Spelling suggestions: "subject:"[een] PRODUCTION SCHEDULING"" "subject:"[enn] PRODUCTION SCHEDULING""
171 |
Multi-objective generation scheduling with hybrid energy resourcesTrivedi, Manas. January 2007 (has links) (PDF)
Thesis (Ph.D.)--Clemson University, 2007. / Adviser: Elham B. Makram. Includes bibliographical references.
|
172 |
Issues in shared-memory multiprocessor scheduling : a performance evaluation /Squillante, Mark S. January 1990 (has links)
Thesis (Ph. D.)--University of Washington, 1990. / Includes bibliographical references (leaves [125]-135).
|
173 |
A heuristic algorithm for operating yard cranes over storage blocks to minimize the handling time in a container yard /Denkaew, Weerakit. January 1900 (has links)
Thesis (M.S.)--Oregon State University, 2010. / Printout. Includes bibliographical references (leaves 73-76). Also available on the World Wide Web.
|
174 |
A modified shifting bottleneck approach to job shop scheduling with sequence dependent setups (MSBSS) /Sun, Xiaoqing, January 1997 (has links)
Thesis (Ph. D.)--University of Missouri-Columbia, 1997. / Typescript. Vita. Includes bibliographical references (leaves 119-128). Also available on the Internet.
|
175 |
A stochastic project scheduling problem with resource constraints /Tai, Chia-Hung C. January 1997 (has links)
Thesis (Ph. D.)--University of Missouri-Columbia, 1997. / Typescript. Vita. Includes bibliographical references (leaves 117-118). Also available on the Internet.
|
176 |
Cost-constrained project scheduling with task durations and costs that may increase over time demonstrated with the U.S. Army future combat systems /Grose, Roger T. January 2004 (has links) (PDF)
Thesis (M.S. in Operations Research)--Naval Postgraduate School, 2004. / Title from title screen (viewed June 28, 2005). "June 2004." Includes bibliographical references (p. 59-61). Also issued in paper format.
|
177 |
Development of an order promising framework for furniture industryBhoot, Abhishek. January 2004 (has links)
Thesis (M.S.)--Mississippi State University. Department of Industrial Engineering. / Title from title screen. Includes bibliographical references.
|
178 |
Simulation based scheduling using interactive data and lean concepts in a manufacturing industrySelvaraju, Sathishkumar. January 2009 (has links)
Thesis (M.S.)--State University of New York at Binghamton, Thomas J. Watson School of Engineering and Applied Science, Department of Systems Science and Industrial Engineering, 2009. / Includes bibliographical references.
|
179 |
A modified shifting bottleneck approach to job shop scheduling with sequence dependent setups (MSBSS)Sun, Xiaoqing, January 1997 (has links)
Thesis (Ph. D.)--University of Missouri-Columbia, 1997. / Typescript. Vita. Includes bibliographical references (leaves 119-128). Also available on the Internet.
|
180 |
A stochastic project scheduling problem with resource constraintsTai, Chia-Hung C. January 1997 (has links)
Thesis (Ph. D.)--University of Missouri-Columbia, 1997. / Typescript. Vita. Includes bibliographical references (leaves 117-118). Also available on the Internet.
|
Page generated in 0.05 seconds