{"id":{"repo_id":"wvu","oai_identifier":"oai:researchrepository.wvu.edu:etd-8777"},"canonical_url":"https://search.ndltd.org/etd/wvu/oai:researchrepository.wvu.edu:etd-8777","repository":{"repo_id":"wvu","name":"West Virginia University","base_url":"https://researchrepository.wvu.edu/do/oai/"},"display":{"title":"Evaluation of Process and Economic Feasibility of Implementing a Topping Cycle Cogeneration System","abstract":"Industrial applications that require steam for their end-uses generally utilize steam boilers that are at higher size than what is typically required. Similarly, gas turbine-based power plants corroborate the gas turbine system and eventually relieve the exhaust into the atmosphere. These facilities include food, paper, chemicals, refining, and primary metal manufacturing industries. This research focuses on the scope of a topping cycle combined heat and power (CHP) system by pushing the load on the boiler to a higher limit, or a gas turbine operation in place of a boiler system for a topping cycle CHP and its economic feasibility by utilizing the turbine exhaust to achieve the technological and economical evaluation of a CHP system. The excess steam is run through a condensing steam turbine to generate power that can offset the facility’s electricity usage cost and under favorable conditions, sell electricity back to the grid. Similarly, the steam turbine outlet water can be used to satisfy the plant’s heating needs in the form of comfort and district heating. A decision tool was developed to evaluate the technical and economic feasibility of a topping cycle CHP system, which can emulate a given facility’s steam or gas system and its operational parameters with steam turbines. It will help the user realize the point of breakeven (in terms of fuel cost incurred and overall cost savings) at the desired steam flow rate for a corresponding boiler system. Similarly, sensitive analysis of energy, power, cost savings, and payback of investment to boiler and steam parameters is also carried out. The research would provide necessary insights into the most appropriate parameters that will enable a CHP system to be advantageous in technical and economic aspects. The research determines that the fuel cost, electricity cost, and the steam quantity flowing through the turbines are the most important parameters for a desirable payback on the investment.","abstract_html":"Industrial applications that require steam for their end-uses generally utilize steam boilers that are at higher size than what is typically required. Similarly, gas turbine-based power plants corroborate the gas turbine system and eventually relieve the exhaust into the atmosphere. These facilities include food, paper, chemicals, refining, and primary metal manufacturing industries. This research focuses on the scope of a topping cycle combined heat and power (CHP) system by pushing the load on the boiler to a higher limit, or a gas turbine operation in place of a boiler system for a topping cycle CHP and its economic feasibility by utilizing the turbine exhaust to achieve the technological and economical evaluation of a CHP system. The excess steam is run through a condensing steam turbine to generate power that can offset the facility’s electricity usage cost and under favorable conditions, sell electricity back to the grid. Similarly, the steam turbine outlet water can be used to satisfy the plant’s heating needs in the form of comfort and district heating. A decision tool was developed to evaluate the technical and economic feasibility of a topping cycle CHP system, which can emulate a given facility’s steam or gas system and its operational parameters with steam turbines. It will help the user realize the point of breakeven (in terms of fuel cost incurred and overall cost savings) at the desired steam flow rate for a corresponding boiler system. Similarly, sensitive analysis of energy, power, cost savings, and payback of investment to boiler and steam parameters is also carried out. The research would provide necessary insights into the most appropriate parameters that will enable a CHP system to be advantageous in technical and economic aspects. The research determines that the fuel cost, electricity cost, and the steam quantity flowing through the turbines are the most important parameters for a desirable payback on the investment.","abstract_has_math":false,"creators":["Karki, Unique"],"institution":null,"degree_name":"MS","degree_level":"Thesis","degree_discipline":"Industrial and Managements Systems Engineering","degree_department":null,"school":null,"contributors":["Bhaskaran Gopalakrishnan","Ashish Nimbarte","Kenneth Robert Means"],"advisors":[],"committee_chairs":[],"committee_members":[],"year":null,"date_issued":"","date_published":null,"updated_at":"2026-11-19T09:25:47Z","subjects":["Topping Cycle CHP","Cogeneration","Steam Boilers","Economics","Energy Systems"],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier","label":"Identifier","values":["https://researchrepository.wvu.edu/etd/7737"],"render_values":[{"text":"https://researchrepository.wvu.edu/etd/7737","href":"https://researchrepository.wvu.edu/etd/7737","code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://doi.org/10.33915/etd.7737","outbound_label":"DOI","outbound_source":"dc:identifier","record_url":"https://doi.org/10.33915/etd.7737","record_label":"Repository record","record_kind":"doi","record_source":"dc:identifier","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://researchrepository.wvu.edu/do/oai/?verb=GetRecord&metadataPrefix=oai_etdms&identifier=oai%3Aresearchrepository.wvu.edu%3Aetd-8777","prefix":"oai_etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["Bhaskaran Gopalakrishnan","Ashish Nimbarte","Kenneth Robert Means"]},{"key":"dc:creator","label":"Author","values":["Karki, Unique"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.available","label":"Dc Date Available","values":["2020-07-22T07:00:00Z"]},{"key":"dc:date.created","label":"Dc Date Created","values":["2020-01-01T08:00:00Z"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Industrial and Managements Systems Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Thesis"]},{"key":"thesis:degree_name","label":"Degree Name","values":["MS"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Topping Cycle CHP","Cogeneration","Steam Boilers","Economics","Energy Systems"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["https://doi.org/10.33915/etd.7737","https://researchrepository.wvu.edu/etd/7737"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Industrial applications that require steam for their end-uses generally utilize steam boilers that are at higher size than what is typically required. Similarly, gas turbine-based power plants corroborate the gas turbine system and eventually relieve the exhaust into the atmosphere. These facilities include food, paper, chemicals, refining, and primary metal manufacturing industries. This research focuses on the scope of a topping cycle combined heat and power (CHP) system by pushing the load on the boiler to a higher limit, or a gas turbine operation in place of a boiler system for a topping cycle CHP and its economic feasibility by utilizing the turbine exhaust to achieve the technological and economical evaluation of a CHP system. The excess steam is run through a condensing steam turbine to generate power that can offset the facility’s electricity usage cost and under favorable conditions, sell electricity back to the grid. Similarly, the steam turbine outlet water can be used to satisfy the plant’s heating needs in the form of comfort and district heating. A decision tool was developed to evaluate the technical and economic feasibility of a topping cycle CHP system, which can emulate a given facility’s steam or gas system and its operational parameters with steam turbines. It will help the user realize the point of breakeven (in terms of fuel cost incurred and overall cost savings) at the desired steam flow rate for a corresponding boiler system. Similarly, sensitive analysis of energy, power, cost savings, and payback of investment to boiler and steam parameters is also carried out. The research would provide necessary insights into the most appropriate parameters that will enable a CHP system to be advantageous in technical and economic aspects. The research determines that the fuel cost, electricity cost, and the steam quantity flowing through the turbines are the most important parameters for a desirable payback on the investment."]},{"key":"dc:title","label":"Title","values":["Evaluation of Process and Economic Feasibility of Implementing a Topping Cycle Cogeneration System"]}]}],"canonical_facts":{"dc:contributor":["Bhaskaran Gopalakrishnan","Ashish Nimbarte","Kenneth Robert Means"],"dc:creator":["Karki, Unique"],"dc:date.available":["2020-07-22T07:00:00Z"],"dc:date.created":["2020-01-01T08:00:00Z"],"dc:description.abstract":["Industrial applications that require steam for their end-uses generally utilize steam boilers that are at higher size than what is typically required. Similarly, gas turbine-based power plants corroborate the gas turbine system and eventually relieve the exhaust into the atmosphere. These facilities include food, paper, chemicals, refining, and primary metal manufacturing industries. This research focuses on the scope of a topping cycle combined heat and power (CHP) system by pushing the load on the boiler to a higher limit, or a gas turbine operation in place of a boiler system for a topping cycle CHP and its economic feasibility by utilizing the turbine exhaust to achieve the technological and economical evaluation of a CHP system. The excess steam is run through a condensing steam turbine to generate power that can offset the facility’s electricity usage cost and under favorable conditions, sell electricity back to the grid. Similarly, the steam turbine outlet water can be used to satisfy the plant’s heating needs in the form of comfort and district heating. A decision tool was developed to evaluate the technical and economic feasibility of a topping cycle CHP system, which can emulate a given facility’s steam or gas system and its operational parameters with steam turbines. It will help the user realize the point of breakeven (in terms of fuel cost incurred and overall cost savings) at the desired steam flow rate for a corresponding boiler system. Similarly, sensitive analysis of energy, power, cost savings, and payback of investment to boiler and steam parameters is also carried out. The research would provide necessary insights into the most appropriate parameters that will enable a CHP system to be advantageous in technical and economic aspects. The research determines that the fuel cost, electricity cost, and the steam quantity flowing through the turbines are the most important parameters for a desirable payback on the investment."],"dc:identifier":["https://doi.org/10.33915/etd.7737","https://researchrepository.wvu.edu/etd/7737"],"dc:subject":["Topping Cycle CHP","Cogeneration","Steam Boilers","Economics","Energy Systems"],"dc:title":["Evaluation of Process and Economic Feasibility of Implementing a Topping Cycle Cogeneration System"],"thesis:degree_discipline":["Industrial and Managements Systems Engineering"],"thesis:degree_level":["Thesis"],"thesis:degree_name":["MS"]},"updated_at":"2026-11-19T09:25:47Z"}