{"id":{"repo_id":"wvu","oai_identifier":"oai:researchrepository.wvu.edu:etd-5219"},"canonical_url":"https://search.ndltd.org/etd/wvu/oai:researchrepository.wvu.edu:etd-5219","repository":{"repo_id":"wvu","name":"West Virginia University","base_url":"https://researchrepository.wvu.edu/do/oai/"},"display":{"title":"Evaluate the adaptability of present licensing requirements to new nuclear fuels for use in current reactors","abstract":"Currently there is no comprehensive plan available for the methodology, timeline, and cost structure needed when licensing for new nuclear fuels, cladding, and geometry. By combining various sources from the NRC, nuclear vendor documents, and experience from engineers who have worked on licensing standard nuclear materials, a methodology, timeline, and cost structure for licensing new fuels, cladding, and geometry was developed. The specific scenarios of fuels, cladding, and geometry were used to outline the common advantages and disadvantages of changing the physical properties or physical structure of the standard nuclear fuel assembly. From these changes, the timeline and costing analyses were performed. It was determined from the timeline and costing analyses that the most advantageous development scenario was to combine the fuel and cladding licensing together and license the fuel/cladding combination for over 100 Gigawatt-days per metric ton of uranium.","abstract_html":"Currently there is no comprehensive plan available for the methodology, timeline, and cost structure needed when licensing for new nuclear fuels, cladding, and geometry. By combining various sources from the NRC, nuclear vendor documents, and experience from engineers who have worked on licensing standard nuclear materials, a methodology, timeline, and cost structure for licensing new fuels, cladding, and geometry was developed. The specific scenarios of fuels, cladding, and geometry were used to outline the common advantages and disadvantages of changing the physical properties or physical structure of the standard nuclear fuel assembly. From these changes, the timeline and costing analyses were performed. It was determined from the timeline and costing analyses that the most advantageous development scenario was to combine the fuel and cladding licensing together and license the fuel/cladding combination for over 100 Gigawatt-days per metric ton of uranium.","abstract_has_math":false,"creators":["Paletta, Samuel A."],"institution":null,"degree_name":"MS","degree_level":"Thesis","degree_discipline":"Chemical and Biomedical Engineering","degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":null,"date_issued":"","date_published":null,"updated_at":"2026-11-19T09:17:23Z","subjects":["Chemical engineering","Nuclear engineering","Energy"],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier","label":"Identifier","values":["https://researchrepository.wvu.edu/etd/4182"],"render_values":[{"text":"https://researchrepository.wvu.edu/etd/4182","href":"https://researchrepository.wvu.edu/etd/4182","code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://doi.org/10.33915/etd.4182","outbound_label":"DOI","outbound_source":"dc:identifier","record_url":"https://doi.org/10.33915/etd.4182","record_label":"Repository record","record_kind":"doi","record_source":"dc:identifier","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://researchrepository.wvu.edu/do/oai/?verb=GetRecord&metadataPrefix=oai_etdms&identifier=oai%3Aresearchrepository.wvu.edu%3Aetd-5219","prefix":"oai_etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:creator","label":"Author","values":["Paletta, Samuel A."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.created","label":"Dc Date Created","values":["2005-01-01T08:00:00Z"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Chemical and Biomedical Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Thesis"]},{"key":"thesis:degree_name","label":"Degree Name","values":["MS"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Chemical engineering","Nuclear engineering","Energy"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["https://doi.org/10.33915/etd.4182","https://researchrepository.wvu.edu/etd/4182"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Currently there is no comprehensive plan available for the methodology, timeline, and cost structure needed when licensing for new nuclear fuels, cladding, and geometry. By combining various sources from the NRC, nuclear vendor documents, and experience from engineers who have worked on licensing standard nuclear materials, a methodology, timeline, and cost structure for licensing new fuels, cladding, and geometry was developed. The specific scenarios of fuels, cladding, and geometry were used to outline the common advantages and disadvantages of changing the physical properties or physical structure of the standard nuclear fuel assembly. From these changes, the timeline and costing analyses were performed. It was determined from the timeline and costing analyses that the most advantageous development scenario was to combine the fuel and cladding licensing together and license the fuel/cladding combination for over 100 Gigawatt-days per metric ton of uranium."]},{"key":"dc:title","label":"Title","values":["Evaluate the adaptability of present licensing requirements to new nuclear fuels for use in current reactors"]}]}],"canonical_facts":{"dc:creator":["Paletta, Samuel A."],"dc:date.created":["2005-01-01T08:00:00Z"],"dc:description.abstract":["Currently there is no comprehensive plan available for the methodology, timeline, and cost structure needed when licensing for new nuclear fuels, cladding, and geometry. By combining various sources from the NRC, nuclear vendor documents, and experience from engineers who have worked on licensing standard nuclear materials, a methodology, timeline, and cost structure for licensing new fuels, cladding, and geometry was developed. The specific scenarios of fuels, cladding, and geometry were used to outline the common advantages and disadvantages of changing the physical properties or physical structure of the standard nuclear fuel assembly. From these changes, the timeline and costing analyses were performed. It was determined from the timeline and costing analyses that the most advantageous development scenario was to combine the fuel and cladding licensing together and license the fuel/cladding combination for over 100 Gigawatt-days per metric ton of uranium."],"dc:identifier":["https://doi.org/10.33915/etd.4182","https://researchrepository.wvu.edu/etd/4182"],"dc:subject":["Chemical engineering","Nuclear engineering","Energy"],"dc:title":["Evaluate the adaptability of present licensing requirements to new nuclear fuels for use in current reactors"],"thesis:degree_discipline":["Chemical and Biomedical Engineering"],"thesis:degree_level":["Thesis"],"thesis:degree_name":["MS"]},"updated_at":"2026-11-19T09:17:23Z"}