• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • Tagged with
  • 2
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

[en] PRIMARY CONSOLIDATION SETTLEMENT DUE TO RAMP LOADING / [pt] RECALQUE DE ADENSAMENTO PRIMÁRIO DEVIDO A CARREGAMENTO LINEARMENTE CRESCENTE NO TEMPO

VITOR DOS SANTOS ALBUQUERQUE 11 April 2022 (has links)
[pt] O método empírico de Terzaghi (1943) para cálculo do recalque de adensamento primário com carregamento dependente do tempo é comparado com dois métodos propostos nesta pesquisa: o primeiro, baseado na alteração da fração de tempo em que cada incremento de carregamento é aplicado de forma instantânea, e o segundo mantendo a proposta inicial de Terzaghi (1943), porém realizando reduções percentuais do grau médio de adensamento para o período de construção e obtendo novas frações de tempo para o período pós-construção. Os resultados mostram que com a adoção das frações de tempo, apresentadas em tabelas, a diferença entre os valores do grau médio de adensamento determinados pelas curvas teórica e empírica varia entre 1,50 por cento a 3,50 por cento, dependendo das condições iniciais de excesso de poropressão. O segundo método, mais exato, apresenta diferenças menores, com ambas as curvas praticamente sobrepostas. Adicionalmente, outras duas soluções alternativas são investigadas considerando o carregamento em degraus e discretizado. Uma solução matemática rigorosa também é apresentada para representar o problema de adensamento com drenos verticais, considerando a hipótese de deformações livres. Uma comparação com a solução proposta por Olson (1977), fundamentada no conceito de deformações iguais, mostra que a hipótese de deformações iguais subestima o grau médio de dissipação dos excesoss de poropressão entre 1,15 por cento a 4,84 por cento, e que essa diferença tende a diminuir para tempos de construção elevados. Finalmente, soluções para fluxo vertical e radial combinados também são obtidas, considerando a hipótese de deformações livres e a formulação proposta por Carrillo (1942). / [en] Terzaghi s (1943) empirical method for calculating primary consolidation settlement due to ramp loading is compared with two methods proposed in this research: the first one, based on changing the fraction of time in which each loading increment is applied instantly, and the second keeping Terzaghi s initial proposal (1943), but making reductions in the average degree of consolidation for the construction period and determining new fractions of time for the post-construction period. The results show that with the hypothesis of time fractions, the difference between the values of the average degree of consolidation determined by the theoretical and empirical curves varies between 1.50 percent to 3.50 percent, depending on the initial conditions of excess poropressure. The second method is even more accurate with both curves practically overlapping. Additionally, two other alternative solutions are investigated considering step and discretized loadings. A rigorous mathematical solution is also presented to represent the consolidation problem with vertical drains, considering the hypothesis of free deformations. A comparison with the solution proposed by Olson (1977), based on the concept of equal deformations, shows that the hypothesis of equal deformations underestimates the average degree of consolidation between 1.15 percent to 4.84 percent, and this difference tends to decrease for long construction periods. Finally, solutions for the vertical and radial flow combined is also obtained, considering the hypothesis of free deformations and the formulation proposed by Carrillo (1942).
2

[pt] APLICABILIDADE DE DRENOS VERTICAIS PARA MITIGAR EFEITOS DE LIQUEFAÇÃO DINÂMICA DE SOLOS / [en] APPLICABILITY OF WICK DRAINS TO MITIGATE EFFECTS OF DYNAMIC LIQUEFACTION IN SOILS

MARCUS GABRIEL SOUZA DELFINO 07 August 2023 (has links)
[pt] A história registra ao longo dos séculos muitos casos de colapso de depósitos de solos arenosos, com consideráveis prejuízos econômicos, perdas de vidas humanas e danos ao meio ambiente, causados pela liquefação dinâmica ou por mobilidade cíclica. Quando um desempenho satisfatório de estruturas não puder ser garantido sob carregamento sísmico, métodos de mitigação devem ser empregados para reduzir o potencial de liquefação. Dentre estes, a execução de drenos verticais é solução interessante, mas desafiadora, pois drenos verticais podem ser utilizados caso dissipem suficientemente rápido os excessos de poropressão e transportem eficientemente o volume de água durante os poucos segundos de duração de terremotos. Uma dificuldade é a avaliação do coeficiente de permeabilidade do depósito de solo, o que afeta e torna incerta a distância desejável entre drenos. Nesta dissertação, análises do desempenho de drenos verticais para mitigação de liquefação dinâmica são realizadas com base em formulações matemáticas e modelos numéricos pelo método dos elementos finitos. / [en] Throughout centuries there are many recorded cases of collapse of sandy deposits with considerable economic losses, loss of human life and damage to the environment caused by the dynamic liquefaction or cyclic mobility. When a satisfactory performance of structures can’t be guaranteed under seismic loading, methods of mitigation must be employed in order to reduce the potential of liquefaction. Among these methods, the execution of prefabricated vertical drains is an interesting, but challenging, solution, because drains can be used if they dissipate very quickly the excess of porepressure generated during the small duration of earthquakes. One of the main challenges is to evaluate the coefficient of permeability of the deposit which affects and brings uncertainties to the desirable distance between the drains installed. On this work, analysis of the performance of vertical drains to mitigate dynamic liquefaction are performed based in mathematical formulations and numerical models through the Finite Element Method.

Page generated in 0.0499 seconds