• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 3
  • Tagged with
  • 3
  • 3
  • 3
  • 3
  • 3
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

[en] INSTRUMENTED LOAD TEST CARRIED OUT IN A PILED QUAY STRUCTURE / [pt] PROVA DE CARGA INSTRUMENTADA EM UM CAIS APOIADO SOBRE ESTACAS

ERIC ARTHUR DE FREITAS PENEDO 04 September 2018 (has links)
[pt] Esta dissertação apresenta os dados de um teste de carga instrumentado em um cais, enfatizando a importância da instrumentação de campo para melhor compreender o comportamento da estrutura durante o teste. Dentro desta abordagem, foi realizada uma revisão sobre o comportamento de grupo de estacas, direcionada à influência do espaçamento entre estacas na interação entre as mesmas, e da rigidez do bloco na distribuição de carga entre as estacas, no fator de segurança das mesmas e das distorções angulares do bloco. Em seguida, foram descritas as características geométricas e geotécnicas do cais testado, e foram apresentadas as características da instrumentação utilizada, composta por extensômetros elétricos, eletroníveis e nível topográfico, desde sua montagem e calibração, até a sua instalação em campo. Foi destacada a utilização dos eletroníveis, que apesar de pouco utilizados na prática da engenharia geotécnica, são instrumentos versáteis, precisos e podem ser reutilizados. O procedimento do teste de carga foi realizado de modo a simular a situação real da maneira mais próxima da realidade, onde foram monitoradas as deformações em quatro estacas, a rotação e o recalque da laje do cais. A estrutura apresentou bom desempenho durante o teste, com baixo nível de deformação nas estacas, distorção angular desprezível e baixos valores de recalque total e residual. / [en] This dissertation presents the data of an instrumented load test in a wharf, emphasizing the importance of field instrumentation to analyze the behavior of the structure during the load test. First, a review was carried out on the behavior of pile groups, focusing on the influence of pile spacing in the interaction factors. It also considered the influence of the raft stiffness on the load distribution and factor of safety of the piles. The main characteristics of the wharf were presented, such as, geometry, dimensions, deformability and strength properties of the concrete. The geological and geotechnical subsoil profile have been presented, indicating a soft clay layer resting on a very compact residual soil. The particularities of the instrumentation used on the test, composed by strain gauges, electrolevels and a topographic level, were presented since the assembly and calibration, to the installation on field. Despite its underutilization in geotechnical engineering practice, the use of electrolevels was emphasized, due to its versatility, accuracy and the fact that they can be reutilized. The load test procedure was made to simulate the real situation as close as possible, where strain in four piles, rotation and settlement of the deck were monitored. The structure performanced well during the test, presenting low level of strain in piles, negligible angular distortion of the deck and low values of total and residual settlements.
2

[en] USE OF ELECTRO-LEVELS TO OBTAIN DEFLECTION AND BENDING MOMENT IN CONCRETE FACED ROCKFILL DAMS / [pt] APLICAÇÃO DE ELETRONÍVEIS PARA OBTENÇÃO DAS DEFLEXÕES E DOS MOMENTOS FLETORES NA FACE DE CONCRETO DE BARRAGENS DE ENROCAMENTO

DANILO TOLEDO RAMOS 31 May 2010 (has links)
[pt] Este trabalho descreve a montagem, calibração e instalação de 80 (oitenta) eletroníveis na face de concreto da Barragem de Mazar, que consiste em uma Barragem de Enrocamento com Face de Concreto de 166 m de altura localizada na parte sudeste do Equador, no rio Paute. A barragem possui taludes a montante de 1,4(H):1,0(V) e a jusante de 1,5(H):1,0(V), com volume de enrocamento de 5.000.000 m3. Os eletroníveis foram instalados ao longo de quatro seções na face de concreto em diferentes etapas do processo construtivo da barragem, permitindo a observação do comportamento deste elemento de vedação desde o inicio da construção. Para a interpretação foram desenvolvidas rotinas que possibilitaram, além da automatização, a criação de uma interface gráfica para acompanhamento. Os resultados indicaram com precisão os deslocamentos da face e acusaram regiões críticas com relação à atuação de momentos fletores, ratificando a importância do monitoramento da face de concreto desde o início da sua execução. / [en] This thesis describes the procedures involved in the montage, calibration and installation of 80 (eighty) electro-levels on the concrete face of Mazar’s dam, located in the Paute river, southeast of Ecuador. This dam consists of a Concrete Face Rockfill Dam 166m high and it has upstream slopes of 1.4(h):1.0(v) and downstream slopes of 1.5(h):1.0(v). The rockfill volume is 5000000 m3. Electro-levels were installed throughout 4 sections on the concrete face in different phases of the dam construction, allowing the behavior observation of its concrete face since the beginning of the construction. For the interpretation of the results, some routines were developed to allow not only the automation of the process but also the development of graphic interface for following the process. The results indicated with precision the face displacements and showed critical regions related to the bending moment, which confirms the importance of monitoring the concrete face during all the construction stages.
3

[en] APPLICATION OF ELECTROLEVELS IN GEOTECHNICAL INSTRUMENTATION / [es] APLICABILIDAD DE LOS ELECTRONÍVELES EN LA INSTRUMENTACIÓN GEOTÉCNICA / [pt] APLICABILIDADE DOS ELETRONÍVEIS NA INSTRUMENTAÇÃO GEOTÉCNICA

CHAN KOU WHA 16 February 2001 (has links)
[pt] O surgimento da instrumentação geotécnica se deu entre os anos de 1930 e 1940 e inicialmente observa-se a utilização de instrumentos mecânicos e hidraúlicos para essa finalidade. Entretanto nos últimos anos tem se acentuado a utilização de equipamentos baseados em princípios elétricos tais como os extensômetros elétricos resistivos e os eletroníveis que podem ser acoplados a eficientes sistemas de aquisição de dados. Há portanto a necessidade de intensificação de esforços na utilização de técnicas mais precisas e abrangentes de monitoramento do comportamento real de obras geotécnicas, tendo em vista o distanciamento que hoje se constata entre o refinamento, sofisticação e versatilidade dos métodos computacionais e numéricos em relação à qualidade, e até mesmo representatividade das informações oriundas de programas observacionais na engenharia geotécnica. A finalidade deste trabalho é verificar a aplicabilidade dos eletroníveis nos programas de instrumentação geotécnica e desenvolver procedimentos específicos de montagem, calibração, instalação e interpretação. Essa técnica de instrumentação, apesar de consagrada internacionalmente é ainda de utilização restrita no nosso país. E finalmente apresenta-se o tratamento de dados realizado com as informações obtidas no programa de instrumentação das barragens de Xingó e Tianshegqiao (TSQ-1). / [en] Geotechnical instrumentation development, has begin 1930 and 1940 and initialy we can observe the use of hydhraulic and mechanic instruments to this purpose. Meanwhile in the last years it can be observed the increase of the use these equipaments based on electrical principle like resistance extensometers and electrolevels that can be coupled to efficient system data aquisition. So there is need of the use of techique more precise and comprehensive for monitoring actual behaviour of geotechincal work so the big distance that there is between refinement, sofistication and versatility of computacional and numeric methods in relationship quality and representative information from observation programs in the geotechincal engineering, can be shortened. The main purpose of this research is to verify the aplication of electrolvel gauges in geothecnical instrumentation program and to develop specific procedure of assembly, calibration, installation and interpretation. This instrumentation technique in spite of being internationally established is still of restricted use in our country. Results obtained in two large concrete face rockfill dams (Xingo and TSQ-1) are presented. / [es] El surgimento de la instrumentación geotécnica se dió entre los años 1930 y 1940 e inicialmente se observa la utilización de instrumentos mecánicos y hidraúlicos con tal finalidad. En los últimos años se ha acentuado la utilización de equipos basados en principios eléctricos tales como los extensómetros eléctricos resistivos y los electroníveles que pueden ser acoplados a eficientes sistemas de adquisición de datos. Ha por tanto necesidad de intensificar esfuerzos en la utilización de técnicas más precisas y abarcadoras para el monitoramiento del comportamiento real de obras geotécnicas; llevando en cuenta el distanciamiento que hoy se constata entre el refinamiento, sofistificación y versatilidad de los métodos computacionales y numéricos en relación a la calidad, e incluso representatividad de las informaciones oriundas de programas observacionales en la ingeniería geotécnica. La finalidad de este trabajo es verificar la aplicabilidad de los electroníveles en los programas de instrumentación geotécnica y desarrollar procedimientos específicos de montaje, calibración, instalación e interpretación. Esta técnica de instrumentación, a pesar de consagrada internacionalmente, tienen uso restringido en nuestro país. Finalmente se presenta el tratamiento de datos realizado con las informaciones obtenidas en el programa de instrumentación de las Barragens de Xingó y Tianshegqiao (TSQ-1).

Page generated in 0.0258 seconds