• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • Tagged with
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

[en] ON THE DECISION-HAZARD APPROACH FOR THE STOCHASTIC DUAL DYNAMIC PROGRAMMING APPLIED TO HYDROTHERMAL OPERATION PLANNING / [pt] UMA ABORDAGEM DECISÃO-ACASO PARA A PROGRAMAÇÃO DINÂMICA DUAL ESTOCÁSTICA APLICADA AO PLANEJAMENTO DA OPERAÇÃO HIDROTÉRMICA

ANDRE LAWSON PEDRAL SAMPAIO 05 April 2019 (has links)
[pt] A Programação Dinâmica Dual Estocástica (PDDE) constitui um dos métodos mais utilizados no planejamento hidrotérmico. Trabalhos anteriores neste campo se baseiam numa abordagem tipo acaso-decisão, enquanto a realidade está mais próxima de um processo tipo decisão-acaso. Tal dissonância entre planejamento e implementação gera um problema de inconsistência temporal, pois decisões futuras planejadas podem não ser colocadas em prática sob as mesmas condições. Se por um lado a modelagem acaso-decisão permite uma metodologia de solução cenário-decomponível eficiente, por outro, a estrutura decisão-acaso proporciona uma solução mais robusta (pessimista), já que desconsidera a antecipatividade. Neste trabalho, mensura-se o gap de inconsistência relativo a metodologia atual, assim como se propõe uma abordagem alternativa para o planejamento hidrotérmico que utiliza uma estrutura de revelação de incertezas e um processo decisório tipo decisão-acaso, aproximando o modelo de planejamento da realidade operativa. Ao invés de empregar restrições de não-antecipatividade, o que impossibilitaria a decomposição por cenário de cada subproblema estocástico de dois estágios, a metodologia proposta considera decisões de primeiro estágio como variáveis de estado a serem otimizadas via PDDE. Assim, reduz-se consideravelmente a complexidade e tempo necessário para se obter uma solução, garantindo ainda a estrutura decisória tipo decisão-acaso e não-antecipatividade das decisões de primeiro estágio. Resultados baseados no SIN indicam que tal inconsistência pode levar a um aumento considerável da geração de termelétricas mais caras, causando maior volatilidade nos preços de curto prazo e aumento no custo total de operação. Desta forma, a solução metodológica proposta, baseada na abordagem decisão-acaso via espaço de estado aumentado, constitui contribuição relevante e oportuna tanto para práticas na indústria quanto para o estado-da-arte da literatura utilizada para o planejamento da operação hidrotérmica sob incerteza. / [en] Stochastic Dual Dynamic Programming (SDDP) is currently one of the most employed methods for hydrothermal planning. All previous works on this subject are based on a hazard-decision approach, whereas reality is more closely related to a decision-hazard process. This dissonance between planning and implementation is a source of time-inconsistency, as future planned decisions under the same conditions may not be put into practice. If on the one hand the hazard-decision modeling framework allows a scenario-decomposable efficient solution methodology, on the other hand the decision-hazard structure provides a more robust (pessimistic) solution as it does not rely on anticipativity assumptions. In this work, we measure the inconsistency-gap related to the current methodology and propose an alternative approach for hydrothermal planning that utilizes an informationrevelation structure and decision process based on a decision-hazard framework, thereby approximating the planning model to realistic operational actions. Instead of relying on non-anticipativity constraints, which would prevent the scenario decomposition of each two-stage stochastic subproblem, the proposed methodology considers first-stage decisions as state variables to be optimized through the SDDP procedure. In this framework, the complexity and time required to find a solution is considerably reduced yet ensuring the decision-hazard decision structure and non-anticipativity of the first-stage decisions. Results based on the Brazilian power system indicate that this inconsistency may considerably increase generation of more expensive thermal units, leading to spikes in energy market spot prices and an increase in overall operational costs. Therefore, the proposed decision-hazard approach and augmented-state solution methodology constitute timely and relevant contributions to both industry practices and state of the art literature on the subject of hydrothermal operation planning under uncertainty.

Page generated in 0.0371 seconds