Spelling suggestions: "subject:"[een] STEEL CONSTRUCTION"" "subject:"[enn] STEEL CONSTRUCTION""
71 |
Příprava a realizace výstavby výrobní haly s administrativou / Preparation and realization of the construction of a production hall with administrationHesková, Veronika January 2019 (has links)
This diploma thesis solves the construction and technological preparation of the production hall with administration building for company Mont-Tech localized in Brno. The following documents are processed for the project. These are: technical report, coordination situation with wider transport route relationships, time and financial plan for construction, study of the implementation of the main technological stages, design of site facilities, proposal of the main building machines and mechanisms, technological regulations and related control and testing plans. In addition were prepared – the itemized budget of the main buildings, the plan of safety and health protection and construction details.
|
72 |
Nové brněnské hlavní nádraží a jeho veřejná prostranství / Brno New Train Station and its Public SpacesNytrová, Bohdana January 2020 (has links)
For almost one hundred years, Brno has been deciding where the place of a new main train station should be. The works have almost started several times, but the various affairs have always postponed it. Two years ago, it was finally decided that „the River option“ would be constructed. So far, only the technological template has been written – e. g. railway bridge or platforms outline. The thesis focuses on the architectural design of the main building, the roof construction above the railways and spaces below the station bridge. In the design, the outlying urban structures are also dealt with. These include the locations of a bus station, taxi services and bike stands. Moreover, the design also mentions the station’s connection to the city networks. The main motive of the design is to put the main train station building into the centre of the city’s attractions – to make it visible. A boulevard’s view is oriented to the St. Peter’s cathedral – a famous Brno’s building. Just as the mentioned cathedral, the station is important for the city and deserves to be seen. A strong arched construction on four pillars serves as a roof over the railways and places where most visitors are expected to be most of the time. The arch also connects the public transport lines and the bus station. Part of a roof shaped like waves around the main hall connects the structure with the riverside nearby.
|
73 |
Nové brněnské hlavní nádraží a jeho veřejná prostranství / Brno New Train Station and its Public SpacesSedláček, Jakub January 2020 (has links)
The topic of the Diploma thesis is a design of the New train station in Brno. The plot is located on the boundary of three city districts – Komárov, Štýřice and Trnitá. This area includes the railway structure for the new train station and also its public spaces, which are very close to the river Svratka. The railway structure is designed as bridge construction, that rises all platforms and rail tracks to 7,65 metres above the ground level. So all of the railways do not become a barrier in the city. The main concept extends a longitudinal axis of the city boulevard through the train station, which creates a high-rise building in the southern part of the plot. This axis is written not only to the layout but also to the roof design. The train station includes two underground levels, ground floor and first floor. Underground levels consist of P+R parking, deliveries only area, technical facilities and subway terminal. The ground floor is the main traffic centre. There is an entrance hall, shopping area, bus terminal and public corridors. The first floor includes platforms for train departures and arrivals. There are also public spaces in the entrance hall. The basic structural system consists of two parts. The first part is a massive reinforced concrete structure of the railway bridge deck and all underground levels. This structure is based on reinforced concrete foundation pads with drilled piles. The second part is a steel frame structure of the roof. That includes steel columns and truss girders for the structure of the lower area. The higher part of the roof is designed as a steel-truss bridge with the characteristic profile. The new train station supposes to create a new gate to the city of Brno, that connects contemporary districts with the historical city center.
|
74 |
Vícepodlažní budova / Multi-storey buildingJetonický, Pavel January 2013 (has links)
The subject of the master´s thesis is the design and assessment of the static load-bearing steel structure office building. It is an eight-storey building with a floor plan and dimensions 54x15m. The proposal has three variants. In one of them a steel frame with a hinge attached elements. These are the pillars, beams, trusses, joists and purlins, which are coupled with trapeze plate and thereby secure the stability of the position in the horizontal direction. The steel structure is placed between the reinforced concrete towers.
|
75 |
Jízdárna / HippodromeVáclavíková, Veronika January 2013 (has links)
The theme of this Master´s thesis is to design and assess the load Bering steel structure of the hippodrome in Napajedla. The hippodrome is solved as a hall object in two alternatives. Both alternatives are elliptical in shape with dimensions of 40 and 80 m. Load bearing structure of the chosen alternative is formed by transversely oriented column binding with the axial spacing of 6,0 m. Transversely oriented binding is formed from spatial lattice truss supported by fixed solid columns. The spatial rigidity of the structure is ensured by fixing columns in the transverse direction and by using transverse braces in the longitudinal direction. The longitudinal braces help to ensure the spatial rigidity. The work consists of the design and assessment of the main load bearing components, the solution of chosen details of joints and columns´ anchoring, solution of construction component and the elaboration of statement of material and drawings´ documentation.
|
76 |
Výstavní pavilon / Exhibition PavilionShánělová, Lenka January 2014 (has links)
The Master´s thesis contains design of steel construction of exhibition pavilion, which is consists of columns, dome, lantern and suspension footbridge. Building will be intended for organizing exhibitions and conferences by town Trutnov. Two models of variants of dome´s construction are drafted in this work– Schwedler´s and Föpple´s dome. Models are space tubular structures.The work contains static assessment of spatial structures and spherical steel joint in program SCIA Engineer for both variants. Hand assessment of bars, basic details and anchoring, technical report and drawing dokumentation are drafted for selected variant construction with Schwedler´s dome.
|
77 |
Skladovací hala ve Znojmě - stavebně technologický projekt / CONSTRUCTION-TECHNOLOGICAL PROJECT OF STORAGE HALL IN ZNOJMOHolubová, Jolana January 2014 (has links)
The diploma‘s thesis solves the realization of the storage hall and the other building operations. There are detailed follow up the technological rules for demolition work, special foundation – drilled piles and assembling of steel construction. The project includes the project of the construction site facilities, machine set, budget, quality of the implementation, time plan and safety.
|
78 |
Vojenské muzeum v Králíkách - stavebně technologický projekt / Military museum Kraliky - planning of implementation and management of constructionKucsera, Adam January 2014 (has links)
This thesis is aimed at the Military Museum in Kraliky. This construction made on the basis of the initial design of the designer. For this reason, it was necessary to deal with during the processing work some technical problems, transport of materials to the construction site or purely site layout itself. The whole area of the museum consists of several buildings. The largest and main building of the exposition hall with steel supporting structures, then there is the Administration building, which in turn is a brick workshop that has as Exp hall steel structure. There is also a replica of the First Republic Military cottage, which has a wooden frame and demonstration area, where there will be live demonstrations of military equipment.
|
79 |
Vybrané části stavebně technologického projektu - LOGISTICKÉ CENTRUM HEMAT / Selected parts of Construction-Technological Project - LOGISTICS CENTER HEMATValouch, Ondřej January 2015 (has links)
The subject of my thesis are selected parts of construction technology project – construction of the logistics center Hemat in Ostrava. This thesis solves technological regulations for foundations and installation of the main steel structure. It also includes a technical report, technical report site equipment, suitable choice of construction machinery, timetables, itemized budget, inspection and test plan, occupational safety, dealing with traffic routes, situation of site equipment.
|
80 |
Zastřešení víceúčelového sportovního objektu / The Roof Structure of a Multipurpose Sport BuildingMichálek, Vojtěch January 2015 (has links)
The topic of the thesis is a project of roof of a multifunctional sport object with a ground-plan covering area 35x48m, and maximum height of 16m. This construction is projected for Brno and its surroundings. The project of roofing is evolved in two different variants. First one is formed by double-jointed arched latticed truss. Supporting components such as purlins, lateral and longitudal bracings, frontal column and anchorage are designed and assessed in static calculation. At the end of the thesis, comparison of both variants is elaborated. Design documentation, which consists of dispositional drawing, drawing of truss for manufacturing, drawing of indicative details and plan of anchorage, is a part of the thesis.
|
Page generated in 0.0318 seconds