. https://doi.org/10.1108/F-02-2016-0021 BAM. (2015). are-the-government-s-construction-2025-targets-achievable. https://www.bam.co.uk/media-centre/blog/bamblog/2015/03/20/are-the-government-s-construction-2025-targets-achievable Barker, K. (2013). SME reaction to Construction 2025. Construction News. BIM Industry Working Group. (2011). A report for the Government Construction Client Group - March 2011. Communications, March, 107. http://www.bimtaskgroup.org/wp-content/uploads/2012/03/BIS-BIM-strategy-Report.pdf Braun, V., & Clarke, V. (2006). Using thematic analysis in psychology. Qualitative Research in Psychology, 3(2), 77–101. https://doi.org/10.1191/1478088706qp063oa Brown, R. E., & Spare, J. H. (2004). Asset management, risk, and distribution system planning. IEEE PES Power Systems Conference and Exposition, 2004. https://doi.org/10.1109/PSCE.2004.1397445 Bryman. A. (2016). Social research methods 5th edition (6th ed.). Oxford University Press. Bryman, A. (2008). Social research methods (3rd ed.). Oxford University Press. Chileshe, N. (2007). Quality management concepts, principles, tools and philosophies: A valid methodology for deployment within UK construction-related SMEs. Journal of Engineering, Design and Technology, 5(1), 49–67. https://doi.org/10.1108/17260530710746605 Clark, T., Foster, L., Sloan, L., Bryman, A., & Bryman, A. (2021). Bryman’s social research methods. In Social research methods (Sixth edit). Oxford University Press. Costain. (2013). Costain Business model. Cresswell, J., & Miller, D. (2000). Determining Validity in Qualitative Inquiry (pp. 124–130). David Kynaston. (2023). A Northern Wind: Britain 1962-65. Bloomsbury. Dehlin, S., & Olofsson, T. (2008). An evaluation model for ICT investments in construction projects. Electronic Journal of Information Technology in Construction, 13(September 2007), 343–361. Department for Business: Innovation and Skills. (2013). UK Construction: An economic analysis of the sector. UK Construction, 1(7), 43. Deuff, D., & Cosquer, M. (2013). User-Centered Agile Method (1st ed.). John Wiley & Sons, Incorporated; ProQuest Ebook Central,. https://ebookcentral.proquest.com/lib/sheffield/detail.action?docID=1187167 Ding, L., Zhou, Y., & Akinci, B. (2014). Building Information Modeling (BIM) application framework: The process of expanding from 3D to computable nD. Automation in Construction, 46, 82–93. https://doi.org/10.1016/j.autcon.2014.04.009 Dolezilek, D. J., & Ayers, L. M. (2001). Using dynamic real-time substation information to reinvent asset management. Transmission and Distribution Conference and Exposition, 2001 IEEE/PES, 00(C), 901–906. Dziekonski, K., Mascarenhas, F., Mahamadu, A. M., & Manu, P. (2023). Investigation into the Key Barriers to Achieving UK “Construction 2025” Strategy Targets. Engineering Management in Production and Services, 15(4), 116–127. https://doi.org/10.2478/emj-2023-0032 Ehsan, N., Ali, E. S., & Mirza, I. (2011). Formulation of road asset management system of Pakistan. Remote Sensing, Environment and Transportation Engineering (RSETE), 2011 International Conference On, 8281–8284. https://doi.org/10.1109/RSETE.2011.5964083 Institute of Civil Engineering (2020). Procuring Improved Construction Productivity Guidance Note. Institute of Civil Engineering, 210252, 1–10. https://www.ice.org.uk/media/df1iqonn/2022-07-25-pag_procurement_productivity_note_final.pdf Fan, Y., & Yin, Y. (2020). Research on Asset Management in Construction Phase of PPP Project - - Based on Tracking Auditing Perspective. IOP Conference Series: Materials Science and Engineering, 768(5). https://doi.org/10.1088/1757-899X/768/5/052046 Fitzpatrick, T. (2013). Industry reacts to Construction 2025. Construction News. Floros, G. S., & Ellul, C. (2021). LOSS of INFORMATION during DESIGN & CONSTRUCTION for HIGHWAYS ASSET MANAGEMENT: A GEOBIM PERSPECTIVE. ISPRS Annals of the Photogrammetry, Remote Sensing and Spatial Information Sciences, 8(4/W2-2021), 83–90. https://doi.org/10.5194/isprs-annals-VIII-4-W2-2021-83-2021 Fukuda, R. (2018). Cedac: A tool for continuous systematic improvement (1st ed.). Routledge. Rezahoseini, A., Noori, S., Ghannadpour, S. F., & Bodaghi, M. (2019). Reducing rework and increasing the civil projects quality, through Total Quality Management (TQM), by using the concept of building information modeling (BIM). Journal of Industrial and Systems Engineering, 12(1), 0. http://www.jise.ir/article_76543.html Gifford, J. L., & Carlisle, W. H. (2004). Virginia department of transportation’s dashboard performance measurement and reporting system going the full monty. Transportation Research Record, 1895, 207–219. https://doi.org/10.3141/1895-26 Golafshani, N. (2003). Understanding Reliability and Validity in Qualitative Research. The Qualitative Report, 8(4), 597–606. https://doi.org/10.46743/2160-3715/2003.1870 Green, S. (2013). At it again: Critique of UK government’s industrial strategy for construction. Construction Research and Innovation, 4(3), 12–15. https://doi.org/10.1080/20450249.2013.11873892 Gruneberg, S. (2018). A strategic approach to the UK construction industry. Oxon: Routledge. https://www.routledge.com/A-Strategic-Approach-to-the-UK-Construction-Industry/Gruneberg/p/book/9781032178486 Hall, G. T. H. M. (2023). Meeting with Graeme for Project Process. Online Meeting. Hanley, B. P., & Clayton, R. J. (2008). Smarter Asset Management for Renewable Energy. IET Institution of Engineering and Technology, 2020, 1–6. Hardy, E. (2014). Construction 2025: how Considerate Constructors Scheme is helping to build the future of the industry. Construction News. Harisson, F. & Lock, D. (2017). Advanced project management: a structured approach (4th Edition). Routledge. Haupt, T. C., & Whiteman, D. E. (2004). Inhibiting factors of implementing total quality management on construction sites. The TQM Magazine, 16(3), 166–173. https://doi.org/10.1108/09544780410532891 He, Y., Song, Z., & Liu, Z. (2017). Updating highway asset inventory using airborne LiDAR. Measurement: Journal of the International Measurement Confederation, 104, 132–141. https://doi.org/10.1016/j.measurement.2017.03.026 HM Government. (2012). Industrial strategy: government and industry in partnership, Building Information Modeling (BIM). HM, Vol.1(Feb-2009), pp 225-231. https://doi.org/10.1016/j.aei.2007.03.001 HM Government. (2013). 2-Construction 2025. Industrial Strategy: Government and industry in partnership. UK Government, July, 78. https://doi.org/HM Government. HM Government. (2015). Digital Built Britain Level 3 Building Information Modelling - Strategic Plan. UK Government, February, 1–47. HM Government. (2017). Boosting construction productivity could deliver £15 billion savings every year. https://www.gov.uk/government/news/boosting-construction-productivity-could-deliver-15-billion-savings-every-year HMSO. (2011). Government Construction Strategy. Construction, May. http://www.cabinetoffice.gov.uk/sites/default/files/resources/Government-Construction-Strategy_0.pdf %5B [Accessed 23.11.11] Highways Agency. (2014). Asset Data Management Manual, Appendices a-G. In Highways Agency (Vol. 71, Issue 9). Hove, S. E., & Anda, B. (2005). Experiences from conducting semi-structured interviews in empirical software engineering research. Proceedings - International Software Metrics Symposium, 2005(Metrics), 10–23. https://doi.org/10.1109/METRICS.2005.24 Huber, T. L., Winkler, M. A. E., Dibbern, J., & Brown, C. V. (2020). The use of prototypes to bridge knowledge boundaries in agile software development. Information Systems Journal, 30(2), 270–294. https://doi.org/10.1111/isj.12261 Index., C. (2017). Industry targets are not being measured. Jonassen, D., Davidson, M., Collins, M., Campbell, J., & Haag, B. B. (1995). Constructivism and computer‐mediated communication in distance education. American Journal of Distance Education, 9(2), 7–26. https://doi.org/10.1080/08923649509526885 Jung, J. K., Sinha, S. K., & Whittle, L. G. (2014). Development of a Water Infrastructure Knowledge Database. Journal of Infrastructure Systems, 20(1), 04013006. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000163 King, N., & Horrocks, C. (2010). Interviews in qualitative research (C. Horrocks (ed.)). Los Angeles: SAGE, 2010. Kostic, T. (2003). Asset management in electrical utilities: how many facets it actually has. 2003 IEEE Power Engineering Society General Meeting (IEEE Cat. No.03CH37491), 1. https://doi.org/10.1109/PES.2003.1267182 Landers, J. (2008). Water Pipeline Database Will Improve Asset Management. Civil Engineering (08857024), American Society of Civil Engineers. Le, T., & Jeong, H.D. (2016). Interlinking life-cycle data spaces to support decision making in highway asset management. Automation in Construction, 64, 54–64. https://doi.org/10.1016/j.autcon.2015.12.016 Le, T., Le, C., & Jeong, H.D. (2018). Lifecycle Data Modeling to Support Transferring Project-Oriented Data to Asset-Oriented Systems in Transportation Projects. Journal of Management in Engineering, 34(4), 1–13. https://doi.org/10.1061/(asce)me.1943-5479.0000620 Lewis, J. (2009). Redefining Qualitative Methods: Believability in the Fifth Moment. International Journal of Qualitative Methods, 8(2), 1–14. https://doi.org/10.1177/160940690900800201 Li, H. (1996). The role of IT manager in construction process re‐engineering. Building Research & Information, 24(2), 124–127. https://doi.org/10.1080/09613219608727512 Lincoln, Y. S., & Guba, E. G. (1985). Naturalistic inquiry (E. G. Guba (ed.)). Beverly Hills, California. Malterud, K. (2001). Qualitative research (en medicina): standards, challenges, and guidelines.: EBSCOhost. Qualitative Research Series, 358(August, 11), 483–488. http://web.a.ebscohost.com.eza.udesa.edu.ar/ehost/pdfviewer/pdfviewer?vid=4&sid=418f25c8-6388-464a-b616-d3778f3f27e3%40sessionmgr4006 Maxwell, J. A. (1996). Qualitative research design: an interactive approach. London: Sage, 1996. McClure, T., & Yuan, C. (2016). Leveraging Construction Inspection and Documentation for Asset Inventory and Life Cycle Asset Management. Journal of Information Technology in Construction (ITcon), 21(April), 72–85. McHugh, D. (2023). Dave McHugh, Technology and Innovation Manager, Personal Communication. Miller, T., BIRCH, M., MAUTHNER, M. & JESSOP, J. (2012). Ethics in qualitative research. In Sage (1st ed.). Munslow, J. J. (2011). Asset Management? For roads? Developing a holistic asset management approach in a local highway authority service. IET and IAM Asset Management Conference 2011, 42–42. https://doi.org/10.1049/cp.2011.0556 NBS. (2023). NBS. https://www.thenbs.com/knowledge/bim-dimensions-3d-4d-5d-6d-bim-explained Orb, A., Eisenhauer, L., & Wynaden, D. (2001). Ethics in qualitative research. Journal of Nursing Scholarship, 33(1), 93–96. https://doi.org/10.1111/j.1547-5069.2001.00093.x Patel, T., Suthar, V., Bhatt, N., Pathak, K. K., Bandara, J. M. S. J., & Agrawal, R. (2021). Application of Remotely Piloted Unmanned Aerial Vehicle in Construction Management (Vol. 77, pp. 319–329). https://doi.org/10.1007/978-981-15-5195-6_25 Pickard, H, Wilczek, M, Fedyk, K, Davies, S, Imms, E. (2023). Geographic information systems for infrastructure asset management. ciria. https://products.ihserc.com/tmp_stamp/49503501/NVDWWGAAAAAAAAAA.pdf?sess=49503501&prod=CIS1 Poksinska, B., Dahlgaard, J. J., & Antoni, M. (2002). The state of ISO 9000 certification: A study of Swedish organizations. TQM Magazine, 14(5), 297–306. https://doi.org/10.1108/09544780210439734 Rashid Maqbool, Johnny Rezai Namaghi, Yahya Rashid, A. A. (2023). How modern methods of construction would support to meet the sustainable construction 2025 targets, the answer is still unclear. Ain Shams Engineering Journal. https://doi.org/10.1016/j.asej.2022.101943 RICS. (2018). RICS and industry insight paper responds to Construction 2025. Construction Journal, 6. Ridley, D. (2012). The literature review: A step-by-step guide for students (2nd ed.). Los Angeles, California; London : SAGE, 2012. Rowley, J., & Rowley, J. (2014). Conducting research interviews. https://doi.org/10.1108/01409171211210154 Shoshan, A. A. A., & Çelik, G. (2018). Application of TQM in the Construction Industry of Developing Countries - Case of Turkey. ANADOLU UNIVERSITY JOURNAL OF SCIENCE AND TECHNOLOGY A - Applied Sciences and Engineering, 19(1), 177–191. https://doi.org/10.18038/aubtda.345779 Sitzabee, W. E., Rasdorf, W., Hummer, J. E., & Devine, H. A. (2009). Data Integration of Pavement Markings: A Case in Transportation Asset Management. Journal of Computing in Civil Engineering, 23(5), 288–298. https://doi.org/10.1061/(ASCE)0887-3801(2009)23:5(288) Teall, O. (2014). Building information modelling in the highways sector: major projects of the future. Proceedings of the ICE - Management, Procurement and Law, 167(3), 127–133. https://doi.org/10.1680/mpal.13.00018 Tor, O., & Shahidehpour, M. (2006). Power distribution asset management. 2006 IEEE Power Engineering Society General Meeting, 1–7. https://doi.org/10.1109/PES.2006.1709234 Turkan, Y., Guo, F., & Jahren, C. T. (2015). Electronic document management systems for transportation construction industry. Electronic Journal of Information Technology in Construction, 1–8. U.S.A Department of Transportation Federal Highway Administration. (2010). Model Inventory of Roadway Elements. MIRE, Version 1.0. In FHWA (Issue October). Vallance, A., (Mouchel /BIM Developer). (2015). 3D BIM - M1 Smart Motorway. One Team. Young, E. &. (2018). Strategic Outline Business Case for the delivery of Digital Built Britain Programme Level 3. Yuan, C., McClure, T., Cai, H., & Dunston, P. S. (2017). Life-Cycle Approach to Collecting, Managing, and Sharing Transportation Infrastructure Asset Data. Journal of Construction Engineering and Management, 143(6). https://doi.org/10.1061/(asce)co.1943-7862.0001288 Yuan, C., McClure, T., Dunston, P. S., & Cai, H. (2016). Survey on the Practice Hurdles in Collecting, Managing, and Sharing Transportation Infrastructure Asset Data. Construction Research Congress 2016: Old and New Construction Technologies Converge in Historic San Juan - Proceedings of the 2016 Construction Research Congress, CRC 2016. https://doi.org/10.1061/9780784479827.165"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"dc:type.qualificationlevel","label":"Dc Type Qualificationlevel","values":["doctoral"]},{"key":"dc:type.qualificationname","label":"Dc Type Qualificationname","values":["Ph.D"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.dcterms_iso639_2","label":"Language (ISO 639-2)","values":["eng"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://etheses.whiterose.ac.uk/id/eprint/34945/1/A%20Digital%20Platform%20for%20Handling%20the%20Construction%20Build%20Process%20in%20Highways%20Infrastructure.pdf"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The construction industry has a long-established reputation for cost and time overruns. This is a particular concern for the UK government when commissioning major infrastructure projects. Therefore, the government is requiring that highways construction companies move to adopt new ways of monitoring projects in the future. Against this background, the thesis investigates the issues that make project management more difficult in highways construction compared with manufacturing, and how the government’s proposals aim to improve the situation. The research resulted in collecting data from experts in the construction industry to find out the current issues of the industry and how digitising the current build process might help to tackle some of these issues. The research then looks at how one of the major UK highways construction companies can implement an asset tracking system that not only satisfies the government’s vision, but goes beyond it to audit, track and manage the actual build process which saves cost and time in the reworking and handover process. The company’s situation along with the government’s proposals are analysed to identify the features required from the proposed system. A prototype system called CATS – Construction Asset Tracking System – was then implemented. The final stage of the research evaluated the strengths and weaknesses of CATS by analysing the data collected from interviewing thirteen managers and engineers in the company. The interviews covered what they saw as the issues in highways construction, followed by a demonstration of CATS if they had not seen it before, and concluded with a discussion of the role they saw for CATS and similar systems."]},{"key":"dc:format","label":"Dc Format","values":["text"]},{"key":"dcterms:accessrights","label":"Dcterms Accessrights","values":["public"]},{"key":"dc:title","label":"Title","values":["A Digital Platform for Handling the Construction Build Process in Highways Infrastructure"]}]}],"canonical_facts":{"dc:contributor.advisor":["Brint, Andrew","Cantarelli, Chantal","Burkinshaw, Lynda"],"dc:creator":["Al-Ghraify, Ibrahim"],"dc:date":["2024-05"],"dc:date.issued":["2024-05"],"dc:description.abstract":["The construction industry has a long-established reputation for cost and time overruns. This is a particular concern for the UK government when commissioning major infrastructure projects. Therefore, the government is requiring that highways construction companies move to adopt new ways of monitoring projects in the future. Against this background, the thesis investigates the issues that make project management more difficult in highways construction compared with manufacturing, and how the government’s proposals aim to improve the situation. The research resulted in collecting data from experts in the construction industry to find out the current issues of the industry and how digitising the current build process might help to tackle some of these issues. The research then looks at how one of the major UK highways construction companies can implement an asset tracking system that not only satisfies the government’s vision, but goes beyond it to audit, track and manage the actual build process which saves cost and time in the reworking and handover process. The company’s situation along with the government’s proposals are analysed to identify the features required from the proposed system. A prototype system called CATS – Construction Asset Tracking System – was then implemented. The final stage of the research evaluated the strengths and weaknesses of CATS by analysing the data collected from interviewing thirteen managers and engineers in the company. The interviews covered what they saw as the issues in highways construction, followed by a demonstration of CATS if they had not seen it before, and concluded with a discussion of the role they saw for CATS and similar systems."],"dc:format":["text"],"dc:identifier.uri":["https://etheses.whiterose.ac.uk/id/eprint/34945/1/A%20Digital%20Platform%20for%20Handling%20the%20Construction%20Build%20Process%20in%20Highways%20Infrastructure.pdf"],"dc:language.dcterms_iso639_2":["eng"],"dc:publisher.department":["Management School (Sheffield)"],"dc:publisher.institution":["University of Sheffield"],"dc:relation.isreferencedby":["https://etheses.whiterose.ac.uk/id/eprint/34945/"],"dc:relation.references":["Abdullah, S., Tahar, K. N., Rashid, M. F. A., Osoman, M. A., & Abdullah, F. (2021). The Production of Assets Inventory by using a 360-degree Camera Mobile Mapping System in Langkawi, Malaysia. IOP Conference Series: Earth and Environmental Science, 767(1). https://doi.org/10.1088/1755-1315/767/1/012012 Abou-Zeid, A., Russell, J. S., Hanna, A. S., & Park, S. C. (1995). Data flow model for communications between project participants in a highway bridge project. Canadian Journal of Civil Engineering, 22(6), 1224–1234. https://doi.org/10.1139/l95-140 Agency, H. (2015). Highways Agency Business Plan 2015 - 2020. The Guardian. https://www.gov.uk/government/publications/highways-england-strategic-business-plan-2015-to-2020 Ahuja, V., Yang, J., & Shankar, R. (2010). Benchmarking Framework to Measure Extent of ICT Adoption for Building Project Management. Journal of Construction Engineering and Management, 136(5), 538–545. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000155 Alshboul, O., Shehadeh, A., & Hamedat, O. (2023). Development of integrated asset management model for highway facilities based on risk evaluation. International Journal of Construction Management, 23(8), 1355–1364. https://doi.org/10.1080/15623599.2021.1972204 Arditi, D., & Gunaydin, M. (1997). Total quality management in the construction process. International Journal of Project Management, 15(4), 235–244. Aslam, H. M., & Tarmizi, H. A. (2018). Intelligent BIM record model for effective asset management of constructed facility. MATEC Web of Conferences, 195, 6004. Atkinson, R., & Flint, J. (2001). Accessing Hidden and Hard-to-Reach Populations: Snowball Research Strategies. Social Research Update, 33. https://sru.soc.surrey.ac.uk/SRU33.html Aziz, Z., Riaz, Z., & Arslan, M. (2017). Leveraging BIM and Big Data to deliver well maintained highways. Facilities, 35(13–14), 818–832. https://doi.org/10.1108/F-02-2016-0021 BAM. (2015). are-the-government-s-construction-2025-targets-achievable. https://www.bam.co.uk/media-centre/blog/bamblog/2015/03/20/are-the-government-s-construction-2025-targets-achievable Barker, K. (2013). SME reaction to Construction 2025. Construction News. BIM Industry Working Group. (2011). A report for the Government Construction Client Group - March 2011. Communications, March, 107. http://www.bimtaskgroup.org/wp-content/uploads/2012/03/BIS-BIM-strategy-Report.pdf Braun, V., & Clarke, V. (2006). Using thematic analysis in psychology. Qualitative Research in Psychology, 3(2), 77–101. https://doi.org/10.1191/1478088706qp063oa Brown, R. E., & Spare, J. H. (2004). Asset management, risk, and distribution system planning. IEEE PES Power Systems Conference and Exposition, 2004. https://doi.org/10.1109/PSCE.2004.1397445 Bryman. A. (2016). Social research methods 5th edition (6th ed.). Oxford University Press. Bryman, A. (2008). Social research methods (3rd ed.). Oxford University Press. Chileshe, N. (2007). Quality management concepts, principles, tools and philosophies: A valid methodology for deployment within UK construction-related SMEs. Journal of Engineering, Design and Technology, 5(1), 49–67. https://doi.org/10.1108/17260530710746605 Clark, T., Foster, L., Sloan, L., Bryman, A., & Bryman, A. (2021). Bryman’s social research methods. In Social research methods (Sixth edit). Oxford University Press. Costain. (2013). Costain Business model. Cresswell, J., & Miller, D. (2000). Determining Validity in Qualitative Inquiry (pp. 124–130). David Kynaston. (2023). A Northern Wind: Britain 1962-65. Bloomsbury. Dehlin, S., & Olofsson, T. (2008). An evaluation model for ICT investments in construction projects. Electronic Journal of Information Technology in Construction, 13(September 2007), 343–361. Department for Business: Innovation and Skills. (2013). UK Construction: An economic analysis of the sector. UK Construction, 1(7), 43. Deuff, D., & Cosquer, M. (2013). User-Centered Agile Method (1st ed.). John Wiley & Sons, Incorporated; ProQuest Ebook Central,. https://ebookcentral.proquest.com/lib/sheffield/detail.action?docID=1187167 Ding, L., Zhou, Y., & Akinci, B. (2014). Building Information Modeling (BIM) application framework: The process of expanding from 3D to computable nD. Automation in Construction, 46, 82–93. https://doi.org/10.1016/j.autcon.2014.04.009 Dolezilek, D. J., & Ayers, L. M. (2001). Using dynamic real-time substation information to reinvent asset management. Transmission and Distribution Conference and Exposition, 2001 IEEE/PES, 00(C), 901–906. Dziekonski, K., Mascarenhas, F., Mahamadu, A. M., & Manu, P. (2023). Investigation into the Key Barriers to Achieving UK “Construction 2025” Strategy Targets. Engineering Management in Production and Services, 15(4), 116–127. https://doi.org/10.2478/emj-2023-0032 Ehsan, N., Ali, E. S., & Mirza, I. (2011). Formulation of road asset management system of Pakistan. Remote Sensing, Environment and Transportation Engineering (RSETE), 2011 International Conference On, 8281–8284. https://doi.org/10.1109/RSETE.2011.5964083 Institute of Civil Engineering (2020). Procuring Improved Construction Productivity Guidance Note. Institute of Civil Engineering, 210252, 1–10. https://www.ice.org.uk/media/df1iqonn/2022-07-25-pag_procurement_productivity_note_final.pdf Fan, Y., & Yin, Y. (2020). Research on Asset Management in Construction Phase of PPP Project - - Based on Tracking Auditing Perspective. IOP Conference Series: Materials Science and Engineering, 768(5). https://doi.org/10.1088/1757-899X/768/5/052046 Fitzpatrick, T. (2013). Industry reacts to Construction 2025. Construction News. Floros, G. S., & Ellul, C. (2021). LOSS of INFORMATION during DESIGN & CONSTRUCTION for HIGHWAYS ASSET MANAGEMENT: A GEOBIM PERSPECTIVE. ISPRS Annals of the Photogrammetry, Remote Sensing and Spatial Information Sciences, 8(4/W2-2021), 83–90. https://doi.org/10.5194/isprs-annals-VIII-4-W2-2021-83-2021 Fukuda, R. (2018). Cedac: A tool for continuous systematic improvement (1st ed.). Routledge. Rezahoseini, A., Noori, S., Ghannadpour, S. F., & Bodaghi, M. (2019). Reducing rework and increasing the civil projects quality, through Total Quality Management (TQM), by using the concept of building information modeling (BIM). Journal of Industrial and Systems Engineering, 12(1), 0. http://www.jise.ir/article_76543.html Gifford, J. L., & Carlisle, W. H. (2004). Virginia department of transportation’s dashboard performance measurement and reporting system going the full monty. Transportation Research Record, 1895, 207–219. https://doi.org/10.3141/1895-26 Golafshani, N. (2003). Understanding Reliability and Validity in Qualitative Research. The Qualitative Report, 8(4), 597–606. https://doi.org/10.46743/2160-3715/2003.1870 Green, S. (2013). At it again: Critique of UK government’s industrial strategy for construction. Construction Research and Innovation, 4(3), 12–15. https://doi.org/10.1080/20450249.2013.11873892 Gruneberg, S. (2018). A strategic approach to the UK construction industry. Oxon: Routledge. https://www.routledge.com/A-Strategic-Approach-to-the-UK-Construction-Industry/Gruneberg/p/book/9781032178486 Hall, G. T. H. M. (2023). Meeting with Graeme for Project Process. Online Meeting. Hanley, B. P., & Clayton, R. J. (2008). Smarter Asset Management for Renewable Energy. IET Institution of Engineering and Technology, 2020, 1–6. Hardy, E. (2014). Construction 2025: how Considerate Constructors Scheme is helping to build the future of the industry. Construction News. Harisson, F. & Lock, D. (2017). Advanced project management: a structured approach (4th Edition). Routledge. Haupt, T. C., & Whiteman, D. E. (2004). Inhibiting factors of implementing total quality management on construction sites. The TQM Magazine, 16(3), 166–173. https://doi.org/10.1108/09544780410532891 He, Y., Song, Z., & Liu, Z. (2017). Updating highway asset inventory using airborne LiDAR. Measurement: Journal of the International Measurement Confederation, 104, 132–141. https://doi.org/10.1016/j.measurement.2017.03.026 HM Government. (2012). Industrial strategy: government and industry in partnership, Building Information Modeling (BIM). HM, Vol.1(Feb-2009), pp 225-231. https://doi.org/10.1016/j.aei.2007.03.001 HM Government. (2013). 2-Construction 2025. Industrial Strategy: Government and industry in partnership. UK Government, July, 78. https://doi.org/HM Government. HM Government. (2015). Digital Built Britain Level 3 Building Information Modelling - Strategic Plan. UK Government, February, 1–47. HM Government. (2017). Boosting construction productivity could deliver £15 billion savings every year. https://www.gov.uk/government/news/boosting-construction-productivity-could-deliver-15-billion-savings-every-year HMSO. (2011). Government Construction Strategy. Construction, May. http://www.cabinetoffice.gov.uk/sites/default/files/resources/Government-Construction-Strategy_0.pdf %5B [Accessed 23.11.11] Highways Agency. (2014). Asset Data Management Manual, Appendices a-G. In Highways Agency (Vol. 71, Issue 9). Hove, S. E., & Anda, B. (2005). Experiences from conducting semi-structured interviews in empirical software engineering research. Proceedings - International Software Metrics Symposium, 2005(Metrics), 10–23. https://doi.org/10.1109/METRICS.2005.24 Huber, T. L., Winkler, M. A. E., Dibbern, J., & Brown, C. V. (2020). The use of prototypes to bridge knowledge boundaries in agile software development. Information Systems Journal, 30(2), 270–294. https://doi.org/10.1111/isj.12261 Index., C. (2017). Industry targets are not being measured. Jonassen, D., Davidson, M., Collins, M., Campbell, J., & Haag, B. B. (1995). Constructivism and computer‐mediated communication in distance education. American Journal of Distance Education, 9(2), 7–26. https://doi.org/10.1080/08923649509526885 Jung, J. K., Sinha, S. K., & Whittle, L. G. (2014). Development of a Water Infrastructure Knowledge Database. Journal of Infrastructure Systems, 20(1), 04013006. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000163 King, N., & Horrocks, C. (2010). Interviews in qualitative research (C. Horrocks (ed.)). Los Angeles: SAGE, 2010. Kostic, T. (2003). Asset management in electrical utilities: how many facets it actually has. 2003 IEEE Power Engineering Society General Meeting (IEEE Cat. No.03CH37491), 1. https://doi.org/10.1109/PES.2003.1267182 Landers, J. (2008). Water Pipeline Database Will Improve Asset Management. Civil Engineering (08857024), American Society of Civil Engineers. Le, T., & Jeong, H.D. (2016). Interlinking life-cycle data spaces to support decision making in highway asset management. Automation in Construction, 64, 54–64. https://doi.org/10.1016/j.autcon.2015.12.016 Le, T., Le, C., & Jeong, H.D. (2018). Lifecycle Data Modeling to Support Transferring Project-Oriented Data to Asset-Oriented Systems in Transportation Projects. Journal of Management in Engineering, 34(4), 1–13. https://doi.org/10.1061/(asce)me.1943-5479.0000620 Lewis, J. (2009). Redefining Qualitative Methods: Believability in the Fifth Moment. International Journal of Qualitative Methods, 8(2), 1–14. https://doi.org/10.1177/160940690900800201 Li, H. (1996). The role of IT manager in construction process re‐engineering. Building Research & Information, 24(2), 124–127. https://doi.org/10.1080/09613219608727512 Lincoln, Y. S., & Guba, E. G. (1985). Naturalistic inquiry (E. G. Guba (ed.)). Beverly Hills, California. Malterud, K. (2001). Qualitative research (en medicina): standards, challenges, and guidelines.: EBSCOhost. Qualitative Research Series, 358(August, 11), 483–488. http://web.a.ebscohost.com.eza.udesa.edu.ar/ehost/pdfviewer/pdfviewer?vid=4&sid=418f25c8-6388-464a-b616-d3778f3f27e3%40sessionmgr4006 Maxwell, J. A. (1996). Qualitative research design: an interactive approach. London: Sage, 1996. McClure, T., & Yuan, C. (2016). Leveraging Construction Inspection and Documentation for Asset Inventory and Life Cycle Asset Management. Journal of Information Technology in Construction (ITcon), 21(April), 72–85. McHugh, D. (2023). Dave McHugh, Technology and Innovation Manager, Personal Communication. Miller, T., BIRCH, M., MAUTHNER, M. & JESSOP, J. (2012). Ethics in qualitative research. In Sage (1st ed.). Munslow, J. J. (2011). Asset Management? For roads? Developing a holistic asset management approach in a local highway authority service. IET and IAM Asset Management Conference 2011, 42–42. https://doi.org/10.1049/cp.2011.0556 NBS. (2023). NBS. https://www.thenbs.com/knowledge/bim-dimensions-3d-4d-5d-6d-bim-explained Orb, A., Eisenhauer, L., & Wynaden, D. (2001). Ethics in qualitative research. Journal of Nursing Scholarship, 33(1), 93–96. https://doi.org/10.1111/j.1547-5069.2001.00093.x Patel, T., Suthar, V., Bhatt, N., Pathak, K. K., Bandara, J. M. S. J., & Agrawal, R. (2021). Application of Remotely Piloted Unmanned Aerial Vehicle in Construction Management (Vol. 77, pp. 319–329). https://doi.org/10.1007/978-981-15-5195-6_25 Pickard, H, Wilczek, M, Fedyk, K, Davies, S, Imms, E. (2023). Geographic information systems for infrastructure asset management. ciria. https://products.ihserc.com/tmp_stamp/49503501/NVDWWGAAAAAAAAAA.pdf?sess=49503501&prod=CIS1 Poksinska, B., Dahlgaard, J. J., & Antoni, M. (2002). The state of ISO 9000 certification: A study of Swedish organizations. TQM Magazine, 14(5), 297–306. https://doi.org/10.1108/09544780210439734 Rashid Maqbool, Johnny Rezai Namaghi, Yahya Rashid, A. A. (2023). How modern methods of construction would support to meet the sustainable construction 2025 targets, the answer is still unclear. Ain Shams Engineering Journal. https://doi.org/10.1016/j.asej.2022.101943 RICS. (2018). RICS and industry insight paper responds to Construction 2025. Construction Journal, 6. Ridley, D. (2012). The literature review: A step-by-step guide for students (2nd ed.). Los Angeles, California; London : SAGE, 2012. Rowley, J., & Rowley, J. (2014). Conducting research interviews. https://doi.org/10.1108/01409171211210154 Shoshan, A. A. A., & Çelik, G. (2018). Application of TQM in the Construction Industry of Developing Countries - Case of Turkey. ANADOLU UNIVERSITY JOURNAL OF SCIENCE AND TECHNOLOGY A - Applied Sciences and Engineering, 19(1), 177–191. https://doi.org/10.18038/aubtda.345779 Sitzabee, W. E., Rasdorf, W., Hummer, J. E., & Devine, H. A. (2009). Data Integration of Pavement Markings: A Case in Transportation Asset Management. Journal of Computing in Civil Engineering, 23(5), 288–298. https://doi.org/10.1061/(ASCE)0887-3801(2009)23:5(288) Teall, O. (2014). Building information modelling in the highways sector: major projects of the future. Proceedings of the ICE - Management, Procurement and Law, 167(3), 127–133. https://doi.org/10.1680/mpal.13.00018 Tor, O., & Shahidehpour, M. (2006). Power distribution asset management. 2006 IEEE Power Engineering Society General Meeting, 1–7. https://doi.org/10.1109/PES.2006.1709234 Turkan, Y., Guo, F., & Jahren, C. T. (2015). Electronic document management systems for transportation construction industry. Electronic Journal of Information Technology in Construction, 1–8. U.S.A Department of Transportation Federal Highway Administration. (2010). Model Inventory of Roadway Elements. MIRE, Version 1.0. In FHWA (Issue October). Vallance, A., (Mouchel /BIM Developer). (2015). 3D BIM - M1 Smart Motorway. One Team. Young, E. &. (2018). Strategic Outline Business Case for the delivery of Digital Built Britain Programme Level 3. Yuan, C., McClure, T., Cai, H., & Dunston, P. S. (2017). Life-Cycle Approach to Collecting, Managing, and Sharing Transportation Infrastructure Asset Data. Journal of Construction Engineering and Management, 143(6). https://doi.org/10.1061/(asce)co.1943-7862.0001288 Yuan, C., McClure, T., Dunston, P. S., & Cai, H. (2016). Survey on the Practice Hurdles in Collecting, Managing, and Sharing Transportation Infrastructure Asset Data. Construction Research Congress 2016: Old and New Construction Technologies Converge in Historic San Juan - Proceedings of the 2016 Construction Research Congress, CRC 2016. https://doi.org/10.1061/9780784479827.165"],"dcterms:accessrights":["public"],"dc:title":["A Digital Platform for Handling the Construction Build Process in Highways Infrastructure"],"dc:type":["Thesis"],"dc:type.qualificationlevel":["doctoral"],"dc:type.qualificationname":["Ph.D"]},"updated_at":"2026-11-18T23:26:40Z"}